Registered
Total units
944
Overview
Registration Date2018-08-27
RERA NumberUPRERAPRJ17447
Promoter IDUPRERAPRM55910
Proposed Start2018-09-15
Proposed Completion2023-07-25
Location
DistrictAgra
TehsilAgra
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units944
Unit Types2
Blocks19
Floors4
Khasra records (1)
- KHASRA NO. 30· Khasra· 1761020 m²
Inventory
Apartments (75 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| A | GF | 1 BHK | 13 | 22.77 | 1 | 0 |
| A | 1 | 1 BHK | 13 | 22.77 | 1 | 0 |
| A | 2 | 1 BHK | 13 | 22.77 | 1 | 0 |
| A | 3 | 1 BHK | 13 | 22.77 | 1 | 0 |
| E | GF | 1 BHK | 13 | 22.77 | 1 | 0 |
| E | 1 | 1 BHK | 13 | 22.77 | 1 | 0 |
| E | 2 | 1 BHK | 13 | 22.77 | 1 | 0 |
| E | 3 | 1 BHK | 13 | 22.77 | 1 | 0 |
| F | GF | 1 BHK | 13 | 22.77 | 1 | 0 |
| F | 1 | 1 BHK | 13 | 22.77 | 1 | 0 |
| F | 2 | 1 BHK | 13 | 22.77 | 1 | 0 |
| F | 3 | 1 BHK | 13 | 22.77 | 1 | 0 |
| G | GF | 1 BHK | 13 | 22.77 | 1 | 0 |
| G | 1 | 1 BHK | 13 | 22.77 | 1 | 0 |
| G | 2 | 1 BHK | 13 | 22.77 | 1 | 0 |
| G | 3 | 1 BHK | 13 | 22.77 | 1 | 0 |
| H | GF | 1 BHK | 13 | 22.77 | 1 | 0 |
| H | 1 | 1 BHK | 13 | 22.77 | 1 | 0 |
| H | 2 | 1 BHK | 13 | 22.77 | 1 | 0 |
| H | 3 | 1 BHK | 13 | 22.77 | 1 | 0 |
| I | GF | 1 BHK | 13 | 22.77 | 1 | 0 |
| I | 1 | 1 BHK | 13 | 22.77 | 1 | 0 |
| I | 2 | 1 BHK | 13 | 22.77 | 1 | 0 |
| I | 3 | 1 BHK | 13 | 22.77 | 1 | 0 |
| K | GF | 1 BHK | 13 | 22.77 | 1 | 0 |
| K | 1 | 1 BHK | 13 | 22.77 | 1 | 0 |
| K | 2 | 1 BHK | 13 | 22.77 | 1 | 0 |
| K | 3 | 1 BHK | 13 | 22.77 | 1 | 0 |
| L | GF | 1 BHK | 13 | 22.77 | 1 | 0 |
| L | 1 | 1 BHK | 13 | 22.77 | 1 | 0 |
| L | 2 | 1 BHK | 13 | 22.77 | 1 | 0 |
| L | 3 | 1 BHK | 13 | 22.77 | 1 | 0 |
| M | GF | 1 BHK | 13 | 22.77 | 1 | 0 |
| M | 1 | 1 BHK | 13 | 22.77 | 1 | 0 |
| M | 2 | 1 BHK | 13 | 22.77 | 1 | 0 |
| M | 3 | 1 BHK | 13 | 22.77 | 1 | 0 |
| N | GF | 1 BHK | 13 | 22.77 | 1 | 0 |
| N | 1 | 1 BHK | 13 | 22.77 | 1 | 0 |
| N | 2 | 1 BHK | 13 | 22.77 | 1 | 0 |
| N | 3 | 1 BHK | 13 | 22.77 | 1 | 0 |
| O | GF | 1 BHK | 13 | 22.77 | 1 | 0 |
| O | 1 | 1 BHK | 13 | 22.77 | 1 | 0 |
| O | 2 | 1 BHK | 13 | 22.77 | 1 | 0 |
| O | 3 | 1 BHK | 13 | 22.77 | 1 | 0 |
| P | GF | 1 BHK | 13 | 22.77 | 1 | 0 |
| P | 1 | 1 BHK | 13 | 22.77 | 1 | 0 |
| P | 2 | 1 BHK | 13 | 22.77 | 1 | 0 |
| P | 3 | 1 BHK | 13 | 22.77 | 1 | 0 |
| Q | GF | 1 BHK | 13 | 22.77 | 1 | 0 |
| Q | 1 | 1 BHK | 13 | 22.77 | 1 | 0 |
| Q | 2 | 1 BHK | 13 | 22.77 | 1 | 0 |
| Q | 3 | 1 BHK | 13 | 22.77 | 1 | 0 |
| R | GF | 1 BHK | 13 | 22.77 | 1 | 0 |
| R | 1 | 1 BHK | 13 | 22.77 | 1 | 0 |
| R | 2 | 1 BHK | 13 | 22.77 | 1 | 0 |
| R | 3 | 1 BHK | 13 | 22.77 | 1 | 0 |
| J | GF | 1 BHK | 9 | 22.77 | 1 | 0 |
| J | GF | SHOP | 4 | 12.48 | 0 | 0 |
| J | GF | SHOP | 4 | 13.37 | 0 | 0 |
| J | 1 | 1 BHK | 13 | 22.77 | 1 | 0 |
| J | 2 | 1 BHK | 13 | 22.77 | 1 | 0 |
| J | 3 | 1 BHK | 13 | 22.77 | 1 | 0 |
| B | GF | 1 BHK | 13 | 22.77 | 1 | 0 |
| B | 1 | 1 BHK | 13 | 22.77 | 1 | 0 |
| B | 2 | 1 BHK | 13 | 22.77 | 1 | 0 |
| B | 3 | 1 BHK | 13 | 22.77 | 1 | 0 |
| C | GF | 1 BHK | 13 | 22.77 | 1 | 0 |
| C | 1 | 1 BHK | 13 | 22.77 | 1 | 0 |
| C | 2 | 1 BHK | 13 | 22.77 | 1 | 0 |
| C | 3 | 1 BHK | 13 | 22.77 | 1 | 0 |
| D | GF | 1 BHK | 13 | 22.77 | 1 | 0 |
| D | 1 | 1 BHK | 13 | 22.77 | 1 | 0 |
| D | 2 | 1 BHK | 13 | 22.77 | 1 | 0 |
| D | 3 | 1 BHK | 13 | 22.77 | 1 | 0 |
| SHOP | GF | SHOP | 4 | 10.4 | 0 | 0 |
Permits & Approvals
Permit No01/PMAY/2018-2019
Permit Date2018-07-26
Valid Until2023-07-25
Extendable Until2026-07-25
Documents
Filing documents
- Details of Encumbrances
- Proforma of Allotment Letter
- Proforma of Conveyance Deed
- Proforma of Completion Certificate(Occupancy)
