170 nos Plots in sector 10, Siddharth vihar yojna, Ghaziabad
by U.P. Awas Evam Vikas Parishad
Ghaziabad, Uttar Pradesh · UPRERAPRJ403668/11/2025
Overview
Registration Date2025-11-27
RERA NumberUPRERAPRJ403668/11/2025
Promoter IDUPRERAPRM4243
Proposed Start2026-01-01
Proposed Completion2030-04-27
Location
DistrictGhaziabad
TehsilGhaziabad
VillageSector 10
AddressSiddharth Vihar Yojna, Ghaziabad
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Plots170
Khasra records (1)
- 315· Khasra· 42675 m²
Inventory
Plots
| Type | Size range | Count |
|---|---|---|
| Plot | UPTO 100 sqm | 56 |
| Plot | 100 to 150 sqm | 101 |
| Plot | 250 to 500 sqm | 6 |
| Plot | Above 500 sqm | 7 |
Permits & Approvals
Permit No1305
Permit Date2025-05-02
Valid Until2030-04-27
Extendable Until2033-04-27
Documents
Filing documents
- Details of Encumbrances
- Other Plan(If Any)
- Proforma of Allotment Letter
- Proforma of Conveyance Deed
- Waste Disposal Plan
- Other
- Details of Encumbrances#New(2025-08-25)View
- Commencement Certificate#New(2025-08-27)View
- Other Plan(If Any)#New(2025-08-25)View
- Proforma of Application Form#New(2025-07-03)View
- Proforma of Completion Certificate(Occupancy)#New(2025-07-03)View
- Waste Disposal Plan#New(2025-08-25)View
- Water Supply Plan#New(2025-08-25)View
- Electricity Supply Plan#New(2025-08-25)View
- Development Work Plan#New(2025-08-25)View
- Affidavit (Form-B)#New(2025-07-03)View
- CA CERTIFICATE#New(2025-07-03)View
- ARCHITECT CERTIFICATE#New(2025-07-03)View
- ENGINEERS CERTIFICATE#New(2025-07-03)View
- Proforma of Agreement for Sale#New(2025-07-03)View
Land documents
- Extract of Khatauni#01.07.2021 TO 30.06.2027(1900-01-01)View16057142723.pdf
Project Team
Architect AddressNEELGIRI COMPLEX ,SECOND FLOOR INDIRANAGAR LUCKNOW
Engineer AddressSECTOR 16A VASUNDHARA COMPLEX GHAZIABAD-201012
Developer & Contact
Developer
Promoter NameU.P. Awas Evam Vikas Parishad
Promoter Address104 Mahatma Gandhi Marg, Lucknow
Company TypeCompetent authority
Mobile8189081725
Emailupavp-rera@upavp.com
Registered Address104 Mahatma Gandhi Marg, Lucknow
Contractor AddressCD GHAZIABAD 2 VASUNDHARA
Bank Accounts
Account Typecollection
Account Number99999917062025
Account NameUPAVP-COLL ACC-170 SEC-10 SVY GZB
Bank NameHDFC BANK
BranchVASUNDHARA
Branch AddressC-415, Om plaza, Sector-15, Vasundhara Ghaziabad
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCHDFC0000563
Branch Emailabhishek.pandey1@hdfcbank.com
Account Typeseparate
Account Number99999918062025
Account NameUPAVP-SEP ACC-170 SEC-10 SVY GZB
Bank NameHDFC BANK
BranchVASUNDHARA
Branch AddressC-415, Om Plaza,Sector-15 Vasundhara Ghaziabad
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCHDFC0000563
Account Typetransaction
Account Number99999919062025
Account NameUPAVP-TRANS ACC-170 SEC-10 SVY GZB
Bank NameHDFC BANK
BranchVASUNDHARA
Branch AddressC-415, Om Plaza, Sector-15, Vasundhara, Ghaziabad
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCHDFC0000563
Development & Facilities
Development works
Demarcation Of Plotsas per layout approved by housing Commisioner, Demarcation of plot must be done by Bricks or Stone Pillars.
Boundary WallN/A
Road Work7.5 M wide and 9.0 M wide road will be constructed as per approved layout Plan. All Trunk Roads are already constructed.
FootpathsN/A
Water Supply Including Drinking Water FacilitiesAs per approved design and drawings approved by UP Avas Evam Vikas Parishad the internal water supply will be laid all trunk water supply line are already laid with 1700 KL OHT and Two CWR of 2500 KL Capacity .
Sewer SystemInternal Sewer line will be laid as per approved layout By UP Avas Evam Vikas Parishad . All Trunk sewer lines are already laid with STP .
DrainInternal Drains will be constructed as per Approved Layout by UP Avas Evam Vikas Parishad.
ParksAs Per Approved Layout . The 3 Nos. of parks lash Of Trees and Greenery. The park Toe Wall constructed by Brickwork or Mild Steel grill.
Tree PlantingN/A
Design For Electric Supply Including Street LightingElectric sub station are already constructed and Trunk Electric Services are already completed. Electric lines will be laid as per approved layout by UP Avas Evam Vikas Parishad .
Community BuildingsThere is community center already constructed at sector 09 Sidharth Vihar Yojana Ghaziabad.
Treatment And Disposal System Of Sewage And Sullage WaterTrunk sewer line is already laid and connected with sewerage Treatment Plant in Sidharth Vihar Yojana Ghaziabad. Internal sewer line of proposed plots will be laid as per approved plan by UP Avas Evam Vikas Parishad.
Solid Waste Management And Disposal SystemAlready planned in Sidharth Vihar yojana Ghaziabad.
Water Conservation SystemTo be developed by Plot owner as per guidelines.
Energy Management System Including Use Of Renewable EnergyTo be developed by plot owner as per guidelines.
Fire Protection And Fire Safety SystemTo be developed by plot owner as per guidelines.
Social Infrastructure And Other Public Amenities Including Public Health ServicesTo be developed as per Government guidelines.
Emergency Evacuation ServicesTo be developed as per Government guidelines.
Other Miscellaneous WorkN/A
Financials
Registration Fee (₹)327750
Project Duration (months)52