Registered
Total units
101
Overview
Registration Date2024-08-01
RERA NumberUPRERAPRJ415630/08/2024
Promoter IDUPRERAPRM298010
Proposed Start2021-10-05
Proposed Completion2026-10-04
Location
DistrictMoradabad
TehsilMoradabad
VillageMoja Manpur Narayanpur Almaroof Arya Nagar Station road Budh Bazar
AddressGata No: 48, Moja Manpur Narayanpur Almaroof Arya Nagar Station road Budh Bazar Moradabad 244001
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units101
Unit Types2
Blocks1
Floors7
Khasra records (1)
- 48· Plot· 270164 m²
Inventory
Apartments (7 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| Akhilesh Plaza | BSMNT | OTHER | 0 | 1036.11 | 0 | — |
| Akhilesh Plaza | BSMNT2 | OTHER | 0 | 1036.1 | 0 | — |
| Akhilesh Plaza | GF | SHOP | 23 | 16.68 | 0 | — |
| Akhilesh Plaza | 1 | SHOP | 26 | 16.68 | 0 | — |
| Akhilesh Plaza | 2 | SHOP | 28 | 16.68 | 0 | — |
| Akhilesh Plaza | 3 | SHOP | 22 | 16.68 | 0 | — |
| Akhilesh Plaza | 4 | SHOP | 2 | 226.36 | 0 | — |
Permits & Approvals
Permit NoMBDA/BP/20-21/0125
Permit Date2021-10-05
Valid Until2026-10-04
Extendable Until2026-10-04
Documents
Filing documents
- Proforma of Completion Certificate(Occupancy)
- Details of Encumbrances#New(2024-06-26)View
- Commencement Certificate#New(2024-05-29)View
- Other Plan(If Any)#New(2024-05-29)View
- Proforma of Application Form#New(2024-05-29)View
- Proforma of Allotment Letter#New(2024-05-29)View
- Proforma of Conveyance Deed#New(2024-05-29)View
- Waste Disposal Plan#New(2024-05-29)View
- Water Supply Plan#New(2024-05-29)View
- Electricity Supply Plan#New(2024-05-29)View
- Development Work Plan#New(2024-05-29)View
- Affidavit (Form-B)#New(2024-05-29)View
- CA CERTIFICATE#New(2024-05-29)View
- ARCHITECT CERTIFICATE#New(2024-05-29)View
- ENGINEERS CERTIFICATE#New(2024-05-29)View
- Other#New(2024-05-29)View
- Proforma of Agreement for Sale#New(2024-05-29)View
Land documents
- Registry Document#4878(2001-07-17)View10922331541.pdf
- Registry Document#4879(2001-07-17)View10922333571.pdf
- Registry Document#4274(2005-05-06)View10922332673.pdf
- Registry Document#3557(2005-04-13)View10922331006.pdf
- Allotment Letter issued by Competent Authority#293(2020-08-04)View10922332864.pdf
- Registry Document#25725(2022-07-14)View10922334901.pdf
Project Team
Architect Address6, Avas Vikas Market, Pili Kothi, Moradabad 244001
Engineer Address18, Mansarovar Colony, Moradabad 244103
Developer & Contact
Developer
Promoter NameInderjeet Singh Chadha
Company TypeIndividual
Mobile9953950007
Emailinderjeetsinghchadha7@gmail.com
Registered AddressS/O Harbhajan Singh Chadha, 186, Mahrauli Chattarpur, Jonapur, South Delhi 110047
Contractor Address6, Avas Vikas Market, Pili Kothi, Moradabad 244001
Bank Accounts
Account Typecollection
Account Number42725794587
Account NameInderjeet Singh Chadha Collection A/C for Akhilesh Plaza
Bank NameState Bank of India
BranchCivil Lines
Branch AddressSBI, Civil Lines, DT, Moradabad 244001
Branch DistrictMoradabad
Branch StateSelect
IFSCSBIN0004113
Branch Emailsbi.04113@sbi.co.in
Account Typeseparate
Account Number42725789544
Account NameInderjeet Singh Chadha Separate A/C for Akhilesh Plaza
Bank NameState Bank of India
BranchCivil Lines
Branch AddressSBI, Civil Lines, DT, Moradabad 244001
Branch DistrictMoradabad
Branch StateUttar Pradesh
IFSCSBIN0004113
Account Typetransaction
Account Number42725863280
Account NameInderjeet Singh Chadha Transaction A/C for Akhilesh Plaza
Bank NameState Bank of India
BranchCivil Lines
Branch AddressSBI, Civil lines, DT, Moradabad 244001
Branch DistrictMoradabad
Branch StateUttar Pradesh
IFSCSBIN0004113
Development & Facilities
Development works
Demarcation Of PlotsAs per approved layout plan we have total 2701.64 sq. meter plot area, in which there will be one main entrance gate with one exit gate. Site is connected with 24 meter wide main road in front connected with station road
Boundary Wall1.8 - 2.1 m high and 200 mm thick boundary wall designed in this project with MS railing as per approved plan. Brick work of 9 inches and RCC work in column and beam will be used and gates will be made of MS steel.
Road WorkTrimix / Asphalt model road will be used in this project which is design by architect.
FootpathsAll internal roads will have narrow footpaths with tiles pavers or equivalent finish.
Water Supply Including Drinking Water FacilitiesAll floors are connected and equipped with domestic water for sanitary activities and STP treated water for flushing system. The STP treated water will also be made available for other purposes
Sewer SystemThis building will equipped with centralized sewerage system for ensuring all sewerage water is directed to the sewerage treatment plan for thourough treatment.
DrainA storm water system will be used to manage storm water from road and other landscape areas. The storm water will be directed to the storm water channel while roof top storm water will be channel to a rain water harvesting PIT.
ParksIN this project there will be no park available
Tree Plantingas per approved layout plan in this project 38 trees are proposed to plant
Design For Electric Supply Including Street LightingWe have designed the system as per local electircity board and consider one centralized transformer panel, LT panel, Feeder Pillar, and DG back for common service like external lights, pump room etc.
Community BuildingsIn this project there will no community building
Treatment And Disposal System Of Sewage And Sullage WaterThere will be centralized sewerage system and all floors are connected to STP. All sewerage water will go to STP for treatment after treatment water will be recycled and used for other purposes
Solid Waste Management And Disposal SystemThis project will have one waste segregation area and solid waste will be encouraged to segregation with all floors, dustbin will also be provided for collection of waste and there will a proper collection agency who collect all waste.
Water Conservation SystemA well designed rain water harvesting system will be there in this project to recharge PIT.
Energy Management System Including Use Of Renewable EnergyThe main aim in this project is envisioned as green sustainable building and resource efficiency throughout the building and to conserve natural resources and implemented to optimize energy efficient system and machinery
Fire Protection And Fire Safety SystemAll fire norms will be followed as per approval from fire department fire sprinklers smoke detectors with pump are being used in this project
Social Infrastructure And Other Public Amenities Including Public Health ServicesThere will be no social infrastructure in this project
Emergency Evacuation ServicesFire staircase will be provided in this project on each floors there will be fire resistance doors and basement will have one access and exit in case of emergency and dedicated assemble area also be there
Other Miscellaneous WorkNA
Financials
Registration Fee (₹)38000
Project Duration (months)60