Registered
Total units
186
Overview
Registration Date2024-08-01
RERA NumberUPRERAPRJ859361/08/2024
Promoter IDUPRERAPRM9344
Proposed Start2024-05-01
Proposed Completion2029-03-21
Location
DistrictPrayagraj
TehsilAllahabad
VillageCLIVE ROAD
LocalityMEHTA KNETRA CHKITSHALAY MARG
AddressFREEHOLD PLOT NO 115A(22) CIVIL STATION
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units186
Unit Types3
Blocks1
Floors16
Khasra records (1)
- 115A· Khasra· 629081 m²
Inventory
Apartments (80 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| 1 | BSMNT | OTHER | 0 | 0 | 0 | — |
| 1 | GF | OTHER | 0 | 0 | 0 | — |
| 1 | 1 | OTHER | 0 | 0 | 0 | — |
| 1 | 2 | 2 BHK | 4 | 74.94 | 2 | — |
| 1 | 2 | 2 BHK | 1 | 75 | 2 | — |
| 1 | 2 | 2 BHK | 1 | 69.64 | 3 | — |
| 1 | 2 | 2 BHK | 1 | 68.71 | 3 | — |
| 1 | 2 | 3 BHK | 5 | 89.43 | 2 | — |
| 1 | 3 | 2 BHK | 1 | 75 | 2 | — |
| 1 | 3 | 2 BHK | 2 | 71.5 | 3 | — |
| 1 | 3 | 2 BHK | 1 | 69.64 | 3 | — |
| 1 | 3 | 2 BHK | 1 | 68.71 | 3 | — |
| 1 | 3 | 3 BHK | 5 | 89.43 | 2 | — |
| 1 | 4 | 2 BHK | 4 | 74.94 | 2 | — |
| 1 | 4 | 2 BHK | 1 | 75 | 2 | — |
| 1 | 4 | 2 BHK | 2 | 71.5 | 3 | — |
| 1 | 4 | 2 BHK | 1 | 69.64 | 3 | — |
| 1 | 4 | 2 BHK | 1 | 68.71 | 3 | — |
| 1 | 4 | 3 BHK | 5 | 89.43 | 2 | — |
| 1 | 4 | 3 BHK | 2 | 89.88 | 2 | — |
| 1 | 5 | 2 BHK | 4 | 74.94 | 2 | — |
| 1 | 5 | 2 BHK | 1 | 75 | 2 | — |
| 1 | 5 | 2 BHK | 2 | 71.5 | 3 | — |
| 1 | 5 | 2 BHK | 1 | 69.64 | 3 | — |
| 1 | 5 | 2 BHK | 1 | 68.71 | 3 | — |
| 1 | 5 | 3 BHK | 5 | 89.43 | 2 | — |
| 1 | 5 | 3 BHK | 2 | 89.88 | 2 | — |
| 1 | 6 | 2 BHK | 4 | 74.94 | 2 | — |
| 1 | 6 | 2 BHK | 1 | 75 | 2 | — |
| 1 | 6 | 2 BHK | 2 | 71.5 | 3 | — |
| 1 | 6 | 2 BHK | 1 | 69.64 | 3 | — |
| 1 | 6 | 2 BHK | 1 | 68.71 | 3 | — |
| 1 | 6 | 3 BHK | 5 | 89.43 | 2 | — |
| 1 | 6 | 3 BHK | 2 | 89.88 | 2 | — |
| 1 | 7 | 2 BHK | 4 | 74.94 | 2 | — |
| 1 | 7 | 2 BHK | 1 | 75 | 2 | — |
| 1 | 7 | 2 BHK | 2 | 71.5 | 3 | — |
| 1 | 7 | 2 BHK | 1 | 69.64 | 3 | — |
| 1 | 7 | 2 BHK | 1 | 68.71 | 3 | — |
| 1 | 7 | 3 BHK | 5 | 89.43 | 2 | — |
| 1 | 7 | 3 BHK | 2 | 89.88 | 2 | — |
| 1 | 8 | 2 BHK | 4 | 74.94 | 2 | — |
| 1 | 8 | 2 BHK | 1 | 75 | 2 | — |
| 1 | 8 | 2 BHK | 2 | 71.5 | 3 | — |
