Atal Nagar Awasiya Yojna

by Lucknow Development Authority

Lucknow, Uttar Pradesh · UPRERAPRJ808747/08/2025

Registered

Total units

2496

Overview

Registration Date2025-08-26
RERA NumberUPRERAPRJ808747/08/2025
Promoter IDUPRERAPRM10102
Proposed Start2025-08-01
Proposed Completion2030-06-04

Location

DistrictLucknow
TehsilLucknow
VillagePara
AddressKhasra No. 2746
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Total Units2496
Unit Types3
Blocks15
Floors21

Khasra records (1)

  • 2746· Khasra· 43342

Inventory

Apartments (220 rows)
BlockFloorTypeCountCarpet (m²)BalconyGarage
SURAJMUKHIGF1 BHK820.261
SURAJMUKHI11 BHK820.261
SURAJMUKHI21 BHK820.261
SURAJMUKHI31 BHK820.261
SURAJMUKHI41 BHK820.261
SURAJMUKHI51 BHK820.261
SURAJMUKHI61 BHK820.261
SURAJMUKHI71 BHK820.261
SURAJMUKHI81 BHK820.261
SURAJMUKHI91 BHK820.261
SURAJMUKHI101 BHK820.261
SURAJMUKHI111 BHK820.261
SURAJMUKHI121 BHK820.261
KESARGF1 BHK820.261
KESAR11 BHK820.261
KESAR21 BHK820.261
KESAR31 BHK820.261
KESAR41 BHK820.261
KESAR51 BHK820.261
KESAR61 BHK820.261
KESAR71 BHK820.261
KESAR81 BHK820.261
KESAR91 BHK820.261
KESAR101 BHK820.061
KESAR111 BHK820.261
KESAR121 BHK820.261
MAULSHRIGF1 BHK820.261
MAULSHRI11 BHK820.261
MAULSHRI21 BHK820.261
MAULSHRI31 BHK820.261
MAULSHRI41 BHK820.261
MAULSHRI51 BHK820.261
MAULSHRI61 BHK820.261
MAULSHRI71 BHK820.261
MAULSHRI81 BHK820.261
MAULSHRI91 BHK820.261
MAULSHRI101 BHK820.261
MAULSHRI111 BHK820.261
MAULSHRI121 BHK820.261
KAMINIGF1 BHK1620.261
KAMINI11 BHK1620.261
KAMINI21 BHK1620.261
KAMINI31 BHK1620.261
KAMINI41 BHK1620.261
KAMINI51 BHK1620.261
KAMINI61 BHK1620.261
KAMINI71 BHK1620.261
KAMINI81 BHK1620.261
KAMINI91 BHK1620.261
KAMINI101 BHK1620.261
KAMINI111 BHK1620.261
KAMINI121 BHK1620.261
MOGRAGF1 BHK1620.261
MOGRA11 BHK1620.261
MOGRA21 BHK1620.261
MOGRA31 BHK1620.261
MOGRA41 BHK1620.261
MOGRA51 BHK1620.261
MOGRA61 BHK1620.261
MOGRA71 BHK1620.261
MOGRA81 BHK1620.261
MOGRA91 BHK1620.261
MOGRA101 BHK1620.261
MOGRA111 BHK1620.261
MOGRA121 BHK1620.261
NEELKAMAL11 BHK1621.211
NEELKAMAL21 BHK1621.211
NEELKAMAL31 BHK1621.211
NEELKAMAL41 BHK1621.211
NEELKAMAL51 BHK1621.211
NEELKAMAL61 BHK1621.211
NEELKAMAL71 BHK1621.211
NEELKAMAL81 BHK1621.211
NEELKAMAL91 BHK1621.211
NEELKAMAL101 BHK1621.211
NEELKAMAL111 BHK1621.211
NEELKAMAL121 BHK1621.211
NEELKAMALGFOTHER000
KETKIGFOTHER000
KETKI11 BHK1621.211
KETKI21 BHK1621.211
KETKI31 BHK1621.211
KETKI41 BHK1621.211
KETKI51 BHK1621.211
KETKI61 BHK1621.211
KETKI71 BHK1621.211
KETKI81 BHK1621.211
KETKI91 BHK1621.211
KETKI101 BHK1621.211
KETKI111 BHK1621.211
KETKI121 BHK1621.211
BRAHMAKAMALGFOTHER000
BRAHMAKAMAL11 BHK1621.211
BRAHMAKAMAL21 BHK1621.211
BRAHMAKAMAL31 BHK1621.211
BRAHMAKAMAL41 BHK1621.211
BRAHMAKAMAL51 BHK1621.211
BRAHMAKAMAL61 BHK1621.211
