Registered
Total units
169
Overview
Registration Date2024-07-12
RERA NumberUPRERAPRJ538912/07/2024
Promoter IDUPRERAPRM280768
Proposed Start2022-05-20
Proposed Completion2027-05-08
Location
DistrictMoradabad
TehsilMoradabad
VillageMORADABAD
AddressPLOT NO-5CP-001C,SEC-5 NAYA MORADABAD YOJNA , MORADABAD
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units169
Unit Types2
Blocks4
Floors4
Khasra records (1)
- 5-CP/001C· Plot· 320127 m²
Inventory
Apartments (46 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| TOWER - A | BSMNT | OTHER | 0 | 1505.76 | 0 | — |
| TOWER - A | GF | SHOP | 12 | 16.55 | 0 | — |
| TOWER - A | GF | SHOP | 1 | 11.46 | 0 | — |
| TOWER - A | GF | SHOP | 1 | 17.71 | 0 | — |
| TOWER - A | 1 | SHOP | 12 | 16.55 | 0 | — |
| TOWER - A | 1 | SHOP | 1 | 11.46 | 0 | — |
| TOWER - A | 1 | SHOP | 1 | 17.71 | 0 | — |
| TOWER - A | 2 | SHOP | 12 | 16.55 | 0 | — |
| TOWER - A | 2 | SHOP | 1 | 11.46 | 0 | — |
| TOWER - A | 2 | SHOP | 1 | 17.71 | 0 | — |
| TOWER - B | GF | SHOP | 10 | 13.31 | 0 | — |
| TOWER - B | GF | SHOP | 2 | 14.51 | 0 | — |
| TOWER - B | GF | SHOP | 2 | 16.79 | 0 | — |
| TOWER - B | GF | SHOP | 1 | 25.62 | 0 | — |
| TOWER - B | GF | SHOP | 1 | 28.46 | 0 | — |
| TOWER - B | 1 | SHOP | 10 | 13.31 | 0 | — |
| TOWER - B | 1 | SHOP | 2 | 14.51 | 0 | — |
| TOWER - B | 1 | SHOP | 2 | 16.79 | 0 | — |
| TOWER - B | 1 | SHOP | 1 | 25.62 | 0 | — |
| TOWER - B | 1 | SHOP | 1 | 28.46 | 0 | — |
| TOWER - B | 2 | SHOP | 10 | 13.31 | 0 | — |
| TOWER - B | 2 | SHOP | 2 | 14.51 | 0 | — |
| TOWER - B | 2 | SHOP | 2 | 16.79 | 0 | — |
| TOWER - B | 2 | SHOP | 1 | 25.62 | 0 | — |
| TOWER - B | 2 | SHOP | 1 | 28.46 | 0 | — |
| TOWER - C | GF | SHOP | 10 | 16.98 | 0 | — |
| TOWER - C | GF | SHOP | 2 | 14.48 | 0 | — |
| TOWER - C | GF | SHOP | 1 | 17.66 | 0 | — |
| TOWER - C | 1 | SHOP | 10 | 16.98 | 0 | — |
| TOWER - C | 1 | SHOP | 2 | 17.66 | 0 | — |
| TOWER - C | 1 | SHOP | 2 | 14.48 | 0 | — |
| TOWER - C | 2 | SHOP | 10 | 16.98 | 0 | — |
| TOWER - C | 2 | SHOP | 2 | 17.66 | 0 | — |
| TOWER - C | 2 | SHOP | 2 | 14.48 | 0 | — |
| TOWER - D | GF | SHOP | 8 | 18.17 | 0 | — |
| TOWER - D | GF | SHOP | 2 | 18.88 | 0 | — |
| TOWER - D | GF | SHOP | 1 | 18.91 | 0 | — |
| TOWER - D | GF | SHOP | 1 | 25.43 | 0 | — |
| TOWER - D | 1 | SHOP | 8 | 18.17 | 0 | — |
| TOWER - D | 1 | SHOP | 2 | 18.88 | 0 | — |
| TOWER - D | 1 | SHOP | 2 | 18.91 | 0 | — |
| TOWER - D | 1 | SHOP | 1 | 25.43 | 0 | — |
| TOWER - D | 2 | SHOP | 8 | 18.17 | 0 | — |
| TOWER - D | 2 | SHOP | 2 | 18.88 | 0 | — |
| TOWER - D | 2 | SHOP | 2 | 18.91 | 0 | — |
| TOWER - D | 2 | SHOP | 1 | 25.43 | 0 | — |
Permits & Approvals
Permit NoSHOPPING CENTER/01195/MBDA/BP/21-22/0548/13042022
Permit Date2022-05-10
Valid Until2027-05-09
Extendable Until2028-05-09
Documents
Filing documents
- Proforma of Conveyance Deed
- Proforma of Completion Certificate(Occupancy)
- Other
- Details of Encumbrances#New(2024-03-23)View
- Commencement Certificate#New(2024-03-23)View
- Proforma of Application Form#New(2024-04-03)View
- Proforma of Allotment Letter#New(2024-04-03)View
- Proforma of Conveyance Deed#New(2024-04-03)View
- Waste Disposal Plan#New(2024-04-03)View
- Water Supply Plan#New(2024-04-30)View
- Electricity Supply Plan#New(2024-03-23)View
- Development Work Plan#New(2024-04-03)View
- Affidavit (Form-B)#New(2024-04-03)View
- CA CERTIFICATE#New(2024-04-04)View
- ARCHITECT CERTIFICATE#New(2024-04-04)View
- ENGINEERS CERTIFICATE#New(2024-04-04)View
- Proforma of Agreement for Sale#New(2024-04-03)View
Land documents
- Registry Document#3663(2020-07-15)View9996411313.pdf
Project Team
Architect Address21 Shivpuri, Rampur Road, Moradabad -244001
Engineer Address389, Ground floor, IP Colony, Sector-30/33, Faridabad-121003 Haryana
Developer & Contact
Developer
Promoter NameNARENDER SINGH CHADHA
Company TypeIndividual
Mobile8077544332
Emailnarendersinghchadha33@gmail.com
Registered AddressS-559 GREATER KAILASH PART-2 SOUTH DELHI-110048
Contractor AddressS-559, GREATER KAILASH PART 2, SOUTH DELHI, DELHI-110048
