Belvedere Suites (GH-12) Integrated Township

by M/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited)

Lucknow, Uttar Pradesh · UPRERAPRJ263280

Registered

Total units

90

Overview

Registration Date2022-05-27
RERA NumberUPRERAPRJ263280
Promoter IDUPRERAPRM10813
Proposed Start2022-10-01
Proposed Completion2026-09-30

Location

DistrictLucknow
TehsilLucknow
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Total Units90
Unit Types2
Blocks1
Floors29

Khasra records (1)

  • 91, 93, 321, 327, 322, 323· Khasra· 6541

Inventory

Apartments (56 rows)
BlockFloorTypeCountCarpet (m²)BalconyGarage
Tower AGFOTHER000
Tower A14 BHK2171.996
Tower A14 BHK2218.385
Tower A24 BHK2171.996
Tower A24 BHK2218.385
Tower A34 BHK2171.996
Tower A34 BHK2218.385
Tower A44 BHK2171.996
Tower A44 BHK2218.385
Tower A54 BHK2171.996
Tower A54 BHK2218.385
Tower A64 BHK2171.996
Tower A64 BHK2218.385
Tower A74 BHK2171.996
Tower A74 BHK2218.385
Tower A84 BHK2171.996
Tower A84 BHK2218.385
Tower A94 BHK2171.996
Tower A94 BHK2218.385
Tower A104 BHK2171.996
Tower A104 BHK2218.385
Tower A114 BHK2171.996
Tower A114 BHK2218.385
Tower A124 BHK2171.996
Tower A124 BHK2218.385
Tower A134 BHK2171.996
Tower A134 BHK2218.385
Tower A144 BHK2171.996
Tower A144 BHK2218.385
Tower A154 BHK2171.996
Tower A154 BHK2218.385
Tower A164 BHK2171.996
Tower A164 BHK2218.385
Tower A174 BHK2171.996
Tower A174 BHK2218.385
Tower A184 BHK2171.996
Tower A184 BHK2218.385
Tower A194 BHK2171.996
Tower A194 BHK2218.385
Tower A204 BHK2171.996
Tower A204 BHK2218.385
Tower A214 BHK2171.996
Tower A214 BHK2218.385
Tower A22OTHER000
Tower A23OTHER1165.113
Tower A23OTHER1165.113
Tower A24OTHER01464
Tower A24OTHER01464
Tower A25OTHER1165.113
Tower A25OTHER1165.113
Tower A26OTHER01464
Tower A26OTHER01464
Tower A27OTHER1165.113
Tower A27OTHER1165.113
Tower A28OTHER01464
Tower A28OTHER01464

Permits & Approvals

Permit NoGroup Housing/04646/LDA/BP/21-22/1571/30032022
Permit Date2022-04-23
Valid Until2027-04-22
Extendable Until2030-04-22

Documents

Filing documents

  • Other Plan(If Any)
  • Proforma of Completion Certificate(Occupancy)
  • Details of Encumbrances#New(2022-04-22)
    View
  • Commencement Certificate#New(2022-05-30)
    View
  • Other Plan(If Any)#New(2022-05-07)
    View
  • Proforma of Application Form#New(2022-04-22)
    View
  • Proforma of Allotment Letter#New(2022-04-22)
    View
  • Proforma of Conveyance Deed#New(2022-04-22)
    View
  • Waste Disposal Plan#New(2022-04-21)
    View
  • Water Supply Plan#New(2022-04-22)
    View
  • Electricity Supply Plan#New(2022-04-22)
    View
  • Development Work Plan#New(2022-04-21)
    View
  • Affidavit (Form-B)#New(2022-04-19)
    View
  • CA CERTIFICATE#New(2022-04-22)
    View
  • ARCHITECT CERTIFICATE#New(2022-04-19)
    View
  • ENGINEERS CERTIFICATE#New(2022-04-19)
    View
  • Other#New(2022-04-21)
    View

Land documents

  • Registry Document#4798(2015-04-09)
    4423951832REG.NO-4798_compressed_compressed.pdf
    View
  • Sale Deed#10650(2015-07-13)
    4423951135REG NO. 10650.pdf
    View
  • Sale Deed#10036(2015-06-30)
    4423953192REG NO. 10036.pdf
    View
  • Registry Document#5396(2015-04-18)
    4423953903Transfer Deed No. 5396.pdf
    View
  • Extract of Khatauni#Khatauni extracts of all Khasra of the project land(1900-01-01)
    4423952797Khasra_Details of GH-12.pdf
    View
  • Extract of Khatauni#Land Area Details - Belvedere Suits GH-12(1900-01-01)
    4423958668Land Details- Belvedere Suits.pdf
    View
  • Extract of Khatauni#Reply to objection Letter - GH-12(1900-01-01)
    4423958493Reply to objection letter - GH-12.pdf
    View
  • Extract of Khatauni#Reply to 2nd query letter_Affidavit attached - Belvedere Suites GH-12(1900-01-01)
    4423958067Reply to 2nd Query Letter_Affidavit Attached.pdf
    View
  • Extract of Khatauni#LDA Letter for 28 floor plan sanctioned(1900-01-01)
    4423956913LDA Letter for 28 Floor Plan_Belvedere Suites GH-12.pdf
    View
  • Extract of Khatauni#LDA Letter for clarification of 28 floor plan of the project Belvedere Suites GH-12(1900-01-01)
    4423953204LDA Letter for 28 Floor Plan_Belvedere Suites GH-12.pdf
    View
  • Extract of Khatauni#Request Letter to The Secretary, RERA for grant of registration no. for GH-12, LDA letter attached(1900-01-01)
    4423953722Request_Letter_to_Secretary_RERA_for_Registration_of_GH-12_Letter_of_LDA_attached.pdf
    View