BRAHMAKAMAL71 BHK1621.211
BRAHMAKAMAL81 BHK1621.211
BRAHMAKAMAL91 BHK1621.211
BRAHMAKAMAL101 BHK1621.211
BRAHMAKAMAL111 BHK1621.211
BRAHMAKAMAL121 BHK1621.211
MALTIGFOTHER000
MALTI11 BHK1621.211
MALTI21 BHK1621.211
MALTI31 BHK1621.211
MALTI41 BHK1621.211
MALTI51 BHK1621.211
MALTI61 BHK1621.211
MALTI71 BHK1621.211
MALTI81 BHK1621.211
MALTI91 BHK1621.211
MALTI101 BHK1621.211
MALTI111 BHK1621.211
MALTI121 BHK1621.211
VAIJANTIGFOTHER000
VAIJANTI11 BHK1621.211
VAIJANTI21 BHK1621.211
VAIJANTI31 BHK1621.211
VAIJANTI41 BHK1621.211
VAIJANTI51 BHK1621.211
VAIJANTI61 BHK1621.211
VAIJANTI71 BHK1621.211
VAIJANTI81 BHK1621.211
VAIJANTI91 BHK1621.211
VAIJANTI101 BHK1621.211
VAIJANTI111 BHK1621.211
VAIJANTI121 BHK1621.211
RAJNIGANDHAGFOTHER000
RAJNIGANDHA11 BHK1221.211
RAJNIGANDHA21 BHK1221.211
RAJNIGANDHA31 BHK1221.211
RAJNIGANDHA41 BHK1221.211
RAJNIGANDHA51 BHK1221.211
RAJNIGANDHA61 BHK1221.211
RAJNIGANDHA71 BHK1221.211
RAJNIGANDHA81 BHK1221.211
RAJNIGANDHA91 BHK1221.211
RAJNIGANDHA101 BHK1221.211
RAJNIGANDHA111 BHK1221.211
RAJNIGANDHA121 BHK1221.211
APRAJITAGFOTHER000
APRAJITA12 BHK1632.61
APRAJITA22 BHK1632.61
APRAJITA32 BHK1632.61
APRAJITA42 BHK1632.61
APRAJITA52 BHK1632.61
APRAJITA62 BHK1632.61
APRAJITA72 BHK1632.61
APRAJITA82 BHK1632.61
APRAJITA92 BHK1632.61
APRAJITA102 BHK1632.61
APRAJITA112 BHK1632.61
APRAJITA122 BHK1632.61
APRAJITA132 BHK1632.61
GULMOHARBSMNTOTHER000
GULMOHARGFOTHER000
GULMOHAR12 BHK838.141
GULMOHAR22 BHK838.141
GULMOHAR32 BHK832.141
GULMOHAR42 BHK838.141
GULMOHAR52 BHK838.141
GULMOHAR62 BHK838.141
GULMOHAR72 BHK838.141
GULMOHAR82 BHK838.141
GULMOHAR92 BHK838.141
GULMOHAR102 BHK838.141
GULMOHAR112 BHK838.141
GULMOHAR122 BHK838.141
GULMOHAR132 BHK838.141
GULMOHAR142 BHK838.141
GULMOHAR152 BHK838.141
GULMOHAR162 BHK838.141
GULMOHAR172 BHK838.141
GULMOHAR182 BHK838.141
GULMOHAR192 BHK838.141
GULBAHARBSMNTOTHER000
GULBAHARGFOTHER000
GULBAHAR12 BHK838.141
GULBAHAR22 BHK838.141
GULBAHAR32 BHK838.141
GULBAHAR42 BHK838.141
GULBAHAR52 BHK838.141
GULBAHAR62 BHK838.141
GULBAHAR72 BHK838.141
GULBAHAR82 BHK838.141
GULBAHAR92 BHK838.141
GULBAHAR102 BHK838.141
GULBAHAR112 BHK838.141
GULBAHAR122 BHK838.141
GULBAHAR132 BHK838.141
GULBAHAR142 BHK838.141
GULBAHAR152 BHK838.141
GULBAHAR162 BHK838.141
GULBAHAR172 BHK838.141
GULBAHAR182 BHK838.141
GULBAHAR192 BHK838.141
AMALTASBSMNTOTHER000
AMALTASGFOTHER000
AMALTAS12 BHK838.141
AMALTAS22 BHK838.141
AMALTAS32 BHK838.141
AMALTAS42 BHK838.141
AMALTAS52 BHK838.141
AMALTAS62 BHK838.141
AMALTAS72 BHK838.141
AMALTAS82 BHK838.141
AMALTAS92 BHK838.141
AMALTAS102 BHK838.141
AMALTAS112 BHK838.141
AMALTAS122 BHK838.141
AMALTAS132 BHK838.141
AMALTAS142 BHK838.141
AMALTAS152 BHK838.141
AMALTAS162 BHK838.141
AMALTAS172 BHK838.141
AMALTAS182 BHK838.141
AMALTAS192 BHK838.141

