CADENZA RESIDENCES
by MAIN STREET CONSTRUCTIONS PRIVATE LIMITED
Meerut, Uttar Pradesh · UPRERAPRJ114955/03/2026
Total units
151
Overview
Registration Date2026-03-20
RERA NumberUPRERAPRJ114955/03/2026
Promoter IDUPRERAPRM424469
Proposed Start2026-01-15
Proposed Completion2030-12-05
Location
DistrictMeerut
TehsilMeerut
VillageNoor Nagar
AddressKhasra No. 108A, 108B, 111,112 , Village Noor Nagar, Bijli Bamba Bypass Road, Meerut, U.P , 250002
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units151
Unit Types4
Blocks3
Floors12
Khasra records (8)
Show all 8 khasra rows
- 108A AND 108B· Khasra· 23366 m²
- 108A and 108B· Khasra· 6380 m²
- 108A AND 108B· Khasra· 23366 m²
- 108A AND 108B· Khasra· 23366 m²
- 111· Khasra· 135 m²
- 111· Khasra· 10035 m²
- 111· Khasra· 10035 m²
- 112· Khasra· 285 m²
Inventory
Apartments (60 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| A | 1 | 4 BHK | 4 | 146.38 | 4 | — |
| A | 1 | 4 BHK | 1 | 228.95 | 4 | — |
| A | 2 | 4 BHK | 4 | 146.38 | 4 | — |
| A | 2 | 4 BHK | 2 | 228.95 | 4 | — |
| A | 3 | 4 BHK | 4 | 146.38 | 4 | — |
| A | 3 | 4 BHK | 2 | 228.95 | 4 | — |
| A | 4 | 4 BHK | 4 | 146.38 | 4 | — |
| A | 4 | 4 BHK | 2 | 228.95 | 4 | — |
| A | 5 | 4 BHK | 4 | 146.38 | 4 | — |
| A | 5 | 4 BHK | 2 | 228.95 | 4 | — |
| A | 6 | 4 BHK | 4 | 146.38 | 4 | — |
| A | 6 | 4 BHK | 2 | 228.95 | 4 | — |
| A | 7 | 4 BHK | 4 | 146.38 | 4 | — |
| A | 7 | 4 BHK | 2 | 228.95 | 4 | — |
| A | 8 | 4 BHK | 4 | 146.38 | 4 | — |
| A | 8 | 4 BHK | 2 | 228.95 | 4 | — |
| A | 9 | 4 BHK | 4 | 146.38 | 4 | — |
| A | 9 | 4 BHK | 2 | 228.95 | 4 | — |
| A | 10 | 4 BHK | 4 | 146.38 | 4 | — |
| A | 10 | 4 BHK | 2 | 228.95 | 4 | — |
| A | 11 | 4 BHK | 4 | 146.38 | 4 | — |
| A | 11 | 4 BHK | 2 | 228.95 | 4 | — |
| A | 12 | 4 BHK | 4 | 146.38 | 4 | — |
| A | 12 | 4 BHK | 2 | 228.95 | 4 | — |
| B | 1 | 4 BHK | 3 | 146.38 | 4 | — |
| B | 1 | 4 BHK | 1 | 228.95 | 4 | — |
| B | 2 | 4 BHK | 4 | 146.38 | 4 | — |
| B | 2 | 4 BHK | 2 | 228.95 | 4 | — |
| B | 3 | 4 BHK | 4 | 146.38 | 4 | — |
| B | 3 | 4 BHK | 2 | 228.95 | 4 | — |
| B | 4 | 4 BHK | 4 | 146.38 | 4 | — |
| B | 4 | 4 BHK | 2 | 228.95 | 4 | — |
| B | 5 | 4 BHK | 4 | 146.38 | 4 | — |
| B | 5 | 4 BHK | 2 | 228.95 | 4 | — |
| B | 6 | 4 BHK | 4 | 146.38 | 4 | — |
| B | 6 | 4 BHK | 2 | 228.95 | 4 | — |
| B | 7 | 4 BHK | 4 | 146.38 | 4 | — |
| B | 7 | 4 BHK | 2 | 228.95 | 4 | — |
| B | 8 | 4 BHK | 4 | 146.38 | 4 | — |
| B | 8 | 4 BHK | 2 | 228.95 | 4 | — |
| B | 9 | 4 BHK | 4 | 146.38 | 4 | — |
| B | 9 | 4 BHK | 2 | 228.95 | 4 | — |
| B | 10 | 4 BHK | 4 | 146.38 | 4 | — |
| B | 10 | 4 BHK | 2 | 228.95 | 4 | — |
| B | 11 | 4 BHK | 4 | 146.38 | 4 | — |
| B | 11 | 4 BHK | 2 | 228.95 | 4 | — |
| B | 12 | 4 BHK | 4 | 146.38 | 4 | — |
| B | 12 | 4 BHK | 2 | 228.95 | 4 | — |
| C | GF | SHOP | 1 | 182.41 | 0 | — |
| C | GF | SHOP | 1 | 123.02 | 0 | — |
| C | GF | SHOP | 1 | 140.71 | 0 | — |
| C | GF | SHOP | 1 | 117.02 | 0 | — |
| C | 1 | SHOP | 0 | 0 | 0 | — |
| C | 2 | SHOP | 0 | 0 | 0 | — |
| C | 3 | 5 BHK | 1 | 350.43 | 4 | — |
| C | 4 | 5 BHK | 1 | 350.43 | 4 | — |
| C | 5 | 5 BHK | 1 | 350.43 | 4 | — |
| C | 6 | 5 BHK | 1 | 350.43 | 4 | — |
| C | 7 | 5 BHK | 1 | 350.43 | 4 | — |
| C | 8 | 3 BHK | 1 | 231.43 | 1 | — |
Permits & Approvals
Permit NoGroup Housing/08706/MDA/BP/25-26/0631/05122025
Permit Date2025-12-06
Valid Until2030-12-05
Extendable Until2033-12-05
Documents
Filing documents
- Commencement Certificate
- Other Plan(If Any)
- Proforma of Completion Certificate(Occupancy)
- Other
- Details of Encumbrances#New(2026-01-07)View
- Commencement Certificate#New(2026-03-06)View
- Other Plan(If Any)#New(2026-03-06)View
- Proforma of Application Form#New(2026-01-07)View
- Proforma of Allotment Letter#New(2026-01-07)View
- Proforma of Conveyance Deed#New(2026-01-07)View
