BIBHAB GARDEN CITY

by BIBHAB BUILDERS

Agra, Uttar Pradesh · UPRERAPRJ123116

Registered

Overview

Registration Date2023-05-10
RERA NumberUPRERAPRJ123116
Promoter IDUPRERAPRM217017
Proposed Start2022-08-01
Proposed Completion2027-04-26

Location

DistrictAgra
TehsilAgra
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Plots60

Khasra records (1)

  • Land at part of Khasra No. 67, Mauja Miyapur, Agra· Khasra· 13527

Inventory

Plots

TypeSize rangeCount
PlotUPTO 100 sqm5
Plot100 to 150 sqm40
Plot150 to 200 sqm15

Permits & Approvals

Permit NoPlotted development/02528/ADA/LD/21-22/1299/15032022
Permit Date2022-04-27
Valid Until2027-04-26
Extendable Until2030-04-25

Documents

Filing documents

  • Other Plan(If Any)
  • Proforma of Completion Certificate(Occupancy)
  • Waste Disposal Plan
  • Development Work Plan
  • Other
  • Details of Encumbrances#New(2023-04-05)
    View
  • Commencement Certificate#New(2023-04-05)
    View
  • Proforma of Application Form#New(2023-04-05)
    View
  • Proforma of Allotment Letter#New(2023-04-05)
    View
  • Proforma of Conveyance Deed#New(2023-04-05)
    View
  • Waste Disposal Plan#New(2023-04-06)
    View
  • Water Supply Plan#New(2023-04-05)
    View
  • Electricity Supply Plan#New(2023-04-24)
    View
  • Affidavit (Form-B)#New(2023-04-05)
    View
  • CA CERTIFICATE#New(2023-04-05)
    View
  • ARCHITECT CERTIFICATE#New(2023-04-05)
    View
  • ENGINEERS CERTIFICATE#New(2023-04-05)
    View

Land documents

  • Registry Document#12256(2021-12-23)
    7135395645TDI City Land Purchase Deed.pdf
    View

Project Team

Architect Address717, Gaur Heights, Sector 4, Vaishali, Ghaziabad, 201010
Engineer AddressBF-102 FF, Janak Puri, New Delhi -110058

Developer & Contact

Developer

Promoter NameBIBHAB BUILDERS
Promoter Address86, BIBHAB TRADE CENTRE, BYE PASS ROAD, AGRA-282005, UTTAR PRADESH
Company TypePartnership Firm
Mobile9068803875
Emailbibhabbuilders164@gmail.com
Registered Address86, BIBHAB TRADE CENTRE, BYE PASS ROAD, AGRA-282005, UTTAR PRADESH
Contractor Address86, Bibhab Center, By Pass Road, Agra

Bank Accounts

Account Typecollection
Account Number0983002100028377
Account NameBibhab Builders Collection Account For Bibhab Garaden City
Bank NamePunjab National Bank
BranchSurya Nagar, Agra
Branch AddressSurya Nagar, Agra 282002
Branch DistrictAgra
Branch StateUttar Pradesh
IFSCPUNB0098300
Account Typeseparate
Account Number0983002100028401
Account NameBibhab Builders Separate Account for Bibhab Garden City
Bank NamePunjab National Bank
BranchSurya Nagar
Branch AddressSurya Nagar, Agra 282002
Branch DistrictAgra
Branch StateUttar Pradesh
IFSCPUNB0098300
Account Typetransaction
Account Number0983002100028368
Account NameBibhab Builders Transaction Account For Bibhab Garden City
Bank NamePunjab National Bank
BranchSurya Nagar
Branch AddressSurya Nagar, Agra
Branch DistrictAgra
Branch StateUttar Pradesh
IFSCPUNB0098300

Development & Facilities

Development works

Demarcation Of PlotsThe Project Land will be demarcated with the Boundary wall. The Demarcated land will be as per the approved and sanctioned map of Agra Development Authority. The individual plots will be demarcated using survey tools to match the shape , size and orientation as per approved map by Agra Development Authority.
Boundary WallBoundary wall of 6 to 8 feet height with provision of barbed wire at certain locations. The depth of wall foundation will be as per design to ensure the wall is earthquake resistant. The brick wall will be done with cement mortar and the plastered and painted with all season paint.
Road WorkThe project has road widths of 9.0 m and 7.5m. The paved section will be constructed using interlocking paver blocks with M-40 compressive strength and depth as per design. The paver blocks will be laid on 50mm sand bed laid over compacted granular layer.
FootpathsThe foot path will be done with interlocking paver blocks of M-20 compressive strength . The paver block will be colored to accentuate the walking experience and the surface will be anti-skid and comfortable for walking.
Water Supply Including Drinking Water FacilitiesThe potable ground water will be extracted through a submersible pump. The pumped water will lead to the overhead tank and the same will reach the individual units through under ground PVC pipe line.
Sewer SystemThe sewer system will be constructed in the project . The Man holes and the connecting hume pipes will be installed to ensure continuous flow of domestic sewer through slope to the municipal sewer line.
DrainLined covered drains will be constructed with MS grills sections for inspection. The drain will be designed to cater the domestic and rains water . The drains discharge will e connected to the municipal drain
Parks2 Parks will be developed in the project as per approved sanctioned map by Agra Development Authority. the total area covered by the parks will be more than 1000 square meter. The park will be developed as per landscape plan. The grass cover and footpath will be provided.
Tree PlantingThe trees will be planted along the boundary walls and periphery of park and at all suitable locations of the project to the minimum numbers as per sanction.
Design For Electric Supply Including Street LightingThe transformer will be installed as per approved load sanctioned by the electrical department. The electrical connection will be lead to each unit through overhead wires and distribution boxes. The ISI marked cables will be used in the project
Community BuildingsNot Applicable
Treatment And Disposal System Of Sewage And Sullage WaterThe state-of-the-Art sewage treatment plant will be installed in the project . The domestic sewer will be collected through sewer lines and into the collection chamber of STP where the sewer will be treated to bring the effluents level below the permissible limit prior to disposal in the municipal sewer or designated location
Solid Waste Management And Disposal SystemThe Garbage collection center covering the area of 15.66 square meter will be constructed in the project . The dust bins will be installed to keep the project clean and green
Water Conservation SystemA rain water harvesting pit will be installed to collect the runoff and discharge the water into the ground through collection chamber built for multi stage filtration . The filtered water will be carried throug the sand filled perforated pipe going t minimum depth of 40m
Energy Management System Including Use Of Renewable EnergyNot Applicable. Yet all the green technologies will be adopted in the project
Fire Protection And Fire Safety SystemNot Applicable
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicale
Emergency Evacuation ServicesNot Applicable
Other Miscellaneous WorkAs per project requirement and improvements

Financials

Registration Fee (₹)62500
Project Duration (months)57