BRAJ MURLIWALA RESIDENCY
by Braj Murliwala Residency LLP
Mathura, Uttar Pradesh · UPRERAPRJ356621/07/2025
Total units
136
Overview
Registration Date2025-07-17
RERA NumberUPRERAPRJ356621/07/2025
Promoter IDUPRERAPRM332985
Proposed Start2024-08-09
Proposed Completion2027-08-08
Location
DistrictMathura
TehsilChhata
VillageCHIKSAULI
AddressKHATA NO 02, KHASARA NO 522, MAUJA BANKEY, CHIKSAULI, TEHSIL GOVERDHAN DISTRICT MATHURA
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units136
Unit Types4
Blocks1
Floors7
Khasra records (1)
- 522· Khasra· 6034 m²
Inventory
Apartments (79 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| THEGROUPHOUSINGBUILDING | UGF | 1 BHK | 4 | 56.88 | 1 | — |
| THEGROUPHOUSINGBUILDING | UGF | 1 BHK | 4 | 52.97 | 1 | — |
| THEGROUPHOUSINGBUILDING | UGF | 2 BHK | 2 | 83.92 | 1 | — |
| THEGROUPHOUSINGBUILDING | UGF | 2 BHK | 1 | 86.52 | 1 | — |
| THEGROUPHOUSINGBUILDING | UGF | 2 BHK | 1 | 85.13 | 1 | — |
| THEGROUPHOUSINGBUILDING | UGF | 2 BHK | 1 | 83.64 | 1 | — |
| THEGROUPHOUSINGBUILDING | UGF | 2 BHK | 2 | 85.97 | 1 | — |
| THEGROUPHOUSINGBUILDING | UGF | 2 BHK | 1 | 79.65 | 1 | — |
| THEGROUPHOUSINGBUILDING | UGF | 2 BHK | 2 | 89.96 | 1 | — |
| THEGROUPHOUSINGBUILDING | UGF | 2 BHK | 1 | 89.96 | 1 | — |
| THEGROUPHOUSINGBUILDING | UGF | 2 BHK | 1 | 93.87 | 2 | — |
| THEGROUPHOUSINGBUILDING | UGF | 3 BHK | 1 | 113.2 | 1 | — |
| THEGROUPHOUSINGBUILDING | UGF | 3 BHK | 1 | 105.67 | 1 | — |
| THEGROUPHOUSINGBUILDING | 1 | 1 BHK | 4 | 56.88 | 1 | — |
| THEGROUPHOUSINGBUILDING | 1 | 1 BHK | 4 | 52.97 | 1 | — |
| THEGROUPHOUSINGBUILDING | 1 | 2 BHK | 2 | 83.92 | 1 | — |
| THEGROUPHOUSINGBUILDING | 1 | 2 BHK | 1 | 86.52 | 1 | — |
| THEGROUPHOUSINGBUILDING | 1 | 2 BHK | 1 | 85.13 | 1 | — |
| THEGROUPHOUSINGBUILDING | 1 | 2 BHK | 1 | 83.64 | 1 | — |
| THEGROUPHOUSINGBUILDING | 1 | 2 BHK | 2 | 85.97 | 1 | — |
| THEGROUPHOUSINGBUILDING | 1 | 2 BHK | 1 | 79.65 | 1 | — |
| THEGROUPHOUSINGBUILDING | 1 | 2 BHK | 2 | 89.96 | 1 | — |
| THEGROUPHOUSINGBUILDING | 1 | 2 BHK | 1 | 89.96 | 1 | — |
| THEGROUPHOUSINGBUILDING | 1 | 2 BHK | 1 | 93.87 | 2 | — |
| THEGROUPHOUSINGBUILDING | 1 | 3 BHK | 1 | 113.2 | 1 | — |
| THEGROUPHOUSINGBUILDING | 1 | 3 BHK | 1 | 105.67 | 1 | — |
| THEGROUPHOUSINGBUILDING | 2 | 1 BHK | 4 | 56.88 | 1 | — |
| THEGROUPHOUSINGBUILDING | 2 | 1 BHK | 4 | 52.97 | 1 | — |
| THEGROUPHOUSINGBUILDING | 2 | 2 BHK | 2 | 83.92 | 1 | — |
| THEGROUPHOUSINGBUILDING | 2 | 2 BHK | 1 | 86.52 | 1 | — |
| THEGROUPHOUSINGBUILDING | 2 | 2 BHK | 1 | 85.13 | 1 | — |
| THEGROUPHOUSINGBUILDING | 2 | 2 BHK | 1 | 83.64 | 1 | — |
| THEGROUPHOUSINGBUILDING | 2 | 2 BHK | 2 | 85.97 | 1 | — |
| THEGROUPHOUSINGBUILDING | 2 | 2 BHK | 1 | 79.65 | 1 | — |
| THEGROUPHOUSINGBUILDING | 2 | 2 BHK | 2 | 89.96 | 1 | — |
| THEGROUPHOUSINGBUILDING | 2 | 2 BHK | 1 | 89.96 | 1 | — |
| THEGROUPHOUSINGBUILDING | 2 | 2 BHK | 1 | 93.87 | 2 | — |
| THEGROUPHOUSINGBUILDING | 2 | 3 BHK | 1 | 113.2 | 1 | — |
| THEGROUPHOUSINGBUILDING | 2 | 3 BHK | 1 | 105.67 | 1 | — |
| THEGROUPHOUSINGBUILDING | 3 | 1 BHK | 4 | 56.88 | 1 | — |
