Registered
Overview
Registration Date2024-01-02
RERA NumberUPRERAPRJ225504
Promoter IDUPRERAPRM90241
Proposed Start2023-08-25
Proposed Completion2028-08-24
Location
DistrictBareilly
TehsilBareilly
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Plots61
Khasra records (5)
- 428,429,431,432· Khasra· 6298 m²
- 430· Khasra· 2660 m²
- 512(p)· Khasra· 800 m²
- 531(p)· Khasra· 733 m²
- 532(p)· Khasra· 72055 m²
Inventory
Plots
| Type | Size range | Count |
|---|---|---|
| Plot | UPTO 100 sqm | 26 |
| Plot | 100 to 150 sqm | 33 |
| Plot | 150 to 200 sqm | 2 |
Permits & Approvals
Permit NoBDA/LD/22-23/0147
Permit Date2023-08-25
Valid Until2028-08-24
Extendable Until2028-08-24
Documents
Filing documents
- Commencement Certificate
- Other Plan(If Any)
- Proforma of Completion Certificate(Occupancy)
- Details of Encumbrances#New(2023-09-13)View
- Proforma of Application Form#New(2023-09-14)View
- Proforma of Allotment Letter#New(2023-09-14)View
- Proforma of Conveyance Deed#New(2023-09-14)View
- Waste Disposal Plan#New(2023-09-13)View
- Water Supply Plan#New(2023-09-13)View
- Electricity Supply Plan#New(2023-09-14)View
- Development Work Plan#New(2023-10-24)View
- Affidavit (Form-B)#New(2023-09-14)View
- CA CERTIFICATE#New(2023-09-14)View
- ARCHITECT CERTIFICATE#New(2023-09-14)View
- ENGINEERS CERTIFICATE#New(2023-09-14)View
- Other#New(2023-11-09)View
Land documents
- Registry Document#12274(2021-10-01)View8530575840428,429,431,432 gift deed.pdf
- Registry Document#12275(2021-10-01)View8530577528430 gift deed.pdf
- Sale Deed#3881(2006-07-17)View8530575367512, 531, 532 manpreet kaur.pdf
- Sale Deed#3880(2007-07-17)View8530577159512,531,532 satnam kaur.pdf
- Extract of Khatauni#1430-1435(1900-01-01)View8530579178KHASRA AND 143.pdf
- Registry Document#consortium agreement(2023-10-20)View8530574368consortium.pdf
- Registry Document#SAJRA SUPERIMPOSED(2023-10-28)View8530577285RERA SHAJRA MAP SUPERIMPOSED FILE AERO CITY PHASE 2nd 18 (1) (2)-Model.pdf
Project Team
Architect AddressH NO. 9 RESIDENCY GARDEN STADIUM ROAD BAREILLY
Engineer Address79-80 RADHEY SHYAM ENCLAVE RAMPUR GARDEN BAREILLY 243001
Developer & Contact
Developer
Promoter NameKUNAL PROPERTIES
Promoter AddressVILLAGE KARAMPUR CHAUDHARY NAINITAL ROAD BAREILLY
Company TypePartnership Firm
Mobile7060094659
EmailRAJACHHABRA24@GMAIL.COM
Registered AddressVILLAGE KARAMPUR CHAUDHARY NAINITAL ROAD BAREILLY
Contractor Addressresidency garden bareilly
Bank Accounts
Account Typecollection
Account Number46680200000396
Account NameKUNAL PROPERTIES COLLECTION ACCOUNT AERO CITY PHASE II
Bank NameBANK OF BARODA
BranchMODEL TOWN BAREILLY
Branch AddressMODEL TOWN BAREILLY
Branch DistrictBareilly
Branch StateUttar Pradesh
IFSCBARB0MODBLY
Account Typeseparate
Account Number46680200000397
Account NameKUNAL PROPERTIES SEPARATE ACCOUNT AERO CITY PHASE II
Bank NameBANK OF BARODA
BranchMODEL TOWN BAREILLY
Branch AddressMODEL TOWN BAREILLY
Branch DistrictBareilly
Branch StateUttar Pradesh
IFSCBARB0MODBLY
Account Typetransaction
Account Number46680200000395
Account NameKUNAL PROPERTIES RERA TRANSACTION ACCOUNT AERO CITY PHASE II
Bank NameBANK OF BARODA
BranchMODELTOWN BAREILLY
Branch AddressMODELTOWN BAREILLY
Branch DistrictBareilly
Branch StateUttar Pradesh
IFSCBARB0MODBLY
Development & Facilities
Development works
Demarcation Of PlotsLAND IS WELL DEMARCATED AT SITE WITH A WIDE OPENING AT MAIN ROAD
Boundary WallA 2.5 MT HIGH PERMANENT BOUNDARY WALL IS PROPOSED TO BE CONSTRUCTED TO ENCLOSE THE SITE. A WELL DESIGNED GATE COMPLEX SHALL BE PART OF IT
Road WorkWITH 18 MT ENTRANCE ROAD, NETWORK OF 12 AND 9 MT WIDE RCC ROAD IS PROPOSED TO BE CONSTRUCTED AS PER CPWD NORMS.