- CA CERTIFICATE
- ARCHITECT CERTIFICATE
- ENGINEERS CERTIFICATE
- Commencement Certificate#New(2019-05-07)View
- Other Plan(If Any)#New(2019-05-07)View
- Proforma of Application Form#New(2018-08-23)View
- Waste Disposal Plan#New(2019-05-07)View
- Water Supply Plan#New(2019-05-07)View
- Electricity Supply Plan#New(2019-05-07)View
- Development Work Plan#New(2018-08-23)View
- Affidavit (Form-B)#New(2018-08-23)View
Land documents
- Sale Deed#BAHI NO - 01 JILD NO - 7605 PAGE NO 17-116 SERIAL NO - 2826(2011-03-17)View17447308207 Sale Deed...pdf
Project Team
Architect AddressB-116, 2ND FLOOR, SECTOR 50, NOIDA-201301
Engineer AddressC-56 A/10 & 11, SECTOR 62, NOIDA
Developer & Contact
Developer
Promoter NameATUL INFRAESTATE LLP.
Promoter AddressNehru Nagar, Agra
Company TypeCompany
Mobile9927072000
Emailattulinfraestatellp@gmail.com
Registered AddressNehru Nagar, Agra
Contractor AddressTILL NOW NOT FINALIZED
Development & Facilities
Development works
Demarcation Of PlotsRectangular Plot having 18479.65 sqm area, Accessible from 24 m wide road. Plot is 88.71m wide at the Front side, from the right = 190.37m, from the left =206.99 & the rear side is 88.98m wide.
Boundary WallUsing 230 mm thick brick wall having ms grills on the top.
Road WorkThere are 6 m and 4.5 m wide internal road are provided. In which 6 m is for fire tender movement.
Footpaths"750 mm wide footpath is provided. street lights, plantation and other services are also provided in footpath."
Water Supply Including Drinking Water FacilitiesWe have provided overhead tanks.
Sewer SystemCentralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening and flushing system and oveflow from the STP shall be connect with the Municiple sewarage system.
DrainStorm water drain shall be Provided. Storm water from Roof,Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit to recharge the Ground water and overflow shall be connect with Municple drain line.
ParksGreen area/parks are located at the center of plot in two parts and third one is along the boundary wall.
Tree PlantingIndegenious trees are proposed for planting.
Design For Electric Supply Including Street LightingWe have design the system as per local electricity Board.
Community BuildingsN/A
Treatment And Disposal System Of Sewage And Sullage WaterCentralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening and flushing system and oveflow from the STP shall be connect with the Municiple sewarage system.
Solid Waste Management And Disposal SystemFor solid waste proper garbage collection area provided at site.
Water Conservation SystemWe will use low flow fixtures and rain water harvesting system to reduce the water consumption and improve the ground water level.
Energy Management System Including Use Of Renewable EnergyWe will use energy efficient lights fitting in all area. In STP and Pump room all the equipment shall have energy efficient motor.
Fire Protection And Fire Safety SystemN/A
Social Infrastructure And Other Public Amenities Including Public Health Services"Sewerage ,Storm water and water supply system shall be Provided. Transfer pumps to fill the domestic overhead tank. Water for domestic use & Flushing go down through gravity from domestic as well as flushing tanks. All Sewgage shall be go to the STP for recycling the water. Storm water for Roof,Roads and other area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municple drain."
Emergency Evacuation Services3 no of exits are provided in each block, and staircase is open from the front.
Other Miscellaneous WorkN/A
Financials
Registration Fee (₹)93500
Project Duration (months)100