AIGIN ROYAL PARK

by AIG BUILDCON PRIVATE LIMITED

Ghaziabad, Uttar Pradesh · UPRERAPRJ844481

Registered

Total units

263

Overview

Registration Date2023-07-22
RERA NumberUPRERAPRJ844481
Promoter IDUPRERAPRM238532
Proposed Start2023-06-01
Proposed Completion2029-05-14

Location

DistrictGhaziabad
TehsilGhaziabad
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Total Units263
Unit Types3
Blocks2
Floors30

Khasra records (1)

  • GH-3/4, PHASE 1, FSI TOWER A1 , B1KHASRA NO. 1565 AND OTHERSAT PARK TOWN VILLAGE -BAMHETA GZB· Plot· 8525

Inventory

Apartments (112 rows)
BlockFloorTypeCountCarpet (m²)BalconyGarage
TOWER- A1BSMNTOTHER000
TOWER- A1BSMNT2OTHER000
TOWER- A1GFOTHER000
TOWER- A114 BHK1125.794
TOWER- A114 BHK2122.314
TOWER- A124 BHK1125.794
TOWER- A124 BHK3122.314
TOWER- A134 BHK1125.794
TOWER- A134 BHK3122.314
TOWER- A144 BHK1125.794
TOWER- A144 BHK3122.314
TOWER- A154 BHK1125.794
TOWER- A164 BHK1125.794
TOWER- A164 BHK3122.314
TOWER- A174 BHK1125.794
TOWER- A174 BHK3122.314
TOWER- A154 BHK3122.314
TOWER- A184 BHK1125.794
TOWER- A194 BHK1125.794
TOWER- A1104 BHK1125.794
TOWER- A1114 BHK1125.794
TOWER- A1124 BHK1125.794
TOWER- A1134 BHK1125.794
TOWER- A1144 BHK1125.794
TOWER- A1154 BHK1125.794
TOWER- A1164 BHK1125.794
TOWER- A1174 BHK1125.794
TOWER- A1184 BHK1125.794
TOWER- A1194 BHK1125.794
TOWER- A1204 BHK1125.794
TOWER- A1214 BHK1125.794
TOWER- A1224 BHK1125.794
TOWER- A1234 BHK1125.794
TOWER- A1244 BHK1125.794
TOWER- A1254 BHK1125.794
TOWER- A1264 BHK1125.794
TOWER- A184 BHK3122.314
TOWER- A194 BHK3122.314
TOWER- A1114 BHK3122.314
TOWER- A1124 BHK3122.314
TOWER- A1134 BHK3122.314
TOWER- A1144 BHK3122.314
TOWER- A1154 BHK3122.314
TOWER- A1164 BHK3122.314
TOWER- A1174 BHK3122.314
TOWER- A1184 BHK3122.314
TOWER- A1194 BHK3122.314
TOWER- A1204 BHK3122.314
TOWER- A1214 BHK3122.314
TOWER- A1214 BHK3122.314
TOWER- A1224 BHK3122.314
TOWER- A1234 BHK3122.314
TOWER- A1244 BHK3122.314
TOWER- A1254 BHK3122.314
TOWER- A1264 BHK3122.314
TOWER- A127OTHER1251.738
TOWER- A110OTHER3122.314
TOWER B1BSMNTOTHER000
TOWER B1BSMNT2OTHER000
TOWER B1GFOTHER000
TOWER B113 BHK497.223
TOWER B123 BHK497.223
TOWER B133 BHK497.223
TOWER B143 BHK497.223
TOWER B153 BHK497.223
TOWER B163 BHK497.223
TOWER B173 BHK497.223
TOWER B183 BHK497.223
TOWER B193 BHK497.223
TOWER B1103 BHK497.223
TOWER B1113 BHK497.223
TOWER B1123 BHK497.223
TOWER B1133 BHK497.223
TOWER B1143 BHK497.223
TOWER B1153 BHK497.223
TOWER B1163 BHK497.223
TOWER B1173 BHK497.223
TOWER B1183 BHK497.223
TOWER B1193 BHK497.223
TOWER B1203 BHK497.223
TOWER B1213 BHK497.223
TOWER B1223 BHK497.223
TOWER B1233 BHK497.223
TOWER B1243 BHK497.223
TOWER B1253 BHK497.223
TOWER B1263 BHK497.223
TOWER B113 BHK294.195
TOWER B123 BHK294.195
TOWER B133 BHK294.195
TOWER B143 BHK294.195
TOWER B153 BHK294.195
TOWER B163 BHK294.195
TOWER B173 BHK294.195
TOWER B183 BHK294.195
TOWER B193 BHK294.195
TOWER B1103 BHK294.195
TOWER B1113 BHK294.195
TOWER B1123 BHK294.195
TOWER B1133 BHK294.195
TOWER B1143 BHK294.195
TOWER B1153 BHK294.195
TOWER B1163 BHK294.195
TOWER B1173 BHK294.195
TOWER B1183 BHK294.195
TOWER B1193 BHK294.195
TOWER B1203 BHK294.195
TOWER B1213 BHK294.195
TOWER B1223 BHK294.195
TOWER B1233 BHK294.195
TOWER B1243 BHK294.195
TOWER B1253 BHK294.195
TOWER B1263 BHK294.195

