Basantkunj yojna Sector G

by Lucknow Development Authority

Lucknow, Uttar Pradesh · UPRERAPRJ569665/08/2025

Registered

Overview

Registration Date2025-08-05
RERA NumberUPRERAPRJ569665/08/2025
Promoter IDUPRERAPRM10102
Proposed Start2025-07-01
Proposed Completion2030-01-24

Location

DistrictLucknow
TehsilLucknow
VillageBarafkhana
LocalityGajrahar, Ahmadganj
AddressHardoi Roadd Basantkunj Luckknow
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Plots53

Khasra records (1)

  • 21,31,32,33,34,36,37,38,39,148,150,230,233,234,235,243,245,246,247,248,251,252,253,254,255,258S, 14, 15, 16, 17, 18, 67, 36, 37/1,37/2,40,44,45,70,209,210,219,220,221,222,223,224,225,227,228,238,231,232,234,235,25,26,27,28,29,30,31,33,34,35,46,47,48,49,50,51,473,474,475,476,477,478,479/1,479/3,479/5,479/6,479/12,480· Khasra· 38630

Inventory

Plots

TypeSize rangeCount
PlotAbove 500 sqm1
Plot250 to 500 sqm52

Permits & Approvals

Permit No534
Permit Date2025-01-25
Valid Until2030-01-24
Extendable Until2033-01-24

Documents

Filing documents

  • Other Plan(If Any)
  • CA CERTIFICATE
  • Proforma of Agreement for Sale
  • Details of Encumbrances#New(2025-05-15)
    View
  • Commencement Certificate#New(2025-05-15)
    View
  • Proforma of Application Form#New(2025-05-15)
    View
  • Proforma of Allotment Letter#New(2025-05-15)
    View
  • Proforma of Conveyance Deed#New(2025-05-15)
    View
  • Proforma of Completion Certificate(Occupancy)#New(2025-05-15)
    View
  • Waste Disposal Plan#New(2025-07-21)
    View
  • Water Supply Plan#New(2025-07-21)
    View
  • Electricity Supply Plan#New(2025-07-21)
    View
  • Development Work Plan#New(2025-05-15)
    View
  • Affidavit (Form-B)#New(2025-05-15)
    View
  • CA CERTIFICATE#New(2025-07-16)
    View
  • ARCHITECT CERTIFICATE#New(2025-05-15)
    View
  • ENGINEERS CERTIFICATE#New(2025-05-19)
    View
  • Other#New(2025-05-15)
    View
  • Proforma of Agreement for Sale#New(2025-06-23)
    View

Land documents

  • Extract of Khatauni#Resumption Letter(1900-01-01)
    14702469640.pdf
    View

Project Team

Architect AddressPradhikaran Bhawan Vipinkhand Gomti Nagar Lucknow Pin-226010
Engineer AddressPradhikaran Bhawan Vipinkhand Gomti Nagar Lucknow Pin-226010

Developer & Contact

Developer

Promoter NameLucknow Development Authority
Promoter AddressLucknow Development Authority, Vipin Khand, Gomti Nagar, Lucknow
Company TypeCompetent authority
Mobile9918005512
Emailvicechairmanlda@gmail.com
Registered AddressLucknow Development Authority, Vipin Khand, Gomti Nagar, Lucknow
Contractor AddressPradhikaran Bhawan Vipinkhand Gomti Nagar Lucknow Pin-226010

Bank Accounts

Account Typecollection
Account Number50200108117766
Account NameLDA COLL A/C BASANTKUNJ YOJANA SECTOR-G
Bank NameHDFC Bank Ltd.
BranchHazratganj
Branch Address31/31, M.G. ROAD HAZRATGUNJ LUCKNOW UTTAR PRADESH 226001
Branch DistrictLucknow
Branch StateSelect
IFSCHDFC0000078
Branch Emailmohammad.firoz@hdfbank.com
Account Typeseparate
Account Number50200108149216
Account NameLDA SEP A/C BASANTKUNJ YOJANA SECTOR-G
Bank NameHDFC Bank Ltd.
BranchHazratganj
Branch Address31/31, M.G. ROAD HAZRATGUNJ LUCKNOW UTTAR PRADESH 226001
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCHDFC0000078
Account Typetransaction
Account Number50200108121813
Account NameLDA TRN A/C BASANTKUNJ YOJANA SECTOR-G
Bank NameHDFC Bank Ltd.
BranchHazratganj
Branch Address31/31 M.G. Road Hazratganj Lucknow
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCHDFC0000078

Development & Facilities

Development works

Demarcation Of PlotsDemarcation of Plots Demarcation of plots will be done after the development work will be completed
Boundary WallNo boundary wall is propsoed
Road WorkThe roads in sector 6 has been designed with varying width 24,12,18 & 9m. Pathways, Cycle Track, are provided to enhance mobility
Footpathsfootpath will be developed with interlocking tiles and electric trench will run through footpath. The footpath will be 1.2mtrs to 1.8 mtrs as per road
Water Supply Including Drinking Water FacilitiesThe water will be supplied through borewell and Overhead Tanks and UG Tanks for commercial tanks. The diameter of the water pipeline is 100mm to 250mm as per population and load demand.
Sewer SystemThe provision of seweage chamber for sector -06 to manage waste water efficiently. The diameter of sewage pipe is 200mm to 800mm as per population. The material of pipe is DWC SN8.
DrainSurafce drain is of RCC and the diameter is 300mm to 1200mm and depth is 300mm to 1800mm
ParksParks will be developed as per sanction layout and the parks will have brick walls of height 5ft as per design
Tree PlantingLandscaping & Tree Plantation on green belts along roads and parks to create a greener, healthier & more pleasant environment.
Design For Electric Supply Including Street LightingElectric work is proposed including street light on each external road through electric pole. Street Lighting is provided for the road visibility. The main substation is 220/33KV and second tier substation is 33/11 KVA and sectoral 11/.433 KV substation.
Community BuildingsA area of 3870.25Sqm 6/COM-01 is provided for community Buildings
Treatment And Disposal System Of Sewage And Sullage WaterIt Has been provided on the sector-08
Solid Waste Management And Disposal SystemA Big plot Has been provided for garbage of entire sector will be collected in sector-01 and A garbage plot has been provided for each sector.
Water Conservation SystemRain water harvesting pits are provided on the parks.
Energy Management System Including Use Of Renewable Energy100% Led Lighting Considered Instead Of Cfl Or Incandescent Lamps,Provision Of Minimum 3 Star Rated Electrical Equipments,Provision Of Energy Management Strategy & Analysis Provisions With Multifunction Meters Compatible With Scada,Considering 2 % Voltage Drop For Power Distribution In Lt & 4% In Ht,Plug In Provision In Feeder Panels For Other Renewable Sources To Reduce Distribution Losses ,Astronomical & Timer Based Switching For Street Lighting
Fire Protection And Fire Safety System1 FIRE STATION plot has been provided for sector 6 and 7. the area of 7/FS-01= 1978.00 Sqm is provided.
Social Infrastructure And Other Public Amenities Including Public Health ServicesArea reserved for such amenities are demarcated in the sanction layout
Emergency Evacuation ServicesN/A
Other Miscellaneous WorkN/A

Financials

Registration Fee (₹)228000
Project Duration (months)55