Registered
Total units
156
Overview
Registration Date2022-10-22
RERA NumberUPRERAPRJ772700
Promoter IDUPRERAPRM184040
Proposed Start2022-09-01
Proposed Completion2027-06-19
Location
DistrictLucknow
TehsilLucknow
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units156
Unit Types1
Blocks1
Floors5
Khasra records (1)
- PLOT NO.-2D/COM-02, VRINDAVAN YOJNA NO-2 PART-1, LUCKNOW· Plot· 337161 m²
Inventory
Apartments (5 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| ARCADIUM CENTRAL | BSMNT3 | SHOP | 37 | 1160.83 | 0 | — |
| ARCADIUM CENTRAL | GF | SHOP | 37 | 1160.13 | 0 | — |
| ARCADIUM CENTRAL | 1 | SHOP | 37 | 1160.82 | 0 | — |
| ARCADIUM CENTRAL | 2 | SHOP | 31 | 1160.43 | 0 | — |
| ARCADIUM CENTRAL | 3 | SHOP | 14 | 514.39 | 0 | — |
Permits & Approvals
Permit NoHigh Risk/UPAVP/BP/21-22/1360/30042022
Permit Date2022-06-20
Valid Until2027-06-19
Extendable Until2030-06-19
Documents
Filing documents
- Details of Encumbrances
- Proforma of Completion Certificate(Occupancy)
- CA CERTIFICATE
- Other
- Details of Encumbrances#New(2022-10-18)View
- Commencement Certificate#New(2022-09-25)View
- Other Plan(If Any)#New(2022-09-25)View
- Proforma of Application Form#New(2022-09-25)View
- Proforma of Allotment Letter#New(2022-09-25)View
- Proforma of Conveyance Deed#New(2022-09-25)View
- Waste Disposal Plan#New(2022-09-25)View
- Water Supply Plan#New(2022-09-25)View
- Electricity Supply Plan#New(2022-09-25)View
- Development Work Plan#New(2022-09-25)View
- Affidavit (Form-B)#New(2022-09-26)View
- CA CERTIFICATE#New(2022-10-18)View
- ARCHITECT CERTIFICATE#New(2022-09-25)View
- ENGINEERS CERTIFICATE#New(2022-09-25)View
- Other#New(2022-10-19)View
Land documents
- Sale Deed#34059(2021-10-29)View5770801723Sale deed.pdf
Project Team
Architect AddressD-2/122, Ground floor, Sambhav Tower, Vibhuti Khand, Gomti Nagar, Lucknow
Engineer AddressS.F-202, Amber Vihar Colony, Pakkapul, Bandha Road, Lucknow- 22
Developer & Contact
Developer
Promoter NameRashi Infratech
Promoter Address128/28 E BLOCK, KIDWAI NAGAR, KANPUR NAGAR, Kanpur Nagar, Uttar Pradesh, 208011
Company TypePartnership Firm
Mobile7905158565
EmailSaurabhsachan@icloud.com
Registered Address128/28 E BLOCK, KIDWAI NAGAR, KANPUR NAGAR, Kanpur Nagar, Uttar Pradesh, 208011
Contractor Address113/18, Swaroop Nagar, Kanpur, UP, 208002
Bank Accounts
Account Typecollection
Account Number730905000308
Account NameRashi Infratech RERA Collection Account for Arcadium Central
Bank NameICICI Bank
BranchSanjar Gold, Sector-2 D, Vrindavan Yojna, Lucknow
Branch AddressSanjar Gold, Sector-2 D, Vrinadavan Yojna, Lucknow
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCICIC0007309
Account Typeseparate
Account Number730905000309
Account NameRashi Infratech RERA Separate Bank Account for Arcadium central
Bank NameICICI Bank
BranchSanjar Gold Complex, Sector 2-D,Vrindavan Yojna, Lucknow
Branch AddressSanjar Gold Comples, Sector 2-D, Vrindavan Yojna,Lucknow
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCICIC0007309
Account Typetransaction
Account Number730905000307
Account NameRashi Infratech RERA Transaction Account for Arcadium Central
Bank NameICICI Bank
BranchSanjar Gold Complex, Sector 2-D, Vrindavan Yojna,Lucknow
Branch AddressSanjar Gold Complex,Sector 2-D,Vrindavan Yojna,Lucknow
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCICIC0007309
Development & Facilities
Development works
Demarcation Of PlotsDEMARKETED AT SITE WITH APROACH ROAD
Boundary WallNOT TO BE CONSTRUCTED ONLY RAILING WILL BE INSTALLED AFTER COMPLETION OF MAIN BUILDING WORK. THERE IS NO REQUIREMENT OF BOUNDARY WALL.