- Waste Disposal Plan#New(2026-03-06)View
- Water Supply Plan#New(2026-03-06)View
- Electricity Supply Plan#New(2026-03-06)View
- Development Work Plan#New(2026-03-06)View
- Affidavit (Form-B)#New(2026-03-06)View
- CA CERTIFICATE#New(2026-03-06)View
- ARCHITECT CERTIFICATE#New(2026-01-08)View
- ENGINEERS CERTIFICATE#New(2026-01-07)View
- Other#New(2026-03-06)View
- Proforma of Agreement for Sale#New(2026-03-06)View
Land documents
- Sale Deed#Bahi 1, Jild 16350, Page No. 103 - 120, Serial No. 3076(2023-03-13)View18568115796.pdf
- Sale Deed#Bahi 1, Jild No. -9687, Page No. 179 to 198, Serial No. 5966(2014-05-26)View18568117458.pdf
- Sale Deed#Bahi 1, Jild No. 16449, Page No. 189 to 206, Serial No. 6181(2023-05-15)View18568115699.pdf
- Sale Deed#Bahi 1, Jild 16489, Page No. 251 to 268, Serial No. 7401(2023-06-05)View18568119510.pdf
- Extract of Khatauni#1427- 1432, 1st July 2019 to 30th June 2025(1900-01-01)View18568118869.pdf
- Extract of Khatauni#1427 - 1432, 1st July 2019 to 30th June 2025(1900-01-01)View18568118742.pdf
- Sale Deed#Bahi 1, Jild No. 9687, Page No. 223 to 244, Serial No. 5986(2014-05-26)View18568113714.pdf
- Sale Deed#Bahi 1, Jild No. 17776, Page No. 223 to 340, Serial No. 6429(2025-04-28)View18568113875.pdf
- Sale Deed#Bahi 1, Jild No. 9687, Page no. 261 - 286, Serial No. 5970(2025-05-26)View18568116898.pdf
- Extract of Khatauni#1427-1432, 1st July 2019 to 30th June 2025(1900-01-01)View18568116279.pdf
- Sale Deed#Bahi 1, Jild No. 9687, Page No. 287 to 306, Serial No. 5971(2014-05-26)View18568111980.pdf
- Extract of Khatauni#1427-1432, 1st July 2019 to 30th June 2025(1900-01-01)View18568111255.pdf
- Extract of Khatauni#1427-1432 (01 July 2019 - 30 June 2025) Khasra - 112(1900-01-01)View18568111338.pdf
Project Team
Architect AddressConfluence consultancy services, F-1, Mira Corporate Suites, Ishwar Nagar, Friends Colony West, New Delhi - 110065
Engineer AddressOptimum Design, B - 24, Sec -67, Noida, UP
Developer & Contact
Developer
Promoter NameMAIN STREET CONSTRUCTIONS PRIVATE LIMITED
Promoter AddressC 71, MEJAR DHYAN CHAND NAGAR, Meerut City, Meerut, Meerut, Uttar Pradesh, India, 250002
Company TypeCompany
Mobile9837044078
EmailMainstreetmeerut@gmail.com
Registered AddressC 71, MEJAR DHYAN CHAND NAGAR, Meerut City, Meerut, Meerut, Uttar Pradesh, India, 250002
Contractor AddressC 71, Major Dhyan Chand Nagar, Meerut, UP, 250002
Bank Accounts
Account Typecollection
Account Number2159002900000059
Account NameMAIN STREET CONSTRUCTIONS PVT LTD COLLECTION ACC FOR CADENZA RESIDENCES
Bank NamePNB
BranchSPORTS COMPLEX MEERUT
Branch AddressSPORTS COMPLEX DELHI ROAD MEERUT
Branch DistrictMeerut
Branch StateUttar Pradesh
IFSCPUNB0215900
Branch EmailBO2159@pnb.bank.in
Account Typeseparate
Account Number2159002191013207
Account NameMAIN STREET CONSTRUCTIONS PVT LTD SEPARATE ACC FOR CADENZA RESIDENCES
Bank NamePNB
BranchSPORTS COMPLEX MEERUT
Branch AddressSPORTS COMPLEX DELHI ROAD MEERUT
Branch DistrictMeerut
Branch StateUttar Pradesh
IFSCPUNB0215900
Account Typetransaction
Account Number2159002900000040
Account NameMAIN STREET CONSTRUCTIONS PVT LTD TRANSACTION ACC FOR CADENZA RESIDENCES
Bank NamePNB
BranchSPORTS COMPLEX MEERUT
Branch AddressSPORTS COMPLEX DELHI ROAD MEERUT
Branch DistrictMeerut
Branch StateUttar Pradesh
IFSCPUNB0215900
Development & Facilities
Development works
Demarcation Of PlotsKhasra no. 108A, 108B, 111, 112, Noor Nagar, Bijli Bamba Bypass Road, Meerut, U.P. Total Plot Area = 15816.8 sq.mt
Boundary Wall2.1 m high boundary wall with 1.8m high brick work and 0.60m high mild steel grill between two R.C.C. columns approx. 4.5m centre to centre
Road WorkAll roads in the complex will be in M25 grade concrete. Roads will be laid over two layers of 150mm thick compacted water bound macadam.
