Registered
Total units
593
Overview
Registration Date2019-11-30
RERA NumberUPRERAPRJ112333
Promoter IDUPRERAPRM97013
Proposed Start2019-10-31
Proposed Completion2024-08-20
Location
DistrictJhansi
TehsilJhansi
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units593
Unit Types5
Blocks4
Floors13
Khasra records (1)
- 2/3/2· Khasra· 2799393 m²
Inventory
Apartments (89 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| A | GF | OTHER | 0 | 0 | 0 | 0 |
| A | 1 | 2 BHK | 11 | 66.64 | 3 | 0 |
| A | 2 | 2 BHK | 11 | 66.64 | 3 | 0 |
| A | 3 | 2 BHK | 11 | 66.64 | 3 | 0 |
| A | 4 | 2 BHK | 11 | 66.64 | 3 | 0 |
| A | 5 | 2 BHK | 11 | 66.64 | 3 | 0 |
| A | 6 | 2 BHK | 11 | 66.64 | 3 | 0 |
| A | 7 | 2 BHK | 11 | 66.64 | 3 | 0 |
| A | 8 | 2 BHK | 11 | 66.64 | 3 | 0 |
| A | 9 | 2 BHK | 11 | 66.64 | 3 | 0 |
| A | 10 | 2 BHK | 11 | 66.64 | 3 | 0 |
| A | 11 | 2 BHK | 11 | 66.64 | 3 | 0 |
| A | 12 | 2 BHK | 11 | 66.64 | 3 | 0 |
| A | 1 | 3 BHK | 5 | 93.26 | 4 | 0 |
| A | 2 | 3 BHK | 5 | 93.26 | 4 | 0 |
| A | 3 | 3 BHK | 5 | 93.26 | 4 | 0 |
| A | 4 | 3 BHK | 5 | 93.26 | 4 | 0 |
| A | 5 | 3 BHK | 5 | 93.26 | 4 | 0 |
| A | 6 | 3 BHK | 5 | 93.26 | 4 | 0 |
| A | 7 | 3 BHK | 5 | 93.26 | 4 | 0 |
| A | 8 | 3 BHK | 5 | 93.26 | 4 | 0 |
| A | 9 | 3 BHK | 5 | 93.26 | 4 | 0 |
| A | 10 | 3 BHK | 5 | 93.26 | 4 | 0 |
| A | 11 | 3 BHK | 5 | 93.26 | 4 | 0 |
| A | 12 | 3 BHK | 5 | 93.26 | 4 | 0 |
| A | 1 | 3 BHK | 4 | 112.49 | 4 | 0 |
| A | 2 | 3 BHK | 4 | 112.49 | 4 | 0 |
| A | 3 | 3 BHK | 4 | 112.49 | 4 | 0 |
| A | 4 | 3 BHK | 4 | 112.49 | 4 | 0 |
| A | 5 | 3 BHK | 4 | 112.49 | 4 | 0 |
| A | 6 | 3 BHK | 4 | 112.49 | 4 | 0 |
| A | 7 | 3 BHK | 4 | 112.49 | 4 | 0 |
| A | 8 | 3 BHK | 4 | 112.49 | 4 | 0 |
| A | 9 | 3 BHK | 4 | 112.49 | 4 | 0 |
| A | 10 | 3 BHK | 4 | 112.49 | 4 | 0 |
| A | 11 | 3 BHK | 4 | 112.49 | 4 | 0 |
| A | 12 | 3 BHK | 4 | 112.49 | 4 | 0 |
| B | GF | OTHER | 0 | 0 | 0 | 0 |
| B | 1 | 2 BHK | 6 | 66.64 | 3 | 0 |
| B | 2 | 2 BHK | 6 | 66.64 | 3 | 0 |
| B | 3 | 2 BHK | 6 | 66.64 | 3 | 0 |
| B | 4 | 2 BHK | 6 | 66.64 | 3 | 0 |
| B | 5 | 2 BHK | 6 | 66.64 | 3 | 0 |
| B | 6 | 2 BHK | 6 | 66.64 | 3 | 0 |
| B | 7 | 2 BHK | 6 | 66.64 | 3 | 0 |
| B | 8 | 2 BHK | 6 | 66.64 | 3 | 0 |
| B | 9 | 2 BHK | 6 | 66.64 | 3 | 0 |
| B | 10 | 2 BHK | 6 | 66.64 | 3 | 0 |
| B | 11 | 2 BHK | 6 | 66.64 | 3 | 0 |
| B | 12 | 2 BHK | 6 | 66.64 | 3 | 0 |
| B | 1 | 3 BHK | 7 | 93.26 | 4 | 0 |
| B | 2 | 3 BHK | 7 | 93.26 | 4 | 0 |
| B | 3 | 3 BHK | 7 | 93.26 | 4 | 0 |
| B | 4 | 3 BHK | 7 | 93.26 | 4 | 0 |
| B | 5 | 3 BHK | 7 | 93.26 | 4 | 0 |
| B | 6 | 3 BHK | 7 | 93.26 | 4 | 0 |
| B | 7 | 3 BHK | 7 | 93.26 | 4 | 0 |
| B | 8 | 3 BHK | 7 | 93.26 | 4 | 0 |
