ADITYA SCO COMPLEX
by UTILITY ESTATES PRIVATE LIMITED
Ghaziabad, Uttar Pradesh · UPRERAPRJ645055/09/2024
Total units
108
Overview
Registration Date2024-09-27
RERA NumberUPRERAPRJ645055/09/2024
Promoter IDUPRERAPRM1595
Proposed Start2024-08-01
Proposed Completion2028-12-31
Location
DistrictGhaziabad
TehsilGhaziabad
VillagePARK TOWN
LocalityINTEGRATED TOWNSHIP, SHAHPUR BAMHETA, PARGANA DASNA,
AddressPLOT NO.- COMMERCIAL-2
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units108
Unit Types1
Blocks1
Floors5
Khasra records (4)
- 1643· Khasra· 1038 m²
- 1644· Khasra· 1136 m²
- 1645· Khasra· 1229 m²
- 1646· Khasra· 8861 m²
Inventory
Apartments (78 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| ADITYA SCO COMPLEX | BSMNT | SHOP | 1 | 18.81 | 0 | — |
| ADITYA SCO COMPLEX | BSMNT | SHOP | 1 | 68.44 | 0 | — |
| ADITYA SCO COMPLEX | BSMNT | SHOP | 4 | 81.74 | 0 | — |
| ADITYA SCO COMPLEX | BSMNT | SHOP | 1 | 81.2 | 0 | — |
| ADITYA SCO COMPLEX | BSMNT | SHOP | 1 | 82.67 | 0 | — |
| ADITYA SCO COMPLEX | BSMNT | SHOP | 1 | 84.94 | 0 | — |
| ADITYA SCO COMPLEX | BSMNT | SHOP | 2 | 86.44 | 0 | — |
| ADITYA SCO COMPLEX | BSMNT | SHOP | 1 | 86.42 | 0 | — |
| ADITYA SCO COMPLEX | BSMNT | SHOP | 1 | 158.66 | 0 | — |
| ADITYA SCO COMPLEX | GF | SHOP | 1 | 51.05 | 0 | — |
| ADITYA SCO COMPLEX | GF | SHOP | 1 | 78.88 | 0 | — |
| ADITYA SCO COMPLEX | GF | SHOP | 3 | 94.22 | 0 | — |
| ADITYA SCO COMPLEX | GF | SHOP | 1 | 94.33 | 0 | — |
| ADITYA SCO COMPLEX | GF | SHOP | 1 | 95.15 | 0 | — |
| ADITYA SCO COMPLEX | GF | SHOP | 1 | 95.31 | 0 | — |
| ADITYA SCO COMPLEX | GF | SHOP | 1 | 98.07 | 0 | — |
| ADITYA SCO COMPLEX | GF | SHOP | 1 | 99.67 | 0 | — |
| ADITYA SCO COMPLEX | GF | SHOP | 1 | 99.33 | 0 | — |
| ADITYA SCO COMPLEX | GF | SHOP | 1 | 100.85 | 0 | — |
| ADITYA SCO COMPLEX | GF | SHOP | 1 | 178.27 | 0 | — |
| ADITYA SCO COMPLEX | 1 | SHOP | 1 | 18.79 | 0 | — |
| ADITYA SCO COMPLEX | 1 | SHOP | 1 | 68.44 | 0 | — |
| ADITYA SCO COMPLEX | 1 | SHOP | 4 | 81.74 | 0 | — |
| ADITYA SCO COMPLEX | 1 | SHOP | 1 | 81.2 | 0 | — |
| ADITYA SCO COMPLEX | 1 | SHOP | 1 | 82.67 | 0 | — |
| ADITYA SCO COMPLEX | 1 | SHOP | 1 | 84.94 | 0 | — |
| ADITYA SCO COMPLEX | 1 | SHOP | 2 | 86.44 | 0 | — |
| ADITYA SCO COMPLEX | 1 | SHOP | 1 | 84.9 | 0 | — |
| ADITYA SCO COMPLEX | 1 | SHOP | 1 | 177.97 | 0 | — |
| ADITYA SCO COMPLEX | 2 | SHOP | 1 | 22.27 | 0 | — |
| ADITYA SCO COMPLEX | 2 | SHOP | 1 | 22.5 | 0 | — |
| ADITYA SCO COMPLEX | 2 | SHOP | 1 | 22.39 | 0 | — |
| ADITYA SCO COMPLEX | 2 | SHOP | 1 | 24.96 | 0 | — |
| ADITYA SCO COMPLEX | 2 | SHOP | 1 | 25.09 | 0 | — |
| ADITYA SCO COMPLEX | 2 | SHOP | 3 | 24.96 | 0 | — |