| THEGROUPHOUSINGBUILDING | 3 | 1 BHK | 4 | 52.97 | 1 | — |
| THEGROUPHOUSINGBUILDING | 3 | 2 BHK | 2 | 83.92 | 1 | — |
| THEGROUPHOUSINGBUILDING | 3 | 2 BHK | 1 | 86.52 | 1 | — |
| THEGROUPHOUSINGBUILDING | 3 | 2 BHK | 1 | 85.13 | 1 | — |
| THEGROUPHOUSINGBUILDING | 3 | 2 BHK | 1 | 83.64 | 1 | — |
| THEGROUPHOUSINGBUILDING | 3 | 2 BHK | 2 | 85.97 | 1 | — |
| THEGROUPHOUSINGBUILDING | 3 | 2 BHK | 1 | 79.65 | 1 | — |
| THEGROUPHOUSINGBUILDING | 3 | 2 BHK | 2 | 89.96 | 1 | — |
| THEGROUPHOUSINGBUILDING | 3 | 2 BHK | 1 | 89.96 | 1 | — |
| THEGROUPHOUSINGBUILDING | 3 | 2 BHK | 1 | 93.87 | 2 | — |
| THEGROUPHOUSINGBUILDING | 3 | 3 BHK | 1 | 113.2 | 1 | — |
| THEGROUPHOUSINGBUILDING | 3 | 3 BHK | 1 | 105.67 | 1 | — |
| THEGROUPHOUSINGBUILDING | 4 | 1 BHK | 4 | 56.88 | 1 | — |
| THEGROUPHOUSINGBUILDING | 4 | 1 BHK | 4 | 52.97 | 1 | — |
| THEGROUPHOUSINGBUILDING | 4 | 2 BHK | 2 | 83.92 | 1 | — |
| THEGROUPHOUSINGBUILDING | 4 | 2 BHK | 1 | 86.52 | 1 | — |
| THEGROUPHOUSINGBUILDING | 4 | 2 BHK | 1 | 85.13 | 1 | — |
| THEGROUPHOUSINGBUILDING | 4 | 2 BHK | 1 | 83.64 | 1 | — |
| THEGROUPHOUSINGBUILDING | 4 | 2 BHK | 2 | 85.97 | 1 | — |
| THEGROUPHOUSINGBUILDING | 4 | 2 BHK | 1 | 79.65 | 1 | — |
| THEGROUPHOUSINGBUILDING | 4 | 2 BHK | 2 | 89.96 | 1 | — |
| THEGROUPHOUSINGBUILDING | 4 | 2 BHK | 1 | 89.96 | 1 | — |
| THEGROUPHOUSINGBUILDING | 4 | 2 BHK | 1 | 93.87 | 2 | — |
| THEGROUPHOUSINGBUILDING | 4 | 3 BHK | 1 | 113.2 | 1 | — |
| THEGROUPHOUSINGBUILDING | 4 | 3 BHK | 1 | 105.67 | 1 | — |
| THEGROUPHOUSINGBUILDING | 5 | 1 BHK | 4 | 56.88 | 1 | — |
| THEGROUPHOUSINGBUILDING | 5 | 1 BHK | 4 | 52.97 | 1 | — |
| THEGROUPHOUSINGBUILDING | 5 | 2 BHK | 2 | 83.92 | 1 | — |
| THEGROUPHOUSINGBUILDING | 5 | 2 BHK | 1 | 86.52 | 1 | — |
| THEGROUPHOUSINGBUILDING | 5 | 2 BHK | 1 | 85.13 | 1 | — |
| THEGROUPHOUSINGBUILDING | 5 | 2 BHK | 1 | 83.64 | 1 | — |
| THEGROUPHOUSINGBUILDING | 5 | 2 BHK | 2 | 85.97 | 1 | — |
| THEGROUPHOUSINGBUILDING | 5 | 2 BHK | 1 | 79.65 | 1 | — |
| THEGROUPHOUSINGBUILDING | 5 | 2 BHK | 2 | 89.96 | 1 | — |
| THEGROUPHOUSINGBUILDING | 5 | 2 BHK | 1 | 89.96 | 1 | — |
| THEGROUPHOUSINGBUILDING | 5 | 2 BHK | 1 | 93.87 | 2 | — |
| THEGROUPHOUSINGBUILDING | 5 | 3 BHK | 1 | 113.2 | 1 | — |
| THEGROUPHOUSINGBUILDING | 5 | 3 BHK | 1 | 105.67 | 1 | — |
| THEGROUPHOUSINGBUILDING | GF | SHOP | 4 | 18.03 | 0 | — |
Permits & Approvals
Permit No491/NAKSHA/Z.P.M./2023-24
Permit Date2024-08-09
Valid Until2027-08-08
Extendable Until2030-08-08
Documents
Filing documents
- Commencement Certificate
- Proforma of Application Form
- Proforma of Completion Certificate(Occupancy)
- Details of Encumbrances#New(2025-06-30)View
- Commencement Certificate#New(2025-06-11)View
- Other Plan(If Any)#New(2025-06-11)View
- Proforma of Application Form#New(2025-06-25)View
- Proforma of Allotment Letter#New(2025-06-25)View
- Proforma of Conveyance Deed#New(2025-06-25)View
- Waste Disposal Plan#New(2025-06-11)View
- Water Supply Plan#New(2025-06-11)View
- Electricity Supply Plan#New(2025-06-11)View
- Development Work Plan#New(2025-06-11)View
- Affidavit (Form-B)#New(2025-06-18)View