| B | 9 | 3 BHK | 7 | 93.26 | 4 | 0 |
| B | 10 | 3 BHK | 7 | 93.26 | 4 | 0 |
| B | 11 | 3 BHK | 7 | 93.26 | 4 | 0 |
| B | 12 | 3 BHK | 7 | 93.26 | 4 | 0 |
| B | 1 | 3 BHK | 8 | 112.49 | 4 | 0 |
| B | 2 | 3 BHK | 8 | 112.49 | 4 | 0 |
| B | 3 | 3 BHK | 8 | 112.49 | 4 | 0 |
| B | 4 | 3 BHK | 8 | 112.49 | 4 | 0 |
| B | 5 | 3 BHK | 8 | 112.49 | 4 | 0 |
| B | 6 | 3 BHK | 8 | 112.49 | 4 | 0 |
| B | 7 | 3 BHK | 8 | 112.49 | 4 | 0 |
| B | 8 | 3 BHK | 8 | 112.49 | 4 | 0 |
| B | 9 | 3 BHK | 8 | 112.49 | 4 | 0 |
| B | 10 | 3 BHK | 8 | 112.49 | 4 | 0 |
| B | 11 | 3 BHK | 8 | 112.49 | 4 | 0 |
| B | 12 | 3 BHK | 8 | 112.49 | 4 | 0 |
| C | GF | OTHER | 0 | 0 | 0 | 0 |
| C | 1 | 1 BHK | 10 | 26 | 1 | 0 |
| C | 2 | 1 BHK | 10 | 26 | 1 | 0 |
| C | 3 | 1 BHK | 10 | 26 | 1 | 0 |
| C | 4 | 1 BHK | 10 | 26 | 1 | 0 |
| C | 5 | 1 BHK | 10 | 26 | 1 | 0 |
| C | 6 | OTHER | 0 | 0 | 0 | 0 |
| C | GF | OTHER | 0 | 0 | 0 | 0 |
| C | 1 | 1 BHK | 9 | 37 | 1 | 0 |
| C | 2 | 1 BHK | 9 | 37 | 1 | 0 |
| C | 3 | 1 BHK | 9 | 37 | 1 | 0 |
| C | 4 | 1 BHK | 9 | 37 | 1 | 0 |
| C | 5 | 1 BHK | 9 | 37 | 1 | 0 |
| C | 6 | 1 BHK | 5 | 37 | 1 | 0 |
| SHOP | GF | SHOP | 1 | 795 | 0 | 0 |
Permits & Approvals
Permit NoMAP20181214144908413
Permit Date2019-08-21
Valid Until2024-08-20
Extendable Until2024-08-20
Documents
Filing documents
- Proforma of Completion Certificate(Occupancy)
- CA CERTIFICATE
- Details of Encumbrances#New(2019-11-09)View
- Commencement Certificate#New(2019-09-14)View
- Other Plan(If Any)#New(2019-10-25)View
- Proforma of Application Form#New(2019-09-19)View
- Proforma of Allotment Letter#New(2019-11-09)View
- Proforma of Conveyance Deed#New(2019-09-19)View
- Waste Disposal Plan#New(2019-11-09)View
- Water Supply Plan#New(2019-11-09)View
- Electricity Supply Plan#New(2019-11-09)View
- Development Work Plan#New(2019-11-09)View
- Affidavit (Form-B)#New(2019-11-09)View
- ARCHITECT CERTIFICATE#New(2019-11-09)View
- ENGINEERS CERTIFICATE#New(2019-11-09)View
Project Team
Architect AddressNW 52, soamibagh agra
Engineer AddressNW 52, soamibagh agra
Developer & Contact
Developer
Promoter NameAZAD AHMAD KHAN
Promoter Address315 CHAMAN GANJ SIPRI BAZAR JHANSI
Company TypeIndividual
Mobile9236611111
Emailcentralparkdevelopers@gmail.com
Registered Address315 CHAMAN GANJ SIPRI BAZAR JHANSI
Contractor AddressS 70, Sangam vihar near awas vikas near fauji chauraha, jhansi
Development & Facilities
Development works
Demarcation Of PlotsNA
Boundary WallBoundry wall at site will be made of fly ash / clay bricks with column and beam structure. The height of the boundry wall will be 6 feet. Plaster will be done on both side of the boundry wall after that two coat of paints will be coated.