Permits & Approvals

Permit NoGDA/BP/22-23/1143
Permit Date2023-05-15
Valid Until2028-05-14
Extendable Until2029-05-14

Documents

Filing documents

  • Proforma of Completion Certificate(Occupancy)
  • Details of Encumbrances#New(2023-06-12)
    View
  • Commencement Certificate#New(2023-05-29)
    View
  • Other Plan(If Any)#New(2023-06-12)
    View
  • Proforma of Application Form#New(2023-05-27)
    View
  • Proforma of Allotment Letter#New(2023-05-27)
    View
  • Proforma of Conveyance Deed#New(2023-05-29)
    View
  • Waste Disposal Plan#New(2023-05-29)
    View
  • Water Supply Plan#New(2023-05-29)
    View
  • Electricity Supply Plan#New(2023-05-29)
    View
  • Development Work Plan#New(2023-05-29)
    View
  • Affidavit (Form-B)#New(2023-05-29)
    View
  • CA CERTIFICATE#New(2023-05-29)
    View
  • ARCHITECT CERTIFICATE#New(2023-05-29)
    View
  • ENGINEERS CERTIFICATE#New(2023-05-27)
    View
  • Other#New(2023-06-12)
    View

Land documents

  • Sale Deed#5271(2023-05-24)
    76655919651 sale deed AIG buildcon.pdf
    View
  • Sale Deed#1845V(2023-07-11)
    7665595314CONSORTIUM AGREEMENT.pdf
    View

Project Team

Architect AddressA-244, KAUSHAMBHI, GHAZIABAD
Engineer AddressM/s NNC design International G-70 2nd floor, Jaswant Plaza, Near Kalindi Kunj, Main Sarita Vihar Road, Shaheen Bagh, Okhla New Delhi New Delhi 110025

Developer & Contact

Developer

Promoter NameAIG BUILDCON PRIVATE LIMITED
Promoter AddressH No. WZ 102 A, First Floor, Vill Tihar Near Subhash Nagar New Delhi DL 110018 IN
Company TypeCompany
Mobile8076351454
Emailaiginroyalpark@gmail.com
Registered AddressH No. WZ 102 A, First Floor, Vill Tihar Near Subhash Nagar New Delhi DL 110018 IN
Contractor Address182, DUNDAHERA, GHAZIABAD

Bank Accounts

Account Typecollection
Account Number57500001233271
Account NameAIG BUILDCON PVT LTD MASTER COLLECTION A/C FOR AIGIN ROYAL PARK
Bank NameHDFC BANK LTD
BranchRAJ NAGAR
Branch AddressD-44, RDC, RAJ NAGAR
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCHDFC0000153
Account Typeseparate
Account Number57500001234133
Account NameAIG BUILDCON PVT LTD SEPERATE A/C FOR AIGIN ROYAL PARK
Bank NameHDFC BANK LTD
BranchRAJ NAGAR
Branch AddressD-44, RDC, RAJ NAGAR
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCHDFC0000153
Account Typetransaction
Account Number57500001234146
Account NameAIG BUILDCON PVT LTD TRANSACTION A/C FOR AIGIN ROYAL PARK
Bank NameHDFC BANK LTD
BranchRAJ NAGAR
Branch AddressD-44, RDC, RAJ NAGAR
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCHDFC0000153