Project Team

Architect AddressD-102, Chhatarpur, New Delhi-110074
Engineer AddressI-1738, Chittaranjan Park, New Delhi-110019

Developer & Contact

Developer

Promoter NameM/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited)
Promoter Address11th floor, Shalimar Titanium Vibhuti Khand Gomti Nagar Lucknow-226010 UP India
Company TypeCompany
Mobile8795427222
Emailhasnain.husain@shalimar.org
Registered Address11th floor, Shalimar Titanium Vibhuti Khand Gomti Nagar Lucknow-226010 UP India
Contractor Address182-C, Eldeco Udyan-1, Lucknow-226002

Bank Accounts

Account Typecollection
Account Number42036164749
Account NameANS DPL COLLECTION A/C BELVEDERE SUITES GH-12
Bank NameState Bank of India
BranchCommercial Branch, Lucknow
Branch Address6A, Way Road, Gokhle Marg, Lucknow
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCSBIN0004166
Branch Emailambrish.dwivedi@sbi.co.in
Account Typeseparate
Account Number41599991413
Account NameANS DPL SEPARATE A/C BELVEDERE SUITES GH-12
Bank NameState Bank of India
BranchCommercial Branch, Lucknow
Branch Address6A, Way Road, Gokhle Marg, Lucknow
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCSBIN0004166
Branch Emailambrish.dwivedi@sbi.co.in
Account Typetransaction
Account Number42036165380
Account NameANS DPL TRANSACTION A/C BELVEDERE SUITES GH-12
Bank NameState Bank of India
BranchCommercial Branch, Lucknow
Branch Address6A, Way Road, Gokhle Marg, Lucknow
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCSBIN0004166
Branch Emailambrish.dwivedi@sbi.co.in

Development & Facilities

Development works

Demarcation Of PlotsAs per approved sanction plan.This is single plot traingle shaped , having total 1 no. of entry gate and 1no. of exit gate from the 45 mtr wide front road and 30 mtr internal road. Site is surronded by 45 mtr road and 30 mtr road from North and West respectively and a green plot from East side.
Boundary Wall1.8 - 2.1m high and 200 mm thick Boundary wall designed . Brick Work of 9inches and rcc work in column and beam may be used as per design. MS Broad entrance and exit gates are developed with boundary.
Road WorkTrimix / asphalt road will be used as per deisgn suggested by the Architect for internal road.
FootpathsAll internal roads will have narrow footpath with matt finish tiles pavers or equivalent finishes as per landscape design.
Water Supply Including Drinking Water FacilitiesAll apartments shall be provided with domestic water for household activities and STP treated water for flushing. Ground water may also be used and user can have their individual RO system as per their requirement.The STP treated water shall also be supplied for irrigation purposes. For the same water tanks are getting created in underground and on terrace. Separate tanks are provided for fire water.
Sewer SystemCentralized Sewerage system shall be Provided. All Sewerage water shall go to the STP for treatement. after treatement ,water shall be recycled and it will use in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system.
DrainStorm water system shall be Provided. Storm water from Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain line.
ParksThere is a significant green area beside building including green parks, play areas for childrens and different recretional activities.
Tree PlantingThe trees of category ornamental ,shady and native species shall be planted in the entire project as per the species recommende in the landscape in order to maintatin greenary and natural view.
Design For Electric Supply Including Street LightingWe have designed the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting with timer control,STP,Pump room etc.
Community BuildingsFully centralised AC Club House/community center is proposed, swimming pool and some temporary kiosks on the central atrium with sitting area of each building. Club comprises of mini-theatre,spa with steam and sauna ,swimming pools with changing rooms,yoga/medidation room, multipurpose hall ,Gymanasium,squash court,indoor playing areas etc.
Treatment And Disposal System Of Sewage And Sullage WaterCentralized Sewerage system for entire project and all towers shall be connected to STP . All Sewerage water shall go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system.
Solid Waste Management And Disposal SystemProject shall have waste segregation area and OWC for treatment of organic waste.The solid waste shall be encouraged for segregation with in all apartments. the dustbins shall be provided for segregated waste in the common areas. from where the bio waste shall be converted to manure through owc within the campus and other waste shall be handed over to the government vendors for further disposal.
Water Conservation SystemA well designed rain water harvesting system shall be provided for the whole building complex to conserve water by ensuring adequate nos. of recharge pits
Energy Management System Including Use Of Renewable EnergyWe will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor. 25 % of Terrace is covered with Solar Voltaic Panels to provide Renewable source of energy for common areas in building complex. Also timer control panels shall be used for efficient energy managemen.
Fire Protection And Fire Safety SystemAll Fire norms shall be followed as per NBC code and approval of fire department. fire sprinklers,smoke detectors,FHC with pumps are provided as per norms.
Social Infrastructure And Other Public Amenities Including Public Health ServicesThe Social infrastructure shall be provided with domestic water supply with tanks,STP treted water for flushing with tanks and irrigation ,storm /rain water drainage system,sewer drainage system,waste water drainage system,firefighting system including sprinklers ,FHC detectors ,fire water tank ,authority main power supply ,Dg power backup for essential common supply,lifts.
Emergency Evacuation ServicesFire Staricase is provided in the each building, with fire resistant doors, basements have 1 (one) accesse and exit in case of emergency. Dedicated assembly areas are also defined in the campus.Adequate signage is also provided.
Other Miscellaneous WorkNot applicable

Financials

Registration Fee (₹)38000
Project Duration (months)48