FootpathsAll footpaths in the complex will in combination of concrete pavers of different colours, shape and thickness of 65m laid over 150mm water bound macadam 100 mm thick PCC surface.
Water Supply Including Drinking Water FacilitiesPotable water supply from GDA shall be collected in underground collection tank 350KLD and pumped to overhead water tank located at the terrace. The supply of water to individual flats shall be from the said overhead water tanks. Underground and overhead water tank with automatic pumps for 24 hours water supply.
Sewer SystemThe sewage will be collected through a soil pipeline 200 mm dia arrangement, bends and inspection chambers leading to the sewage water treatment plant 750KLD (STP) of the project, from where the treated water will be used for irrigation and flushing purpose.
DrainRainwater shall be collected in drains having a minimum width of 150mm connected to the underground cement concrete pipeline. For discharge, water will be collected in manholes to be constructed in periphery of complex. and these manholes shall be finally collected with drain of MDA.
ParksLush green landscaped internal park will be provided and maintained. The landscaped parks will have Jogging tracks, Pavilion, Children play area and sitting areas.
Tree PlantingThe trees (80 NOS.) will be planted at all suitable locations for of the project and along the boundary walls (50 Trees / Hectare). the tree selection, flora and vegetation shall be as per the climatic conditions. Trees will be planted in a manner to ensure that there is no hinderance in the service/usage in the Project.
Design For Electric Supply Including Street LightingElectric supply provided through transformers 2nos. 1000KVA CSS for residential and 1no. 1000 KVA CSS for common service and by DG Set supply for backup 1 no. 1010 KVA , 1 no. 500 KVA and 1 no. 380 KVA DG SET. External street lighting shall be through solar power with alternate supply through grid.
Community BuildingsCommunity building ( 2492.60 sqm) is provided between two towers (G+1)
Treatment And Disposal System Of Sewage And Sullage WaterSewage shall be treated in Sewage Treatment Plant (STP) 750 KLD and thereafter treated water to be used for flushing and irrigation.
Solid Waste Management And Disposal SystemSolid waste to be collected from individual flats and stored in garbage room in the complex. Recyclable shall be processed in the compost machine to make compost. Non-recyclable waste shall be disposed of through approved agents of MDA.
Water Conservation SystemRainwater harvesting pits shall be provided for ground water recharging and overflow to be discharges in the municipal drains. Treated sewage shall be used for irrigation and flushing.
Energy Management System Including Use Of Renewable EnergyThe main power supply will be through HT power connection, stepped down by transformer and then distributed. DG backup of suitable rating will be provided. The campus lighting will be a combination of solar lights and grid supplied power. The light fittings will be power saving LED fittings.
Fire Protection And Fire Safety SystemFire fighting system shall be provided for all building as per the prevailing requirements of National Building Code. Sprinklers shall be provided in all basement. Fire doors shall be provided in common areas. Water supply to sprinklers and hydrants shall be from fire pumps located in the basement. Fire tank capacity of 570KLD
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot applicable
Emergency Evacuation ServicesFire staircases shall be provided as per the approved fire drawings for evacuation to open areas.
Other Miscellaneous WorkNot applicable
Financials
Registration Fee (₹)84500
Project Duration (months)59