Bank Accounts
Account Typecollection
Account Number84322149366161
Account NameNarender Singh Chadha Collection Account For Akash Shopping Complex
Bank NamePrathama U.P. Gramin Bank
BranchRam Ganga Vihar Phase ll
Branch AddressNear Sale Tax Office Ram Ganga Vihar Phase 2 Moradabad 244001
Branch DistrictMoradabad
Branch StateSelect
IFSCPUNB0SUPGB5
Branch Emailbo.8432@prathamaupbank.com
Account Typeseparate
Account Number84322149366188
Account NameNarender Singh Chadha Separate Bank Account For Akash Shopping Complex
Bank NamePrathama U.P. Gramin Bank
BranchRam Ganga Vihar Phase ll
Branch AddressNear Sale Tax Office Ram Ganga Vihar Phase ll Moradabad 244001
Branch DistrictMoradabad
Branch StateUttar Pradesh
IFSCPUNB0SUPGB5
Account Typetransaction
Account Number84322149366153
Account NameNarender Singh Chadha Rera Transaction Account For Akash Shopping Complex
Bank NamePrathama U.P. Gramin Bank
BranchRam Ganga Vihar Phase ll
Branch AddressNear Sale Tax Office Ram Ganga Vihar Phase ll Moradabad 244001
Branch DistrictMoradabad
Branch StateUttar Pradesh
IFSCPUNB0SUPGB5
Development & Facilities
Development works
Demarcation Of PlotsNA
Boundary WallThe boundary wall is 3m high that is built is 230mm thick brick wall in first class brick work in a ratio of 1;6 mix, with providing column at every 4mt, expansion joint and beam for high durability damp proof course layer will also laid for moisture resistant purpose .
Road WorkInternal road are 6 Mt. wide. All roads are RCC with proper compaction, 8 inch boulder will be use, ready mixed concrete will be use which is manufactured in fully automatic batching plant and designed up to 100 Mt. load capacity.
FootpathsNA
Water Supply Including Drinking Water FacilitiesWater supply will be provided by developer through over head water tank in each. All water supply pipes elbows, tee , socket etc. will be Uniq make ISI marked.
Sewer SystemSTP(sewerage treatment plant) is proposed by developer (95 KLD) of MBBR technology with clog pump, irrigation pump etc.
DrainProviding and laying cast in site RCC Drain. Strom water lines will be provided by the developer along with roads. All drain pipes And rain water pipes to be make 6kg pressure pipes ISI marked and all PVC fitting to be of ISI marked. Gully traps and main hole as per detail drawing.
ParksNA
Tree PlantingTree plantation will be done along the boundaries. It is one of the effective remedial measures to control the air pollution and noise pollution. It also causes aesthetics improvement of the area as well as sustains and supports the biosphere.
Design For Electric Supply Including Street LightingStreet lightning lines will be laid along the road. The distance between street lightning will be 15 to 20 Mt. electrical sub station are proposed by developer. Wires , switch socket crabtree or anchor roma make , MCB ISI make, conduit ISI marked, D.B Box ISI marked, gang box, fan box, light box, etc. as per ISI norms.
Community BuildingsNA
Treatment And Disposal System Of Sewage And Sullage WaterSTP system has been proposed by the developer for treatment and disposal of sewage and sullage water. sewer lines are around 150-300mm.
Solid Waste Management And Disposal SystemSolid waste management and disposal system will be provided by developer. All drain pipes and rain water pipes to be make 6kg pressure pipe ISI marked and all PVC fitting to be of ISI marked. Gully traps and main hole as per detail drawing.
Water Conservation SystemRain water harvesting tank will be constructed by the developer for conservation of water.
Energy Management System Including Use Of Renewable EnergyNA
Fire Protection And Fire Safety SystemFire fighting instruments will be placed by the developer in each block according to fire NOC. like alarms, hooters, hose reels , hydrant pump, sprinklers pump etc.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesFire Staircases will be provided in block for emergency exit.
Other Miscellaneous WorkNA
Financials
Registration Fee (₹)41000
Project Duration (months)60