Registered
Total units
106
Overview
Registration Date2026-03-06
RERA NumberUPRERAPRJ520405/03/2026
Promoter IDUPRERAPRM260637
Proposed Start2025-09-01
Proposed Completion2029-03-31
Location
DistrictMathura
TehsilMathura
VillageVRINDAVAN
AddressBRAJ VILAS COLONY, OPPOSITE KAILASH NAGAR AWASIYA YOJNA, MOUZA RAJPUR BANGAR, VRINDAVAN, MATHURA, UTTAR PRADESH - 281121
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units106
Unit Types4
Blocks1
Floors9
Khasra records (1)
- KHASRA NO. 154,155,156,157,159,160,161 AND 164Ka· Khasra· 2286 m²
Inventory
Apartments (107 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| TOWER A | BSMNT | OTHER | 0 | 0 | 0 | — |
| TOWER A | GF | SHOP | 1 | 20.41 | 0 | — |
| TOWER A | 1 | 1 BHK | 1 | 34.08 | 1 | — |
| TOWER A | 1 | 1 BHK | 1 | 34.3 | 1 | — |
| TOWER A | 1 | 1 BHK | 1 | 34.22 | 1 | — |
| TOWER A | 1 | 1 BHK | 1 | 35.15 | 1 | — |
| TOWER A | 1 | 1 BHK | 1 | 35.77 | 1 | — |
| TOWER A | 1 | 1 BHK | 1 | 34.29 | 1 | — |
| TOWER A | 1 | 1 BHK | 1 | 34.17 | 1 | — |
| TOWER A | 1 | 1 BHK | 1 | 34.29 | 1 | — |
| TOWER A | 1 | 1 BHK | 1 | 34.17 | 1 | — |
| TOWER A | 1 | 1 BHK | 1 | 35.2 | 1 | — |
| TOWER A | 1 | 1 BHK | 1 | 39.53 | 1 | — |
| TOWER A | 1 | 2 BHK | 1 | 63.72 | 1 | — |
| TOWER A | 1 | 2 BHK | 1 | 88.83 | 1 | — |
| TOWER A | 1 | 2 BHK | 1 | 62.41 | 1 | — |
| TOWER A | 1 | 2 BHK | 1 | 82.12 | 1 | — |
| TOWER A | 2 | 1 BHK | 1 | 34.08 | 1 | — |
| TOWER A | 2 | 1 BHK | 1 | 34.3 | 1 | — |
| TOWER A | 2 | 1 BHK | 1 | 34.22 | 1 | — |
| TOWER A | 2 | 1 BHK | 1 | 35.15 | 1 | — |
| TOWER A | 2 | 1 BHK | 1 | 35.77 | 1 | — |
| TOWER A | 2 | 1 BHK | 1 | 34.29 | 1 | — |
| TOWER A | 2 | 1 BHK | 1 | 34.17 | 1 | — |
| TOWER A | 2 | 1 BHK | 1 | 34.29 | 1 | — |
| TOWER A | 2 | 1 BHK | 1 | 34.17 | 1 | — |
| TOWER A | 2 | 1 BHK | 1 | 35.2 | 1 | — |
| TOWER A | 2 | 1 BHK | 1 | 39.53 | 1 | — |
| TOWER A | 2 | 2 BHK | 1 | 63.72 | 1 | — |
| TOWER A | 2 | 2 BHK | 1 | 88.83 | 1 | — |
| TOWER A | 2 | 2 BHK | 1 | 62.41 | 1 | — |
| TOWER A | 2 | 2 BHK | 1 | 82.12 | 1 | — |
| TOWER A | 3 | 1 BHK | 1 | 34.08 | 1 | — |
| TOWER A | 3 | 1 BHK | 1 | 34.2 | 1 | — |
| TOWER A | 3 | 1 BHK | 1 | 34.22 | 1 | — |
| TOWER A | 3 | 1 BHK | 1 | 35.15 | 1 | — |
| TOWER A | 3 | 1 BHK | 1 | 35.77 | 1 | — |
| TOWER A | 3 | 1 BHK | 1 | 34.29 | 1 | — |
| TOWER A | 3 | 1 BHK | 1 | 34.17 | 1 | — |
| TOWER A | 3 | 1 BHK | 1 | 34.29 | 1 | — |
| TOWER A | 3 | 1 BHK | 1 | 34.23 | 1 | — |
| TOWER A | 3 | 1 BHK | 1 | 35.2 | 1 | — |
| TOWER A | 3 | 1 BHK | 1 | 39.53 | 1 | — |
| TOWER A | 3 | 2 BHK | 1 | 63.72 | 1 | — |
| TOWER A | 3 | 2 BHK | 1 | 88.83 | 1 | — |
| TOWER A | 3 | 2 BHK | 1 | 62.41 | 1 | — |
| TOWER A | 3 | 2 BHK | 1 | 82.35 | 1 | — |
| TOWER A | 4 | 1 BHK | 1 | 34.08 | 1 | — |
| TOWER A | 4 | 1 BHK | 1 | 34.2 | 1 | — |
| TOWER A | 4 | 1 BHK | 1 | 34.22 | 1 | — |
| TOWER A | 4 | 1 BHK | 1 | 35.15 | 1 | — |