| 1 | 8 | 2 BHK | 1 | 69.64 | 3 | — |
| 1 | 8 | 2 BHK | 1 | 68.71 | 3 | — |
| 1 | 8 | 3 BHK | 5 | 89.43 | 2 | — |
| 1 | 8 | 3 BHK | 2 | 89.88 | 2 | — |
| 1 | 9 | 2 BHK | 4 | 74.94 | 2 | — |
| 1 | 9 | 2 BHK | 1 | 75 | 2 | — |
| 1 | 9 | 2 BHK | 2 | 71.5 | 3 | — |
| 1 | 9 | 2 BHK | 1 | 69.64 | 3 | — |
| 1 | 9 | 2 BHK | 1 | 68.71 | 3 | — |
| 1 | 9 | 3 BHK | 5 | 89.43 | 2 | — |
| 1 | 9 | 3 BHK | 2 | 89.88 | 2 | — |
| 1 | 10 | 2 BHK | 4 | 74.94 | 2 | — |
| 1 | 10 | 2 BHK | 1 | 75 | 2 | — |
| 1 | 10 | 2 BHK | 2 | 71.5 | 3 | — |
| 1 | 10 | 2 BHK | 1 | 69.64 | 3 | — |
| 1 | 10 | 2 BHK | 1 | 68.71 | 3 | — |
| 1 | 10 | 3 BHK | 5 | 89.43 | 2 | — |
| 1 | 10 | 3 BHK | 2 | 89.88 | 2 | — |
| 1 | 11 | 2 BHK | 4 | 74.94 | 2 | — |
| 1 | 11 | 2 BHK | 1 | 75 | 2 | — |
| 1 | 11 | 2 BHK | 2 | 71.5 | 3 | — |
| 1 | 11 | 2 BHK | 1 | 69.64 | 3 | — |
| 1 | 11 | 2 BHK | 1 | 68.71 | 3 | — |
| 1 | 11 | 3 BHK | 5 | 89.43 | 2 | — |
| 1 | 11 | 3 BHK | 2 | 89.88 | 2 | — |
| 1 | 12 | 2 BHK | 4 | 74.94 | 2 | — |
| 1 | 12 | 2 BHK | 1 | 75 | 2 | — |
| 1 | 12 | 3 BHK | 5 | 89.43 | 2 | — |
| 1 | 13 | 2 BHK | 4 | 74.94 | 2 | — |
| 1 | 13 | 2 BHK | 1 | 75 | 2 | — |
| 1 | 13 | 3 BHK | 5 | 89.43 | 2 | — |
| 1 | 14 | 2 BHK | 4 | 74.94 | 2 | — |
| 1 | 14 | 2 BHK | 1 | 75 | 2 | — |
| 1 | 14 | 3 BHK | 5 | 89.43 | 2 | — |
| 1 | 3 | 2 BHK | 4 | 74.94 | 2 | — |
| 1 | 3 | 3 BHK | 2 | 89.88 | 2 | — |
Permits & Approvals
Permit NoAffordable Housing/03031/PDA/BP/23-24/0598/10112023
Permit Date2024-03-22
Valid Until2029-03-21
Extendable Until2029-03-21
Documents
Filing documents
- Proforma of Completion Certificate(Occupancy)
- Details of Encumbrances#New(2024-05-18)View
- Commencement Certificate#New(2024-05-01)View
- Other Plan(If Any)#New(2024-05-01)View
- Proforma of Application Form#New(2024-05-01)View
- Proforma of Allotment Letter#New(2024-05-01)View
- Proforma of Conveyance Deed#New(2024-05-01)View
- Waste Disposal Plan#New(2024-05-01)View
- Water Supply Plan#New(2024-05-01)View
- Electricity Supply Plan#New(2024-05-01)View
- Development Work Plan#New(2024-05-01)View
- Affidavit (Form-B)#New(2024-05-01)View
- CA CERTIFICATE#New(2024-05-18)View
- ARCHITECT CERTIFICATE#New(2024-05-01)View