- CA CERTIFICATE#New(2025-06-11)View
- ARCHITECT CERTIFICATE#New(2025-06-11)View
- ENGINEERS CERTIFICATE#New(2025-06-11)View
- Other#New(2025-06-25)View
- Proforma of Agreement for Sale#New(2025-06-25)View
Land documents
- Sale Deed#21022(2021-12-20)View15983973986.pdf
- Sale Deed#21021(2021-12-20)View15983975246.pdf
- Extract of Khatauni#1427-1432(1900-01-01)View15983973737.pdf
- Registry Document#15867(2025-05-29)View15983979752.pdf
- Registry Document#4/53/2025-26(2025-05-16)View15983974409.pdf
- Allotment Letter issued by Competent Authority#Board Resolution of Jatin(2025-05-15)View15983978593.pdf
- Allotment Letter issued by Competent Authority#LLP Agreement(2024-10-24)View15983972944.pdf
- Allotment Letter issued by Competent Authority#LLP Agreement Supplementary(2024-12-05)View15983971069.pdf
Project Team
Architect AddressA-8/7, KRISHNA NAGAR, MATHURA
Engineer AddressA-8/7, KRISHNA NAGAR, MATHURA
Developer & Contact
Developer
Promoter NameBraj Murliwala Residency LLP
Promoter AddressBRAJ MURLIWALA RESIDENCY LLP PLOT No. 00, GURU KRIPA KUNJ, KARHALA ROAD, NAI ABADI, BARSANA, Barsana, Kotwali Chhata, Chhata, Mathura - 281405, Uttar Pradesh, India
Company TypeLimited Liability Partnership (LLP)
Mobile9034749667
Emailbrajmwllp@gmail.com
Registered AddressBRAJ MURLIWALA RESIDENCY LLP PLOT No. 00, GURU KRIPA KUNJ, KARHALA ROAD, NAI ABADI, BARSANA, Barsana, Kotwali Chhata, Chhata, Mathura - 281405, Uttar Pradesh, India
Contractor AddressS-1/23, RUKMANI VIHAR CHOWK, VRINDAVAN, MATHURA-281121
Bank Accounts
Account Typecollection
Account Number50200103949690
Account NameBRAJ MURLIWALA RESIDENCY LLP COLLECTION ACCOUNT FOR BRAJ MURLIWALA RESIDENCY
Bank NameHDFC BANK LIMITED
BranchIOCL TOWNSHIP MATHURA
Branch AddressGROUND FLOOR AA-2, TOWNSHIP CHOWK KRISHNA VIHAR, MATHURA
Branch DistrictMathura
Branch StateSelect
IFSCHDFC0009096
Branch Emailvipul.mehrotraa@hdfcbank.com
Account Typeseparate
Account Number50200103949701
Account NameBRAJ MURLIWALA RESIDENCY LLP SEPARATE ACCOUNT FOR BRAJ MURLIWALA RESIDENCY
Bank NameHDFC BANK LIMITED
BranchIOCL TOWNSHIP MATHURA
Branch AddressGROUND FLOOR AA-2, TOWNSHIP CHOWK, KRISHNA VIHAR MATHURA
Branch DistrictMathura
Branch StateUttar Pradesh
IFSCHDFC0009096
Account Typetransaction
Account Number50200103949740
Account NameBRAJ MURLIWALA RESIDENCY LLP TRANSACTION ACCOUNT FOR BRAJ MURLIWALA RESIDENCY
Bank NameHDFC BANK LIMITED
BranchIOCL TOWNSHIP MATHURA
Branch AddressGROUND FLOOR AA-2, TOWNSHIP CHOWK, KRISHNA VIHAR, N.H.2, IOCL MATHURA
Branch DistrictMathura
Branch StateUttar Pradesh
IFSCHDFC0009096
Development & Facilities
Development works
Demarcation Of PlotsThe project is for constructions of apartments, therefore demarcation of plots is not applicable.
Boundary WallBoundary wall will be made with 2 metres height along with rcc pillars and brickwork with plaster having width of 9 inch.
Road WorkRoad work will be RCC for the movement of vehicles in the vicinity of the project and the parking space floor will be of pavers for different tricolor pavers.
