Basantkunj Yojna Sector- H
by Lucknow Development Authority
Lucknow, Uttar Pradesh · UPRERAPRJ581820/04/2024
Overview
Registration Date2024-04-17
RERA NumberUPRERAPRJ581820/04/2024
Promoter IDUPRERAPRM10102
Proposed Start2024-04-01
Proposed Completion2029-01-30
Location
DistrictLucknow
TehsilLucknow
VillageSector H
AddressHardoi Road Basantkunj Lucknow pin226003
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Plots152
Khasra records (1)
- 1,2,5,6,7,8,9,17· Khasra· 22040 m²
Inventory
Plots
| Type | Size range | Count |
|---|---|---|
| Plot | UPTO 100 sqm | 144 |
| Plot | 200 to 250 sqm | 8 |
Permits & Approvals
Permit No2290APA/24
Permit Date2024-01-31
Valid Until2029-01-30
Extendable Until2032-01-30
Documents
Filing documents
- Details of Encumbrances
- Other Plan(If Any)
- Other Plan(If Any)
- Other
- Proforma of Agreement for Sale
- Proforma of Agreement for Sale
- Details of Encumbrances#New(2024-04-03)View
- Commencement Certificate#New(2024-02-24)View
- Proforma of Application Form#New(2024-02-24)View
- Proforma of Allotment Letter#New(2024-02-24)View
- Proforma of Conveyance Deed#New(2024-02-24)View
- Proforma of Completion Certificate(Occupancy)#New(2024-02-24)View
- Waste Disposal Plan#New(2024-02-24)View
- Water Supply Plan#New(2024-02-24)View
- Electricity Supply Plan#New(2024-02-24)View
- Development Work Plan#New(2024-02-24)View
- Affidavit (Form-B)#New(2024-02-24)View
- CA CERTIFICATE#New(2024-02-24)View
- ARCHITECT CERTIFICATE#New(2024-02-24)View
- ENGINEERS CERTIFICATE#New(2024-02-24)View
Project Team
Architect AddressPradhikaran Bhawan Vipin Khand Gomti Nagar Lucknow
Engineer AddressPradhikaran Bhawan Vipin Khand Gomti Nagar Lucknow
Developer & Contact
Developer
Promoter NameLucknow Development Authority
Promoter AddressLucknow Development Authority, Vipin Khand, Gomti Nagar, Lucknow
Company TypeCompetent authority
Mobile9918005512
Emailvicechairmanlda@gmail.com
Registered AddressLucknow Development Authority, Vipin Khand, Gomti Nagar, Lucknow
Contractor AddressPradhikaran Bhawan Vipin Khand Gomti Nagar Lucknow
Bank Accounts
Account Typecollection
Account Number628101111421
Account NameSECRETARY LDA COLLECTION ACCOUNT FOR BASANT KUNJ YOJNA SECTOR -H
Bank NameICICI Bank Ltd.
BranchHazratgajn Branch
Branch Address1, Mg Road, Hazarat Gunj, Lucknow. 226001
Branch DistrictLucknow
Branch StateSelect
IFSCICIC0006281
Branch EmailVinesh.sondhiya@icicibank.com
Account Typeseparate
Account Number628101111422
Account NameSECRETARY LDA SEPARATE ACCOUNT FOR BASANT KUNJ YOJNA SECTOR -H
Bank NameCICI Bank Ltd.
BranchHazratgajn Branch
Branch Address1, Mg Road, Hazarat Gunj, Lucknow. 226001
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCICIC0006281
Account Typetransaction
Account Number628101111420
Account NameSECRETARY LDA TRANSACTION ACCOUNT FOR BASANT KUNJ YOJNA SECTOR - H
Bank NameICICI Bank Ltd.
BranchHazratgajn Branch
Branch Address1, Mg Road, Hazarat Gunj, Lucknow. 226001
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCICIC0006281
Development & Facilities
Development works
Demarcation Of PlotsDemarcation of plots will be done after all the development work is completed
Boundary WallBrick maid boundry wall at the height of 0.85 m and Length of 295.20 m is propose.
Road WorkRoad will be constructed as per sanctioned layout plan. Earth filling work sub grade prepration, GSB -200 mm laying , WMM=150 mm laying and final Premix carpet=20 mm will be done in stepwise construction/development program.
FootpathsFoothpaths will be made as per requirment.
Water Supply Including Drinking Water Facilitieswater supply through overhead water tank already constructed nearly sector H. HDPE pipe 110 mm ,160 mm , Swith Incubus, Air valves, Fire Hydrant Shuld be installed as per sanctioned plan.
Sewer SystemSewer systemwith STP proposed . Sewer will be constructed underground which will be linked with the main trunck sewer using 250 mm SN 8 Pipe and 300mm SN 8 Pipe at adjcent main road STP is situated at Daulatganj for the proposed project.
DrainRCC Drain system with the size of 300mmX350 MM and 50 mmX600 mm will be constructed as per the sanction layout plan.
ParksAll the parkhs will be developed as per the sanctioned lyout plan according to specifications Brick made boundry wall at the height of 1 meter is also propose around the parkh.
Tree PlantingMany type of flower Bushes and trees is propose to plant in the park bushes and trees is the part of the green area.
Design For Electric Supply Including Street LightingElectrical work is proposed street lighting on each external road through electric pole
Community BuildingsN/A
Treatment And Disposal System Of Sewage And Sullage WaterSTP is situated at Daulat ganj near Basantkunj for disposal of sewer to adjcent main trank sewer line already laid at adjcent main road.
Solid Waste Management And Disposal SystemSplid waste management and disposal system has been already proposed to adjcent sector of Basantkunj there for SWM will be done at nearby site. After completing the project Solid waste management system will be handed over tho the local Muncipal Corporation
Water Conservation SystemYes provision of disposal of drain/ storm water through Rain Water Harvesting
Energy Management System Including Use Of Renewable EnergyN/A
Fire Protection And Fire Safety SystemN/A
Social Infrastructure And Other Public Amenities Including Public Health ServicesArea Reserved for Commercial Plots.
Emergency Evacuation ServicesN/A
Other Miscellaneous WorkN/A
Financials
Registration Fee (₹)173250
Project Duration (months)58