| ADITYA SCO COMPLEX | 2 | SHOP | 1 | 25.09 | 0 | — |
| ADITYA SCO COMPLEX | 2 | SHOP | 1 | 25.25 | 0 | — |
| ADITYA SCO COMPLEX | 2 | SHOP | 1 | 25.41 | 0 | — |
| ADITYA SCO COMPLEX | 2 | SHOP | 1 | 25.26 | 0 | — |
| ADITYA SCO COMPLEX | 2 | SHOP | 3 | 26.46 | 0 | — |
| ADITYA SCO COMPLEX | 2 | SHOP | 2 | 26.56 | 0 | — |
| ADITYA SCO COMPLEX | 2 | SHOP | 1 | 24.92 | 0 | — |
| ADITYA SCO COMPLEX | 2 | SHOP | 1 | 178.62 | 0 | — |
| ADITYA SCO COMPLEX | 2 | SHOP | 1 | 24.99 | 0 | — |
| ADITYA SCO COMPLEX | 2 | SHOP | 3 | 29.68 | 0 | — |
| ADITYA SCO COMPLEX | 2 | SHOP | 1 | 29.93 | 0 | — |
| ADITYA SCO COMPLEX | 2 | SHOP | 1 | 28.61 | 0 | — |
| ADITYA SCO COMPLEX | 2 | SHOP | 1 | 28.23 | 0 | — |
| ADITYA SCO COMPLEX | 2 | SHOP | 1 | 27.92 | 0 | — |
| ADITYA SCO COMPLEX | 2 | SHOP | 1 | 28.07 | 0 | — |
| ADITYA SCO COMPLEX | 2 | SHOP | 1 | 28.27 | 0 | — |
| ADITYA SCO COMPLEX | 2 | SHOP | 3 | 28.02 | 0 | — |
| ADITYA SCO COMPLEX | 2 | SHOP | 1 | 36.19 | 0 | — |
| ADITYA SCO COMPLEX | 2 | SHOP | 1 | 28.27 | 0 | — |
| ADITYA SCO COMPLEX | 3 | SHOP | 1 | 22.27 | 0 | — |
| ADITYA SCO COMPLEX | 3 | SHOP | 1 | 22.5 | 0 | — |
| ADITYA SCO COMPLEX | 3 | SHOP | 1 | 22.39 | 0 | — |
| ADITYA SCO COMPLEX | 3 | SHOP | 4 | 24.96 | 0 | — |
| ADITYA SCO COMPLEX | 3 | SHOP | 2 | 25.09 | 0 | — |
| ADITYA SCO COMPLEX | 3 | SHOP | 2 | 25.25 | 0 | — |
| ADITYA SCO COMPLEX | 3 | SHOP | 1 | 25.41 | 0 | — |
| ADITYA SCO COMPLEX | 3 | SHOP | 3 | 26.46 | 0 | — |
| ADITYA SCO COMPLEX | 3 | SHOP | 2 | 26.56 | 0 | — |
| ADITYA SCO COMPLEX | 3 | SHOP | 1 | 24.92 | 0 | — |
| ADITYA SCO COMPLEX | 3 | SHOP | 1 | 178.62 | 0 | — |
| ADITYA SCO COMPLEX | 3 | SHOP | 1 | 24.99 | 0 | — |
| ADITYA SCO COMPLEX | 3 | SHOP | 3 | 29.68 | 0 | — |
| ADITYA SCO COMPLEX | 3 | SHOP | 1 | 29.93 | 0 | — |
| ADITYA SCO COMPLEX | 3 | SHOP | 1 | 28.61 | 0 | — |
| ADITYA SCO COMPLEX | 3 | SHOP | 1 | 28.23 | 0 | — |
| ADITYA SCO COMPLEX | 3 | SHOP | 1 | 27.92 | 0 | — |
| ADITYA SCO COMPLEX | 3 | SHOP | 1 | 28.07 | 0 | — |
| ADITYA SCO COMPLEX | 3 | SHOP | 1 | 28.27 | 0 | — |
| ADITYA SCO COMPLEX | 3 | SHOP | 2 | 28.02 | 0 | — |
| ADITYA SCO COMPLEX | 3 | SHOP | 1 | 28.27 | 0 | — |
| ADITYA SCO COMPLEX | 3 | SHOP | 1 | 28.02 | 0 | — |
| ADITYA SCO COMPLEX | 3 | SHOP | 1 | 36.19 | 0 | — |
| ADITYA SCO COMPLEX | 3 | SHOP | 1 | 45.76 | 0 | — |
Permits & Approvals
Permit NoCOMMERCIAL BUILDING/07390/GDA/BP/24-25/0448/11072024
Permit Date2024-07-29
Valid Until2029-07-28
Extendable Until2032-07-28
Documents
Filing documents
- Other Plan(If Any)
- Proforma of Allotment Letter
- Proforma of Completion Certificate(Occupancy)
- Other
- Details of Encumbrances#New(2024-08-01)View