| TOWER A | 4 | 1 BHK | 1 | 35.77 | 1 | — |
| TOWER A | 4 | 1 BHK | 1 | 34.29 | 1 | — |
| TOWER A | 4 | 1 BHK | 1 | 34.17 | 1 | — |
| TOWER A | 4 | 1 BHK | 1 | 34.29 | 1 | — |
| TOWER A | 4 | 1 BHK | 1 | 34.23 | 1 | — |
| TOWER A | 4 | 1 BHK | 1 | 35.2 | 1 | — |
| TOWER A | 4 | 1 BHK | 1 | 39.53 | 1 | — |
| TOWER A | 4 | 2 BHK | 1 | 63.72 | 1 | — |
| TOWER A | 4 | 2 BHK | 1 | 88.83 | 1 | — |
| TOWER A | 4 | 2 BHK | 1 | 62.41 | 1 | — |
| TOWER A | 4 | 2 BHK | 1 | 82.35 | 1 | — |
| TOWER A | 5 | 1 BHK | 1 | 34.08 | 1 | — |
| TOWER A | 5 | 1 BHK | 1 | 34.2 | 1 | — |
| TOWER A | 5 | 1 BHK | 1 | 34.22 | 1 | — |
| TOWER A | 5 | 1 BHK | 1 | 35.15 | 1 | — |
| TOWER A | 5 | 1 BHK | 1 | 35.77 | 1 | — |
| TOWER A | 5 | 1 BHK | 1 | 34.29 | 1 | — |
| TOWER A | 5 | 1 BHK | 1 | 34.17 | 1 | — |
| TOWER A | 5 | 1 BHK | 1 | 34.29 | 1 | — |
| TOWER A | 5 | 1 BHK | 1 | 34.23 | 1 | — |
| TOWER A | 5 | 1 BHK | 1 | 35.2 | 1 | — |
| TOWER A | 5 | 1 BHK | 1 | 39.53 | 1 | — |
| TOWER A | 5 | 2 BHK | 1 | 63.72 | 1 | — |
| TOWER A | 5 | 2 BHK | 1 | 88.83 | 1 | — |
| TOWER A | 5 | 2 BHK | 1 | 62.41 | 1 | — |
| TOWER A | 5 | 2 BHK | 1 | 82.35 | 1 | — |
| TOWER A | 6 | 1 BHK | 1 | 34.08 | 1 | — |
| TOWER A | 6 | 1 BHK | 1 | 34.2 | 1 | — |
| TOWER A | 6 | 1 BHK | 1 | 34.22 | 1 | — |
| TOWER A | 6 | 1 BHK | 1 | 35.15 | 1 | — |
| TOWER A | 6 | 1 BHK | 1 | 35.77 | 1 | — |
| TOWER A | 6 | 1 BHK | 1 | 34.29 | 1 | — |
| TOWER A | 6 | 1 BHK | 1 | 34.17 | 1 | — |
| TOWER A | 6 | 1 BHK | 1 | 34.23 | 1 | — |
| TOWER A | 6 | 1 BHK | 1 | 35.2 | 1 | — |
| TOWER A | 6 | 1 BHK | 1 | 39.53 | 1 | — |
| TOWER A | 6 | 2 BHK | 1 | 63.72 | 1 | — |
| TOWER A | 6 | 2 BHK | 1 | 88.83 | 1 | — |
| TOWER A | 6 | 2 BHK | 1 | 62.41 | 1 | — |
| TOWER A | 6 | 2 BHK | 1 | 82.35 | 1 | — |
| TOWER A | 7 | 1 BHK | 1 | 34.08 | 1 | — |
| TOWER A | 7 | 1 BHK | 1 | 34.2 | 1 | — |
| TOWER A | 7 | 1 BHK | 1 | 34.22 | 1 | — |
| TOWER A | 7 | 1 BHK | 1 | 35.15 | 1 | — |
| TOWER A | 7 | 1 BHK | 1 | 35.77 | 1 | — |
| TOWER A | 7 | 1 BHK | 1 | 34.29 | 1 | — |
| TOWER A | 7 | 1 BHK | 1 | 34.17 | 1 | — |
| TOWER A | 7 | 1 BHK | 1 | 34.29 | 1 | — |
| TOWER A | 7 | 1 BHK | 1 | 34.23 | 1 | — |
| TOWER A | 7 | 1 BHK | 1 | 35.2 | 1 | — |
| TOWER A | 7 | 1 BHK | 1 | 39.53 | 1 | — |
| TOWER A | 7 | 2 BHK | 1 | 63.72 | 1 | — |
| TOWER A | 7 | 2 BHK | 1 | 88.83 | 1 | — |
| TOWER A | 7 | 2 BHK | 1 | 62.41 | 1 | — |
| TOWER A | 7 | 2 BHK | 1 | 82.35 | 1 | — |
| TOWER A | 6 | 1 BHK | 1 | 34.29 | 1 | — |
Permits & Approvals
Permit NoAFFORDABLE HOUSING/07210/MVDA/BP/24-25/0415/06072025
Permit Date2025-09-02
Valid Until2030-10-01
Extendable Until2033-09-01
Documents
Filing documents
- Other Plan(If Any)
- Proforma of Completion Certificate(Occupancy)
- Waste Disposal Plan
- Other
- Details of Encumbrances#New(2026-01-08)View
- Commencement Certificate#New(2025-12-15)View