Road WorkConcrete / apex roads will be made at site. The base of the road will be filled with red moram, after that two layers of aggregate 40mm will be laid to make sure that the base of the road is upto the mark, after this the top layer will be of coloured and black and white apex. Road will be 9mtr. to 12mtr. wide.
FootpathsFootpaths will be made by interlocking type b concrete block pavers with a minimum path width of 1.5 mtr and thickness of 80mm.
Water Supply Including Drinking Water FacilitiesFor Water Supply we have a provision of boring water as well as govt water supply from jal nigam. Water supply Provision will be provided via system of pumps and pipes. Water will get stored in underground tanks and from there water will get supplied to overhead tanks. Each block contains overhead tanks from where the water will get supllied to the units and common areas. This water is used for drinking and daily use purposes.
Sewer SystemSewage treatment plant will be constructed at site, all water drains and waste drain will come and connect in this Sewage treatment plant. This sewage treatment plant will filter the water and that will be reused for plantation.
DrainDrain will be made below the foothpaths with chambers at 10mtr distance.Drains will be made with brick work and PVC pipes of different dia. the water from flats will come through pvc pipes in this drains and a proper slope will be maintained till STP plant. The water will get collected through drains in STP plant.There will be seperate drain for each tower.
ParksTotal Number of Parks provided is 3 nos, 1st park is located at the entry gate 2nd park is located in the center of Tower A and .3rd park is located at the center of Tower B. These park can be used as childrens play area, jogging, sitout space etc.
Tree Plantingwe will plant 1000 trees all over the campus and in the garden as well
Design For Electric Supply Including Street LightingIron poles with street lights will be placed all over the campus and proper electrification with transformers and wires will be done as shown in the layout. Electrification will be done in all flats also with ISI mark wires,modular switches with proper earthing arrangements.
Community BuildingsNA
Treatment And Disposal System Of Sewage And Sullage WaterSewage treatment plant will be constructed at site, all water drains and waste drain will come and connect in this Sewage treatment plant. This sewage treatment plant will filter the water and that will be reused for plantation. .
Solid Waste Management And Disposal SystemNA
Water Conservation Systemwater conservation system will be provided on site in this we will make bore in different point in the gardens as well as in the common areas. in this we store rain water below the land and stock that water to flush out from drains at the time of rainy seasons.
Energy Management System Including Use Of Renewable EnergyNA
Fire Protection And Fire Safety Systemas per fire fighting norms we have provided all fire fighting measures and safety features as such as fire fighting systems, smoke extraction, fire alarms , sprinklers, hosereels, fire extinguishers, heat detection systems,call points , electrical pumps generators, diesel pumps, jockey pumps, overhead tanks with required capacity, underground tanks with required capacity and other amenities as per norms.
Social Infrastructure And Other Public Amenities Including Public Health Servicesproviding toddlers park, childrens play station, sitout areas, jogging tracks, lush green gardens commercial complex for daily needs and services, car wash area , power backups etc.
Emergency Evacuation ServicesEmergency Evacuation Services is provided. in this main stair, fire stairs, refuse area, emergency exits is provided at each floor of the building
Other Miscellaneous Work8 lifts is provided in the building. Boom Barriers at main entry gate , CCTV cameras all over the campus, seperate car parking space.
Financials
Registration Fee (₹)119000
Project Duration (months)82