Road WorkWELL DEVELOPED APROACH ROADS ARE AVAILABLE ON TWO SIDES. MAINTAINANCE WORK TO BE DONE AS PER REQUIREMENT AT THE END OF PROJECT CONSTRUCTION.
FootpathsINTERLOCKING /PAVEMENT OF STONE WILL BE CONSTRUCTED IN INNER ROAD. REQUIREMENTS IN INNER SIDE .INTERLOCKING WORK WILL BE DONE ON FOOTPATHS
Water Supply Including Drinking Water FacilitiesMUNICIPAL WATER SUPPLY LINE AVAILABLE AND CONNECTED WITH OHT. SECONDARY SUBMERSIBLE WILL ALSO BE PROVIDED . CPVC PIPE WILL CONNECT TO TOILETS AND OTHER PLACES WITH TERRACE TANK. RO PURIFIER WILL PROVIDED TO DRINK AS REQUIRED PLACES.
Sewer SystemPROPER SEWERAGE SYSTEM IS AVAILABLE . SEWERAGE PIPE WILL BE CONNECTED TO SEWER LINE THROUGH MAIN HOLE AND CHAMBER. PVC PIPES WILL BE USED FOR SEWER AND RAINWATER . OPEN DRAIN IS AVAILABLE . OPEN DRAIN WILL BE CONSTRUCTED IF REQUIRED.
DrainPROPER SEWERAGE SYSTEM IS AVAILABLE . SEWERAGE PIPE WILL BE CONNECTED TO SEWER LINE THROUGH MAIN HOLE AND CHAMBER. PVC PIPES WILL BE USED FOR SEWER AND RAINWATER . OPEN DRAIN IS AVAILABLE . OPEN DRAIN WILL BE CONSTRUCTED IF REQUIRED.
ParksNOT APPLICABLE
Tree PlantingTREE WILL BE PLANTED WITH ONE SIDE OF ROAD AND PLANTATION WILL BE DONE AS PER SITE REQUIREMENTS
Design For Electric Supply Including Street LightingREQUIRED LOAD TO BE MADE AVAILABLE THROUGH EXISTING SUPPLY LINE WITH HT CABLE. STREET LIGHT WILL BE PROVIDED AS REQUIREMENT AND AND COPPER WIRE WILL BE USED IN INNER SUPPLY .
Community BuildingsNOT APPLICABLE
Treatment And Disposal System Of Sewage And Sullage WaterNOT APPLICABLE
Solid Waste Management And Disposal SystemAVAILABLE AND FUNCTIONABLE. FASCILIATED BY MUNICIPAL CORPORATION
Water Conservation SystemRAINWATER HARVESTING OF REQUIRED CAPACITY WILL BE CONSTRUCTED BY BORE. IT WILL BE CONSTRUCTED AS PER DRAWING.
Energy Management System Including Use Of Renewable EnergyEXTERNAL LIGHTS WILL BE ON SOLAR BACKUP AND DG SET.
Fire Protection And Fire Safety SystemALL THE NORMS OF FIRE SAFETY WILL BE APPLICABLE AND WILL PROVIDED IN THE BUILDING BEFORE COMPLETION OF PROJECT.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNOT APPLICABLE
Emergency Evacuation ServicesEVACUATION SERVICES WILL BE PROVIDED AS PER REQUIREMENTS
Other Miscellaneous WorkNOT APPLICABLE
Financials
Registration Fee (₹)44000
Project Duration (months)58