- Proforma of Application Form#New(2025-12-15)View
- Proforma of Allotment Letter#New(2026-01-08)View
- Proforma of Conveyance Deed#New(2025-12-15)View
- Waste Disposal Plan#New(2026-01-08)View
- Water Supply Plan#New(2026-01-08)View
- Electricity Supply Plan#New(2026-01-08)View
- Development Work Plan#New(2025-12-15)View
- Affidavit (Form-B)#New(2026-01-16)View
- CA CERTIFICATE#New(2026-01-08)View
- ARCHITECT CERTIFICATE#New(2025-12-15)View
- ENGINEERS CERTIFICATE#New(2026-01-24)View
- Other#New(2026-01-16)View
- Proforma of Agreement for Sale#New(2026-01-16)View
Land documents
- Sale Deed#DOCUMENT NUMBER 12025 IN BOOK NO. 1, VOLUME NO. 10687 AT PAGES 3572 TO 370(2021-09-17)View18530803072.pdf
- Extract of Khatauni#1426-1431 (01.07.2018 to 30.06.2024)(1900-01-01)View18530806677.pdf
- Allotment Letter issued by Competent Authority#08.06.2022(2022-06-08)View18530808302.pdf
- Sale Deed#12025(2021-09-17)View18530809041.pdf
- Registry Document#3558(1980-09-08)View18530802358.pdf
- Extract of Khatauni#1426-1431(1900-01-01)View18530802315.pdf
Project Team
Architect AddressA-1006, I-THUM, PLOT NO. A-40, SECTOR-62, NOIDA - 201309
Engineer AddressLANE-7, GHAFFAR MANZIL, JAMIA NAGAR, NEW DELHI - 110025
Developer & Contact
Developer
Promoter NameBrij Sai Buildtech Private limited
Promoter AddressBrij Vilas Colony, Opp. Kailash Nagar Awasiya Yojna Mauja Rajpur Bangar, Vrindavan, Mathura Uttar Pradesh, 281121
Company TypeCompany
Mobile7055000292
EmailLegals@brajvilas.com
Registered AddressBrij Vilas Colony, Opp. Kailash Nagar Awasiya Yojna Mauja Rajpur Bangar, Vrindavan, Mathura Uttar Pradesh, 281121
Contractor AddressA-1006, I-THUM, PLOT NO. A-40, SECTOR-62, NOIDA - 201309
Bank Accounts
Account Typecollection
Account Number027405007574
Account NameM/S BRIJ SAI BUILDTECH PRIVATE LIMITED COLLECTION ACCOUNT FOR BRAJ VILAS
Bank NameICICI BANK
BranchMATHURA
Branch Address217/360, KESOPUR, BHUTESHWAR ROAD, MATHURA, UTTAR PRADESH - 281004
Branch DistrictMathura
Branch StateUttar Pradesh
IFSCICIC0000274
Branch Emailanupriya.anupriya1@icicibank.com
Account Typeseparate
Account Number027405007575
Account NameM/S BRIJ SAI BUILDTECH PRIVATE LIMITED SEPARATE ACCOUNT FOR BRAJ VILAS
Bank NameICICI BANK
BranchMATHURA
Branch Address217/360 , KESOPUR, BHUTESHWAR ROAD, MATHURA, UTTAR PRADESH - 281004
Branch DistrictMathura
Branch StateUttar Pradesh
IFSCICIC0000274
Account Typetransaction
Account Number027405007573
Account NameM/S BRIJ SAI BUILDTECH PRIVATE LIMITED RERA TRANSACTION ACCOUNT FOR BRAJ VILAS
Bank NameICICI BANK
BranchMATHURA
Branch Address217/360 , KESOPUR, BHUTESHWAR ROAD, MATHURA, UTTAR PRADESH - 281004
Branch DistrictMathura
Branch StateUttar Pradesh
IFSCICIC0000274
Development & Facilities
Development works
Demarcation Of PlotsCovered Boundary walls. Plot demarcated upto plinth level of 0.9 meter and in observation of technical person.