Permits & Approvals

Permit No854/AA3/2025
Permit Date2025-06-05
Valid Until2030-06-04
Extendable Until2033-06-04

Documents

Filing documents

  • Details of Encumbrances
  • Other Plan(If Any)
  • Other Plan(If Any)
  • Proforma of Conveyance Deed
  • Proforma of Completion Certificate(Occupancy)
  • Waste Disposal Plan
  • Water Supply Plan
  • Electricity Supply Plan
  • CA CERTIFICATE
  • Other
  • Proforma of Agreement for Sale
  • Details of Encumbrances#New(2025-08-19)
    View
  • Commencement Certificate#New(2025-07-01)
    View
  • Proforma of Application Form#New(2025-07-01)
    View
  • Proforma of Allotment Letter#New(2025-07-01)
    View
  • Proforma of Conveyance Deed#New(2025-07-02)
    View
  • Waste Disposal Plan#New(2025-07-02)
    View
  • Water Supply Plan#New(2025-07-02)
    View
  • Electricity Supply Plan#New(2025-07-02)
    View
  • Development Work Plan#New(2025-07-01)
    View
  • Affidavit (Form-B)#New(2025-08-12)
    View
  • CA CERTIFICATE#New(2025-08-26)
    View
  • ARCHITECT CERTIFICATE#New(2025-07-01)
    View
  • ENGINEERS CERTIFICATE#New(2025-08-19)
    View
  • Proforma of Agreement for Sale#New(2025-07-24)
    View

Land documents

  • Extract of Khatauni#Letter(1900-01-01)
    16194471135.pdf
    View
  • Extract of Khatauni#1432(1900-01-01)
    16194472451.pdf
    View

Project Team

Architect AddressPradhikaran Bhavan Project Management Cell, Vipinkhand Gomti Nagar Lucknow-226010
Engineer AddressPradhikaran Bhawan Vipinkhand Gomti Nagar Lucknow