FootpathsThe footpath will having the width of 3 feet of pavers along side the building.
Water Supply Including Drinking Water FacilitiesWater will be carried out of the borewell and accumulated in the underground water tanks which will route to overhead water tanks of the building through motor pump. Overhead water tank will be used to provide water supply to individual flats through water pipelines.
Sewer SystemRCC/PCC sewerage system will be contructed under the ground for the sullage water outflow and which will be connected to the municipal sewer as per the guidelines of the Nagar Nigam.
DrainDrain water will flow through the roadside drainage holes which will connect to the water conservation tank and overflow will connect to municipal line.
Parks868.00 sq meter park area will be developed in the project where at least 20 big trees like ashoka, palm etc will be planted.
Tree Planting20 big trees like Ashoka Tree and Palm Tree and Other fruitful trees will be planted as per the geographical suitability.
Design For Electric Supply Including Street LightingElectrical fittings in the building will be installed with ISO certified good quality material pipes and branded wires likes havell will be used for fiiting, the street lighting facility will be provided through the installation of electric poles of 20 metres height at sufficient distance to provide lighting in the project.
Community BuildingsGym area and community hall work small indoor meeting will be contructed in the basement for the usage of the prospective residents.
Treatment And Disposal System Of Sewage And Sullage WaterSewage and sullage water will be disposed off through the sewer system to be contructed in the project which will be connected with the municipal sewer line as per their updated guidelines.
Solid Waste Management And Disposal SystemSolid waste and garbage disposal will be made through the nigam facility of garbage disposal from project .
Water Conservation SystemWater harvesting tanks for the conservation of rain water will be constructed at sufficient distance and overflow of any will be connected to the municipal line.
Energy Management System Including Use Of Renewable EnergyThe Project street lighting includes the fitting which will be power saving like LED high gloss lights.
Fire Protection And Fire Safety SystemFire Fighting System like pipes, water sprinklers, hose reels will be installed on each floor including the basement which will be used in need. Also the fire fighting water supply requirement will be meet through connecting underground water tank and also from the overhead water tanks.
Social Infrastructure And Other Public Amenities Including Public Health Services4 Commercial shops are proposed on the Ground floor which will be used for the amenities for the end users like for groceries, daily needs, medicines.
Emergency Evacuation ServicesEmergency Evacuation stairs will be constructed for the emergency exit.
Other Miscellaneous WorkThe project consists of 132 flats and 4 shops with gym and hall in basement.
Financials
Registration Fee (₹)35500
Project Duration (months)36