Boundary WallR.C.C Column, beam and traditional bricks as per drawings. Boundary in bricks upto 1.2 meter with MS or terracotta jaali upto 2.125 meter from plinth level.
Road WorkCement concrete road/interlocking pavers. 6 meter wide and 165 meter in length internal road of cement and concrete and reinforcement with ratio of 1-1.5-3 (cement, sand and aggregate).
FootpathsInterlocking pavers and stone pavers. 1.5 meter pathway in 6 meter wide road in cement stamping or in stone cobbels.
Water Supply Including Drinking Water FacilitiesGround water discharge/Municiple water supply with chlorine dozer. Water intake from borewell and from municipal supply line which further stored in underground tanks of fire and domestic. Store water further supply to overhead tanks for daily supply to all flats. Total water required for UGT is 52 KL.
Sewer SystemSoil waste pipe and waste water lay separately in tower. Connected to manhole through hanging line in basement. The length of the main line is 165 meter.
DrainSeparate drain pipes for terrace and internal roads for rain water harvesting pits. The length of the main storm water line is 165 meter.
ParksNo park facility in project.
Tree PlantingNative trees for plantation as per requirements for building bye laws. 30 native trees of Alstonia scholaris, silver oak tree, Ficus infectoria and Delonix Regia.
Design For Electric Supply Including Street LightingElectric substation for H.T. to low tension power supply which is further connected to DG set for power backup. Two transformer of 315 kva and 250 kva. DG set of 500 kva.
Community BuildingsNo community buildings requirement as per MVDA.
Treatment And Disposal System Of Sewage And Sullage WaterSewer line connected to municiple main line for treatment. 50 KLD sewage treatment plan.
Solid Waste Management And Disposal SystemDoor to door collection and further it will be stored in garbage collection room on ground and then disposed through municipal vehicle. 15 sq. mt. garbage accumulation room on stilt floor.
Water Conservation SystemRain water harvesting pits for water conservation. 50 KLD sewage treatment plan to treat waste water to use in flushing.
Energy Management System Including Use Of Renewable EnergyDoor to door segregation, common DG to save energy in Emergency, Reflectors for signages.
Fire Protection And Fire Safety SystemFire hose case/reel on each floor with wet riser connected to overhead the underground water tanks.
Social Infrastructure And Other Public Amenities Including Public Health ServicesGymnasium and indoor games on stilt floor.
Emergency Evacuation ServicesFire alarm system and separate stairs for emergency evacuation through ground or terrace.
Other Miscellaneous WorkN/A
Financials
Registration Fee (₹)16500
Project Duration (months)43