- Commencement Certificate#New(2024-08-01)View
- Other Plan(If Any)#New(2024-09-24)View
- Proforma of Application Form#New(2024-08-01)View
- Proforma of Allotment Letter#New(2024-08-01)View
- Proforma of Conveyance Deed#New(2024-08-01)View
- Waste Disposal Plan#New(2024-08-01)View
- Water Supply Plan#New(2024-08-01)View
- Electricity Supply Plan#New(2024-08-17)View
- Development Work Plan#New(2024-08-01)View
- Affidavit (Form-B)#New(2024-08-01)View
- CA CERTIFICATE#New(2024-08-01)View
- ARCHITECT CERTIFICATE#New(2024-08-01)View
- ENGINEERS CERTIFICATE#New(2024-08-01)View
- Other#New(2024-09-06)View
- Proforma of Agreement for Sale#New(2024-08-01)View
Project Team
Architect AddressC-55, EAST OF KAILASH NEW DELHI-110065 PH. +91 11 46599599, WEBSITE WWW.GPMINDIA.COM
Engineer AddressFIRST FLOOR, H-53, COMMERCIAL AREA, SECTOR-63 NOIDA, UTTAR PRADESH PH +91 120 4240514
Developer & Contact
Developer
Promoter NameUTILITY ESTATES PRIVATE LIMITED
Promoter Address10, NEW RAJDHANI ENCLAVE, VIKAS MARG, DELHI - 110092
Company TypeCompany
Mobile9310702222
Emailuepl.rera@gmail.com
Registered Address10, NEW RAJDHANI ENCLAVE, VIKAS MARG, DELHI - 110092
Contractor AddressF-411, SECTOR-17, VASUNDHARA, GHAZIABAD, UTTAR PRADESH-201012
Bank Accounts
Account Typecollection
Account Number2402256457516227
Account NameUTILITY ESTATES PRIVATE LIMITED-COLLECTION ACCOUNT FOR ADITYA SCO COMPLEX
Bank NameAU SMALL FINANCE BANK LIMITED
BranchINDIRAPURAM GHAZIABAD
Branch AddressPLOT NO.- 8, SPACE NO. 1, GAUR GRAVITY BLOCK NO. A AND B, VAIBHAV KHAND INDIRAPURAM GHAZIABAD UTTAR PRADESH- 201014
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCAUBL0002480
Branch EmailINDRAPURAM_GHAZIABAD@AUBANK.IN
Account Typeseparate
Account Number2402256457436768
Account NameUTILITY ESTATES PRIVATE LIMITED-SEPARATE BANK ACCOUNT FOR ADITYA SCO COMPLEX
Bank NameAU SMALL FINANCE BANK LIMITED
BranchINDIRAPURAM GHAZIABAD
Branch AddressPLOT NO.- 8, SPACE NO.- 1, GAUR GRAVITY, BLOCK NO. A AND B, VAIBHAV KHAND, INDIRAPURAM GHAZIABAD, U.P. 201014
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCAUBL0002480
Account Typetransaction
Account Number2402256457832248
Account NameUTILITY ESTATES PRIVATE LIMITED-RERA TRANSACTION ACCOUNT FOR ADITYA SCO COMPLEX
Bank NameAU SMALL FINANCE BANK LIMITED
BranchINDIRAPURAM GHAZIABAD
Branch AddressPLOT NO.-8, SPACE NO.-1, GAUR GRAVITY BLOCK A AND B VAIBHAV KHAND INDIRAPURAM GHAZIABAD U.P. 201014
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCAUBL0002480
Development & Facilities
Development works
Demarcation Of Plots30.00 METER ROAD TO THE SOUTH EAST, OTHER PROPERTY TO THE NORTH WEST AND SOUTH WEST AND 30.00 METER GREEN BELT TO THE NORTH EAST.