Development & Facilities

Development works

Demarcation Of PlotsGroup housing project at PLOT NO-GH 3/4, PARKTOWN , NH-24, VILLAGE MEHRAULI SHAHPUR- DIST- GHAZIABAD, APPROVED BY GHAZIABAD DEVELOPMENT AUTHORITY (APPLIED AREA- 8525)
Boundary WallA 2.4 METER HIGH PRE-FABRICATED BOUNDARY WALL WILL BE CONSTRUCTED WITH DEEP FOUNDATION ALONG WITH BARBED WIRE BOUNDARY FENCING AT THE TOP AND ALSO HIGH EARTHQUAKE RESISTANT BOUNDARY WALL .
Road WorkALL ROADS IN THE PROJECT WILL BE IN COMBINATION OF CONCRETE PAVERS OF DIFFERENT SHAPE, THICKNESS, ROADS WILL BE LAID OVER 225MM WATER BOUND MACADAM.
FootpathsALL FOOTHPATH IN THE PROJECT WILL BE IN COMBINATION OF CONCRETE PAVERS OF DIFFERENTCOLOUR, SHAPE, AND THICKNESS OF 65MM AND 85MM LAID OVER 150MM WATER BOUND MACADAM SURFACE.
Water Supply Including Drinking Water FacilitiesPOTABLE WATER SUPPLY FROM MUNICIPLE WATER SUPPLY SHALL BE COLLECTED IN UNDER GROUND COLLECTION TANK AND PUMOED TO OVER HEAD WATER TANK. TH ESUPPLY OF WATER TO INDIVIDUAL FLATS SHALL BE FROM THE SAID OVERHEAD WATER TANK.
Sewer SystemTHE SEWAGE WILL BE COLLECTED THROUGH A SOIL PIPELINE ARRANGEMENT BENDS AND INSPECTION CHAMBERS LEADING TO SEWAGE WATER TREATMENT PLANT(STP) OF THE PROJECT AND TREATED WATER WILL BE USED FOR IRRIGATION AND FLUSHING PURPOSE.
DrainDRAINS HAVING A MINIMUM WIDTH OF 150MM WILL BE PROVIDED FOR COLLETION AND CHALNNELIZATION OF RAIN WATER (SURFACE RUN OFF).
ParksINTERNAL PARK WILL BE PROVIDED AND MAINTAINED . THE PARK WILL HAVE JOGGING TRACKS, CHILDREN PLAY AREA AND SITTING AREAS.THE GREEN AREA WILL BE LANDSCAPED WITH HARD AND SOFT LANDSCAPING AS PER DESIGN. THE PARKS WILL HAVE FOOTHPATHS AND PLAY AREA OF CHILDRENS.
Tree PlantingTHE TREES WILL BE PLANTED AT ALL SUITABLE LOCATIONS OF PROJECT AND ALONG THE BOUNDARY WALL.THE TREE SELECTION FLORA AND VEGETATION.
Design For Electric Supply Including Street LightingELECTRIC SUPPLY PROVIDED THROUGH 11/0.433 KV TRANSFORMERS AND BY DG SET SUPPLY FOR BACKUP. ELECTRICAL LAYOUT AND CAPACITY WILL INSTALLED TO FUFFICE THE DOMESTIC USE. ALL ELECTRICAL CABALING WILL BE UNDERGROUND AND STREET LIGHTS WILL BE AS PER WORKING DRAWING.
Community BuildingsNA
Treatment And Disposal System Of Sewage And Sullage WaterSEWAGE SHALL BE TREATED SEWAGE . TREATMENT PLANT (STP) AND THEREAFTER WATER TO BE USED FOR FLUSHINGAND IRRIGATION
Solid Waste Management And Disposal SystemSOLID WASTE TO BE COLLECTED FROM INDIVIDUAL FLATS AND STORED IN GARBAGE ROOM. RECYCLABLE SHALL BE PROCESSED IN THE COMPOSED MACHINE.
Water Conservation SystemRAIN WATER HARWESTING PITS SHALL BE PROVIDED FOR GROUND WASTE RECHARGING AND OVERFLOW TO BE DISCHARGING IN THE MUNICIPLE DRAIN.
Energy Management System Including Use Of Renewable EnergySINGLE POINT METERING WILL BE THERE FOR ENERGY PURCHASED FROM THE GRID/ POWER SUPPLY COMPANY.
Fire Protection And Fire Safety SystemSPRINKLER, FOR DOORS, YARD HYDRANTS, SMOKE DETECTER AND FIR ALARM SYSTEM WILL BE PROVIDED AS APPLICABLE.
Social Infrastructure And Other Public Amenities Including Public Health ServicesCOMMON SOCIAL INFRASTRUCTURE SHALL BE PROVIDED FOR ALL THE PHASES COMBINED.
Emergency Evacuation ServicesFOR STAIRCASES SHALL BE PROVIDED AS PER THE APPROVED FIRE DRAWING FOR EVACUATION TO OPEN AREA.
Other Miscellaneous WorkNA

Financials

Registration Fee (₹)48000
Project Duration (months)72