Bluemoon Central

by Progressive Construction

Ghaziabad, Uttar Pradesh · UPRERAPRJ269354/09/2025

Registered

Total units

154

Overview

Registration Date2025-09-11
RERA NumberUPRERAPRJ269354/09/2025
Promoter IDUPRERAPRM382126
Proposed Start2025-09-01
Proposed Completion2029-03-17

Location

DistrictGhaziabad
TehsilGhaziabad
VillageNoor Nagar
LocalityRaj Nagar, 201001
AddressKhasra no. 1187 and 1188
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Total Units154
Unit Types2
Blocks1
Floors8

Khasra records (2)

  • 1188· Khasra· 300
  • 1187,1188· Khasra· 5780

Inventory

Apartments (39 rows)
BlockFloorTypeCountCarpet (m²)BalconyGarage
1LGFSHOP27.17810
1LGFSHOP28.28570
1LGFSHOP211.08520
1LGFSHOP311.50180
1LGFSHOP112.780
1LGFSHOP213.38090
1LGFSHOP114.1750
1LGFSHOP115.830
1LGFSHOP216.00620
1LGFSHOP618.330
1LGFSHOP119.00210
1UGFSHOP27.17810
1UGFSHOP27.68250
1UGFSHOP28.28570
1UGFSHOP110.67080
1UGFSHOP111.49960
1UGFSHOP311.50180
1UGFSHOP113.1850
1UGFSHOP213.38090
1UGFSHOP113.8150
1UGFSHOP115.830
1UGFSHOP618.330
1UGFSHOP119.00210
1UGFOTHER1160.380
11SHOP110.60
11SHOP111.380
11SHOP112.24810
11SHOP413.47570
12OTHER1779.40
13OTHER2623.030
14OTHER2623.030
16OTHER1617.0320
1UGFSHOP216.00620
1LGFSHOP37.68250
1LGFOTHER1158.30
11OTHER150.52360
11OTHER1144.25120
11OTHER1251.93310
15OTHER2223.030

Permits & Approvals

Permit NoHotel/06152/GDA/BP/22-23/0416/28122023
Permit Date2024-03-18
Valid Until2029-03-17
Extendable Until2032-03-16

Documents

Filing documents

  • Proforma of Completion Certificate(Occupancy)
  • Other
  • Details of Encumbrances#New(2025-08-11)
    View
  • Commencement Certificate#New(2025-08-08)
    View
  • Other Plan(If Any)#New(2025-08-07)
    View
  • Proforma of Application Form#New(2025-08-07)
    View
  • Proforma of Allotment Letter#New(2025-08-07)
    View
  • Proforma of Conveyance Deed#New(2025-08-07)
    View
  • Waste Disposal Plan#New(2025-08-07)
    View
  • Water Supply Plan#New(2025-08-07)
    View
  • Electricity Supply Plan#New(2025-08-07)
    View
  • Development Work Plan#New(2025-08-07)
    View
  • Affidavit (Form-B)#New(2025-08-13)
    View
  • CA CERTIFICATE#New(2025-08-29)
    View
  • ARCHITECT CERTIFICATE#New(2025-08-27)
    View
  • ENGINEERS CERTIFICATE#New(2025-08-27)
    View
  • Proforma of Agreement for Sale#New(2025-08-29)
    View

Land documents

  • Registry Document#5768(2025-05-16)
    16883291262.pdf
    View
  • Extract of Khatauni#1427-1432(1900-01-01)
    16883296800.pdf
    View
  • Registry Document#6610, 6614(2007-08-29)
    16883296400.pdf
    View
  • Registry Document#5501(2021-12-17)
    16883299386.pdf
    View

Project Team

Architect AddressD201, Bluemoon Homes, Rajnagar Extension, Ghaziabad
Engineer Address212 Tower -A , I-Thum A- 40 Sector -62 noida 201301

Developer & Contact

Developer

Promoter NameProgressive Construction
Promoter AddressKhasra No.–1188, Raj Nagar Extension, NH-58, Ghaziabad-201003
Company TypePartnership Firm
Mobile8800519118
Emailprogressiveconstructiongzb@gmail.com
Registered AddressKhasra No.–1188, Raj Nagar Extension, NH-58, Ghaziabad-201003
Contractor AddressPlot No. 194, Near PNB, Chhapraula, Dadri, Gautam Budh Nagar, Uttar Pradesh-201008

Bank Accounts

Account Typecollection
Account Number50200095665396
Account NameM/s. Progressive Con Collection Ac Bluemoon C
Bank NameHDFC Bannk Limited
BranchRaj Nagar Extension
Branch AddressSN 116 to 119, 1st Floor, VVIP Style Mall, Raj Nagar Extension, Ghaziabad, Uttar Pradesh 201017
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCHDFC0009481
Branch EmailKuldeep.jain@hdfcbank.com
Account Typeseparate
Account Number50200095605510
Account NameM/s. Progressive Con Separate A/c Bluemoon C
Bank NameHDFC Bannk Limited
BranchRaj Nagar Extension
Branch AddressSN 116 to 119, 1st Floor, VVIP Style Mall, Raj Nagar Extension, Ghaziabad, Uttar Pradesh 201017
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCHDFC0009481
Account Typetransaction
Account Number50200095847033
Account NameM/s. Progressive Con Transacti A/c Bluemoon C
Bank NameHDFC Bannk Limited
BranchRaj Nagar Extension
Branch AddressSN 116 to 119, 1st Floor, VVIP Style Mall, Raj Nagar Extension, Ghaziabad, Uttar Pradesh 201017
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCHDFC0009481

Development & Facilities

Development works

Demarcation Of PlotsCovered by temporary sheets on the point 24MT. Wide side Road-72.00M, 24MT. Wide Front Road-35.00 Mt, Rear 35 Mt.
Boundary Wall8ft. Height boundary wall of RCC wall/Colum and brick work as per drawings
Road WorkCement Concrete / Concrete Pavers with average thickness of 100MM
Footpaths75MM height from the road level with CC interlocking tile over the sub base of 100MM thick P.C.C work.
Water Supply Including Drinking Water FacilitiesUnderground and Covered water tanks are provided and connection to each and every toilet and kitchen.
Sewer SystemWell-laid interconnected sewer lines will be provided which are connected to the sewer line laid by Ghaziabad nagar nigam
DrainDrainage system will be provided on the basis of compliance of NBC with calculation of discharge
ParksSoft landscape will be done in the park with suffiecient electrical lighting.
Tree PlantingTree plantation of the different variable of tree as per the site conditions are planned by follows
Design For Electric Supply Including Street LightingElectrical supply system will be provided according to the electricity load calculation on the data.
Community BuildingsAs per Sanction Plan by Ghaziabad Development Authority
Treatment And Disposal System Of Sewage And Sullage WaterSTP will be installed at basement for treated the Sewer and treated water will be recycled for use in flushing
Solid Waste Management And Disposal SystemWill be done by external vendors by collecting the garbage from the dustbin, shops and segrreggate the same
Water Conservation SystemRain water harvesting pit has plan in the open area for recharge the ground water by collect the rain water
Energy Management System Including Use Of Renewable EnergySolar panel will be installed on the terrace for the conservation of the electricity as per the norms of MOE.
Fire Protection And Fire Safety SystemFire Protection and Fire Safety System System will be provide as per the fire department guidelines.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicable
Emergency Evacuation ServicesEmergency Evacuation Services Separate kre stair case is deigned for evacuation service in the building
Other Miscellaneous WorkAs per the requirement on period of time

Financials

Registration Fee (₹)36000
Project Duration (months)43