AANAND VIHAR RESIDENTIAL SCHEME
by HAPUR PILKHUWA DEVELOPMENT AUTHORITY
Hapur, Uttar Pradesh · UPRERAPRJ311040
Overview
Registration Date2019-03-13
RERA NumberUPRERAPRJ311040
Promoter IDUPRERAPRM12131
Proposed Start2009-02-12
Proposed Completion2026-08-30
Location
DistrictHapur
TehsilSelect
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeOngoing
Plots3108
Khasra records (1)
- 452 TO 605, 1 TO 574, 597 TO 713· Khasra· 1525488 m²
Inventory
Plots
| Type | Size range | Count |
|---|---|---|
| Plot | 100 to 150 sqm | 371 |
| Plot | 150 to 200 sqm | 789 |
| Plot | 200 to 250 sqm | 57 |
| Plot | UPTO 100 sqm | 1612 |
| Plot | 250 to 500 sqm | 279 |
Permits & Approvals
Permit NoSELF APPROVED
Permit Date2018-08-30
Valid Until2023-08-30
Extendable Until2026-08-30
Documents
Filing documents
- Commencement Certificate
- Commencement Certificate
- Other Plan(If Any)
- CA CERTIFICATE
- ARCHITECT CERTIFICATE
- ENGINEERS CERTIFICATE
- Details of Encumbrances#New(2018-12-29)View
- Proforma of Application Form#New(2018-12-29)View
- Proforma of Allotment Letter#New(2018-12-29)View
- Proforma of Conveyance Deed#New(2018-12-29)View
- Proforma of Completion Certificate(Occupancy)#New(2018-12-29)View
- Waste Disposal Plan#New(2019-02-21)View
- Water Supply Plan#New(2019-02-21)View
- Electricity Supply Plan#New(2019-02-21)View
- Development Work Plan#New(2019-02-21)View
- Affidavit (Form-B)#New(2019-03-02)View
- CA CERTIFICATE#New(2019-02-25)View
- ARCHITECT CERTIFICATE#New(2019-02-22)View
- ENGINEERS CERTIFICATE#New(2019-02-22)View
Land documents
- Extract of Khatauni#2006(1900-01-01)View184606616KHETONI.pdf
Project Team
Architect AddressABOVE
Engineer AddressABOVE
Developer & Contact
Developer
Promoter NameHAPUR PILKHUWA DEVELOPMENT AUTHORITY
Promoter AddressPREET VIHAR DELHI ROAD HAPUR UP 245101 INDIA
Company TypeCompetent authority
Mobile7455025100
Emailhpda_1@rediffmail.com
Registered AddressPREET VIHAR DELHI ROAD HAPUR UP 245101 INDIA
Contractor AddressDelhi Road, Preet Vihar Hapur.
Development & Facilities
Development works
Demarcation Of PlotsPLOTS ARE DEMARCATED
Boundary WallNOT NEEDED
Road WorkMOSTLY ZONAL ROADS ARE COMPLETED WHERE AS THE INTERNAL ROADS IN SOME BLOCKS HAVE TO BE COMPLETED .
FootpathsSAME AS ABOVE
Water Supply Including Drinking Water FacilitiesALMOST TRUNK WATER SUPPLY LINES ARE LAID IN THE WHOLE SCHEME AND OVERHEAD TANK HAVE BEEN CONSTRUCTED AND INTERNAL WATER LINES IN SOME BLOCKS HAVE TO BE LAID.
Sewer SystemSAME AS ABOVE
DrainALMOST TRUNK DRAINS HAVE BEEN CONSTRUCTED IN THE WHOLE SCHEME AND IN FEW BLOCKS INTERNAL DRAINS HAVE TO BE CONSTRUCTED .
ParksMAIN PARKS HAVE BEEN COMPLETED AND FEW PARK IN DIFFERENT BLOCKS HAVE TO BE COMPLETED.
Tree PlantingALMOST DONE
Design For Electric Supply Including Street LightingSTREET LIGHTING ALMOST COMPLETED ON MAIN ROADS WHERE AS IN FEW BLOCKS HAS TO BE COMPLETED
Community BuildingsCONSTRUCTED
Treatment And Disposal System Of Sewage And Sullage WaterTRUNK SEWER LINES WILL BE CONNECTED TO STP
Solid Waste Management And Disposal SystemWILL BE ESTABLISHED
Water Conservation SystemRAIN WATER HARVESTING SYSTEM WILL BE CONSTRUCTED
Energy Management System Including Use Of Renewable EnergySUBSTATION HAS BEEN COMPLETED AND IS OPERATIONAL
Fire Protection And Fire Safety SystemWILL BE INSTALLED AS PER REQUIREMENT
Social Infrastructure And Other Public Amenities Including Public Health ServicesPLOTS HAVE BEEN DEMARCATED
Emergency Evacuation ServicesWILL BE INSTALLED AS PER REQUIREMENT
Other Miscellaneous WorkWILL BE INSTALLED AS PER REQUIREMENT
Financials
Registration Fee (₹)7632500
Project Duration (months)217