- ENGINEERS CERTIFICATE#New(2024-05-01)View
- Other#New(2024-07-03)View
- Proforma of Agreement for Sale#New(2024-05-01)View
Project Team
Architect Address139, ALLENGANJ, PRAYAGRAJ-211002
Engineer Address7/121-B, SWAROOP NAGAR, KANPUR-208002
Developer & Contact
Developer
Promoter NameCITIZEN INFRAVENTURES PVT LTD
Promoter AddressA/1 MG MARG, CIVIL LINES, ALLAHABAD-211001 Uttar Pradesh India
Company TypeCompany
Mobile9889844677
Emailsales@citizenhomes.in
Registered AddressA/1 MG MARG, CIVIL LINES, ALLAHABAD-211001 Uttar Pradesh India
Contractor Address14, IBRAHIMPUR, MAJRA KATKA, JHUNSI, PRAYAGRAJ-211019
Bank Accounts
Account Typecollection
Account Number7767644320
Account NameCITIZEN INFRAVENTURE-COLLECTION ACCOUNT FOR CITIZEN RAM NIVAS
Bank NameINDIAN BANK
BranchHINDI SAHITYA SAMMELAN BRANCH
Branch Address12 KP KAKKAR ROAD, PRAYAGRAJ
Branch DistrictPrayagraj
Branch StateSelect
IFSCIDIB000A580
Branch Emaila580@indianbank.co.in
Account Typeseparate
Account Number7767648585
Account NameCITIZEN INFRAVENTURES-SEPARATE ACCOUNT FOR CITIZEN RAM NIVAS
Bank NameINDIAN BANK
BranchHINDI SAHITYA SAMMELAN BRANCH
Branch Address12, KP KAKKAR ROAD, PRAYAGRAJ
Branch DistrictPrayagraj
Branch StateUttar Pradesh
IFSCIDIB000A580
Account Typetransaction
Account Number7767646600
Account NameCITIZEN INFRAVENTURES-TRANSACTION A/C FOR CITIZEN RAM NIVAS
Bank NameINDIAN BANK
BranchHINDI SAHITYA SAMMELAN BRANCH
Branch Address12 KP KAKKAR ROAD, PRAYAGRAJ
Branch DistrictPrayagraj
Branch StateUttar Pradesh
IFSCIDIB000A580
Development & Facilities
Development works
Demarcation Of PlotsPLOT HAS BEEN BOUNDED WITH BOUNDARY WALL. DIMENSION OF PROPERTY NORTH TO SOUTH TOWARDS EAST = 202.6 FEET. NORTH TO SOUTH TOWARDS WEST= 197 FEET. EAST TO WEST TOWARDS NORTH= 339 FEET. EAST TO WEST TOWARDS SOUTH= 339 FEET.
Boundary WallBOUNDARY WALL WILL BE MADE WITH COLUMN WITH PILING AND 9INCH BRICK WORK UPTO 6FT HEIGHT WITH COMPOUND LED LIGHT AND WHITE WASH
Road Work12 MTR. WIDE SETBACK ROAD WITH USE OF CONCRETE AND GREEN BELT APPROACH ROAD TO THE PROJECT PART OF MASTER PLAN ROAD
FootpathsPEDESTRIAN FOOTPATH (5 FT. WIDE) AND WALKING TRACK WILL BE CONSTRUCTED ALONG THE BUILDING SETBACK UPON COMPLETION OF CIVIL WORK.