Boundary WallCOMBINATION OF RCC COLUMN/BEAM WITH 230MM WIDE BRICK WORK/MS WORK WITH 1.80 METER HEIGHT APPROX.
Road WorkCOMBINATION OF 100MM THICK CONCRETE FLOORING/CONCRETE PAVER WITH GSB BASE HAVING DRIVE WAY WIDTH OF 6.00 METER.
FootpathsCOMBINATION OF PAVERS/SOFT DEVELOPMENT ON COMPACTED SUBGRADE.
Water Supply Including Drinking Water FacilitiesTHE MAIN SOURCE OF DRINKING WATER WILL BE GROUND WATER AND SHALL BE EXTRACTED THROUGH TUBE WELL AND SUPPLIED BY UNDERGROUND WATER TANK APPROX. 15 KLD RWA WATER/15KLD DOMESTIC TANK CAPACITY EACH AND OVERHEAD WATER TANK HAVING TWO CHAMBERS OF APRROXIMATE CAPACITY OF DOMESTIC 15 KL AND FIRE 10 KL EACH.
Sewer SystemTHE SOIL AND WASTE SHALL BE CARRIED DOWN IN SEPARATE INDEPENDENTLY VENTED RCC NP2 PIPES HAVING DIAMETER FROM 150MM TO 250MM. TWO PIPE DRAINAGE SYSTEMS SHALL BE ADOPTED AS PER ASPE STANDARD.
DrainSEPARATE AND INDEPENDENT RAINWATER DRAINAGE SYSTEM SHALL BE PROVIDED FOR COLLECTING RAINWATER FROM TERRACE, PAVED AREA, LAWNS AND ROAD WITH VERTICAL UPVC PIPES 100MM DIA AND HORIZONTAL RCC HUMES PIPES 200-300MM DIA.
ParksGreen Area is 349.58 sqm.
Tree PlantingDOCUMENT ATTACHED PLANTING STRATEGY APPROX. 15 TREES SHALL BE PLNTED ALONG BOUNDARY/OPEN AREA.
Design For Electric Supply Including Street Lighting11KV INCOMING SUPPLY SHALL BE PROVIDED. WHICH SHALL BE CONVERTED IN 415V SUPPLY AND SAME SHALL BE FEED ENTIRE SYSTEM. THE TIME SWITCH OPERATED EXTERNAL LIGHT SHALL BE PROVIDED. THE LUX LEVEL SHALL BE MEET AS PER NBC -2016 GUIDELINES. APPROX. 60 NO. OF DIFFERENT HEIGHT ALONG ROAD/OPEN AREAS ARE PLANNED.
Community BuildingsN.A.
Treatment And Disposal System Of Sewage And Sullage WaterCONNECTED TO SEWRAGE TREATMENT PLANT OF APPROX. CAPACITY OF 30 KLD FOR TREATMENT OF SEWRAGE AND SULLGE WASTE. THE PLANT SHALL COMPRISE OF PRELIMINARY, SECONDARY(CHEMICAL AND BIOLOGICAL) AND TERTIARY TREATMENT UNITS.
Solid Waste Management And Disposal SystemCLOSED CONTAINER WILL BE PROVIDE FOR COLLECTION OF SOLID WASTE AND WILL BE DISPOSED AS PER DUE PROCESS
Water Conservation System1 HARVESTING CHAMBER HAVING DESILTING CHAMBER OF 3.00 METER X 1.5 METER X 1.5 METER DEPTH AND HARVESTING PIT OF 3.0 METER DIAMETER AND 3 METER DEPTH SHALL BE DONE
Energy Management System Including Use Of Renewable EnergyYes, We are providing Solar Panel system as shown on terrace floor of sheet no. 5/6 in sanctioned drawing.
Fire Protection And Fire Safety SystemAS PER FIRE NORMS PROVIDED (NBC-2016)
Social Infrastructure And Other Public Amenities Including Public Health ServicesN.A. (It is a Commercial Building)
Emergency Evacuation ServicesSTAIRECASE HAVING WIDTH OF 1.50 METER AND 300MM TREAD/150MM RISER AS DESIRED WITH SINAGE PLANNED
Other Miscellaneous WorkNIL
Financials
Registration Fee (₹)45000
Project Duration (months)53