Developer & Contact

Developer

Promoter NameLucknow Development Authority
Promoter AddressLucknow Development Authority, Vipin Khand, Gomti Nagar, Lucknow
Company TypeCompetent authority
Mobile9918005512
Emailvicechairmanlda@gmail.com
Registered AddressLucknow Development Authority, Vipin Khand, Gomti Nagar, Lucknow
Contractor AddressChinmay Construction A-1, 7th Floor, 705 & 706 Urbanac Buisness Park, Vibhuti Khand, Gomtinagar, LUCKNOW-10

Development & Facilities

Development works

Demarcation Of PlotsPlot is already demarcated and the construction work is in progress with in the boundary.
Boundary WallBrick work boundary wall with RCC columns with 6 ft height is proposed around the project as per sanctioned plan.
Road Work6.00 mt. wide black top road has been provided for the vehicular movement. With aggregate of size 0–10 mm mixed with bitumen forms the base, which is coarse and 150 mm thick. Bitumen, such as cutback bitumen, emulsion, and asphalt, finds application in bitumen mix, tack coat, is proposed per sanctioned plan.
FootpathsFootpath shall be paved with concrete pavers and is according to the NIUA guidelines.
Water Supply Including Drinking Water Facilitieso Main Supply Line: Secure main water supply with adequate pressure. o Distribution: Plan vertical risers and horizontal distribution for all floors. o Sewage and Vent: -Outline systems for proper drainage The water line is connected to the water source, which will be a municipal water treatment plant, a well, or another water supply source. Pipelines, pumping stations, and control valves are installed to convey water from the main pump station to various parts of the building and site. The distribution network is designed to optimise flow rates, pressure levels, and water quality and built throughout the system.
Sewer SystemA centralised sewer system will be provided, a 300 mm to 600 mm diameter R.C.C. sewer line will be provided. The manhole size will be 900 mm dia (main), and the sub-branch line will be 600 mm dia of the manhole provided as per design of MEP system.
DrainStorm water system will be provided which will be connected to the Municipal drain/Trunk line as per specified plan.
ParksNot Applicable
Tree PlantingMany types of bushes and tree will be planted. Planted trees and bushes is the part of green area as per sanctioned plan.
Design For Electric Supply Including Street LightingA Centralized transformer, HT panel, LT panel, Feeder Pillar, and DG backup for common services like external lighting. is proposed as per sanctioned plan. L.T./L.V. line, 430 V Fidder piller, Ip-43, Street lights, will be provided. A 600x600 mm manhole will be provided for the L.T., L.V., and H.T. lines
Community BuildingsThere is no community building proposed in our project.
Treatment And Disposal System Of Sewage And Sullage WaterThe S.T.P. treats wastewater from the site to remove contaminants and pollutants before discharge into the environment. Treatment processes may include screening, sedimentation, biological treatment (such as activated sludge or bio filtration), and disinfection to meet regulatory standards and protect public health and the environment.
Solid Waste Management And Disposal SystemFor Waste management and garbage collection chambers are proposed as per layout. After completing the project, it will be handed over to the local municipal corporation.
Water Conservation SystemA well-designed rainwater harvesting system shall be provided.
Energy Management System Including Use Of Renewable EnergyWe will use LED lights as well as solar lights in external areas for energy management system.
Fire Protection And Fire Safety Systemo Fire norms shall be followed as per NBC and approval of the fire department. Include smoke detectors, heat detectors, and manual pull stations throughout the building. Centralized monitoring with integration for emergency response. Design: Specify a comprehensive sprinkler system (wet, dry, or pre-action). o Hydraulic Calculations: Conduct calculations for water supply and pressure requirements.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot applicable
Emergency Evacuation ServicesThe staircase will be provided with emergency exit doors in each floor as per fire department specs
Other Miscellaneous WorkGrand entrance lobby shall be provided.

Financials

Registration Fee (₹)222000
Project Duration (months)59