Footpaths1200-1500 MM WIDE PAVED AREA SHALL RUN ON BOTH SIDE OF THE ROAD AS FOOTPATH
Water Supply Including Drinking Water FacilitiesSUBMERSIBLE WILL BE PROVIDED FOR WATER SUPPLY
Sewer SystemA WLL DESIGNED SEWERAGE SYSTEM IS PROPOSED TO BE LAID TO CARRY SEWAGE/ SOIL WATER UP TO STP OF REQUIRED CAPACITY. ALL THE STANDARD QUALITY MATERIAL SHALL BE USED TO MATCH CPWD NORMS.
DrainSTORM WATER FROM ROAD AND OTHER LANDSCAPE AREA SHALL BE CONNECTED TO THE STORM WATER DRAIN CHANNEL WHICH SHALL LEAD TO RAIN WATER HARVESTING PITS TO RECHARGE THE GROUND WATER
ParksMARKED GREEN AREAS SHALL BE DEVELOPED AS THEME PARKS WITH FACILITIES FOR ELDERLY, CHILDREN AND RESIDENTS IN GENERAL. LOW HIGHT TREES, SHRUBS AND GRASS CARPET SHALL BE COMMON TO ALL THE GREEN SPACES.
Tree PlantingALL THE ROADS SHALL BE LINED WITH 4.5 TO 6 MT. HIGH TREES (BOTTLE PALM, FICUS ETC.) AT CLOSE RECOMMENDED INTERVALS.
Design For Electric Supply Including Street LightingWE WILL DESIGN AND IMPLEMENT THE SYSTEM AS PER LOCAL ELECTRICITY BOARD AND WILL CONSIDER CENTRALIZED TRASFORMER, HT PANNEL, LT PANNEL, FEEDER PILLAR AND DG BACK FOR COMMON SERVICE LIKE EXTERNAL LIGHTING, FOUNTAIN, STP, PUMP, ROOM ETC.
Community BuildingsNOT APPLICABLE
Treatment And Disposal System Of Sewage And Sullage WaterA WELL DESIGNED SEWERAGE SYSTEM IS PROPOSED TO BE LAID TO CARRY SEWAGE / SOIL WATER UP TO STP OF REQUIRED CAPACITY. ALL THE STANDARD QUALITY MATERIAL SHALL BE USED TO MATCH CPWD NORMS
Solid Waste Management And Disposal SystemTHERE IS A PROPER GARBAGE COLLECTION AREA MARKED FOR GARBAGE DISPOSAL. COLLECTION SHALL BE LINED UP WITH THE LOCAL MUNICIPAL AUTHORITIES.
Water Conservation SystemAPART FROM RAIN WATER HARVESTING TERATED WATER SHALL BE USED FOR IRRIGATION PURPOSES RESULTING IN ZERO WASTAGE.
Energy Management System Including Use Of Renewable EnergyAPART FROM USE OF LED LIGHTS, 50 PERCENT OF THE STREET LIGHTS SHALL HAVE SOLAR BACK UP. NATURAL LIGHT SENSITIVE LED LIGHTS SHALL BE USED IN COMMON AREA TO AVOID ELECTRICITY WASTAGE
Fire Protection And Fire Safety SystemNOT APPLICABLE
Social Infrastructure And Other Public Amenities Including Public Health ServicesNOT APPLICABLE
Emergency Evacuation ServicesALL THE EXIT ROADS ARE MINIMUM 9 MT WIDE WITH 18 MT WIDE MAIN EXIT TO FACILITATE AN EASY EMERGENCY EXIT.
Other Miscellaneous WorkWE WILL PROVIDE INDIVIDUAL SUBMERSIBLE TO FULL FILL WATER REQUIRED FOR USAGE AND STANDARD
Financials
Registration Fee (₹)61500
Project Duration (months)60