Water Supply Including Drinking Water FacilitiesUNDERGROUND TANK (2 NOS. OF 25000 LITER. EACH) WILL BE USED TO SUPPLY WATER FROM BOREWELL TO OVERHEAD WATER TANK SUPPLEMENTED BY NAGAR NIGAM SUPPLY AS PER SERVICE PLAN OF PROJECT
Sewer SystemSEWER SYSTEM PLAN WILL BE PREPARED AS PER SERVICE PLAN OF THE PROJECT AND CONNECTED TO TRUNK NAGAR NIGAM SEWER LINE. DOWN SWR PIPES FROM RESIDENTIAL UNIT WILL BE OF 110MM WIDTH. WHILE UNDERGROUND SEVER LINES RANGING BETWEEN 150MM TO 200MM ALONG WITH 2X2 FT MANHOLE CHAMBER WILL BE PROVIDED
DrainPROPER DRAINAGE NETWORK WILL BE PROVIDED AS PER SERVICES PLAN BEING UPLOADED DOWN PVC PIPES FROM RESIDENTIAL UNIT WILL BE OF 110MM WIDTH
ParksGREEN AREA DEVELOPMENT OVER 700 SQ MTR WILL BE DONE UPON COMPLETION OF PROJECT. SUCH PARK AREA WILL BE DEVELOPED WITH TREE PLANTATION AND FLOWERING PLANTS AND EVERGREEN SHRUBS. THE PARK AREA WILL HAVE PARK BENCHES AND OUTDOOR LIGHTING. KIDS PLAY AREA WILL BE DEVELOPED WITH SWING AND PLAY PIT OVER 500 SQ .FT. AREA
Tree Planting35 NOS OF TREES WILL BE PLANTED INDIGENOUS SPECIES SUCH AS NEEM MANGO ASHOK ALONG WITH AVENUE TREES CHITWAN AMALTAS AND SHRUBS AND BUSHES AND HEDGES
Design For Electric Supply Including Street LightingINFRASTRUCTURE WILL BE DEVELOPED AS PER PuVVNL PROJECT ELECTRICAL PLAN HAS BEEN ATTACHED IN UPLOAD DOCUMENT SECTION. 3 NOS. TRANSFORMERS (400KVA, 250KVA, 250KVA) WILL BE INSTALLED DEPENDING ON THE SANCTIONED LOAD FOR THE PROJECT. ARMOURED CABLE 240MM WILL BE USED TO SUPPLY FROM TRANSFORMER TO BUSBAR SUBSEQUENTLY 16MM AND 10MM CABLE WILL BE USED TO CONNECT ELECTRICAL METERS TO FLAT SUPPLY. STREETS LIGHT OF 200 WATT AND LED COMPOUND LIGHT OF 12 WATT WILL BE PROVIDED THROUGHOUT THE CAMPUS.
Community BuildingsCOMMUNITY AREA WILL BE DEVELOPED ON THE FIRST FLOOR OF THE BUILDING WITH SPACE FOR INDOOR GAME GYM AND LAP POOL. TOTAL AREA EARMARKED ON THE FIRST FLOOR FOR COMMUNITY AREA = 5000 SQ. FT.
Treatment And Disposal System Of Sewage And Sullage WaterSEWAGE AND DRAINAGE SYSTEM WILL BE SETUP AS PER NORMS DEFINED BY PDA AND NAGAR NIGAM. DETAILED DRAWING OF SUCH INFRASTRUCTURE WILL BE PRESENTED ALONG WITH COMPLETION DRAWING.
Solid Waste Management And Disposal SystemBEING IN THE HEART OF THE CITY AND BARELY 2 KM FROM NAGAR NIGAM HEAD QUARTER SOLID WASTE MANAGEMENT AND DISPOSAL SYSTEM WILL BE MANAGED BY THE AUTHORITY ON PAYMENT OF REQUISITE FEE FROM USERS.
Water Conservation SystemRAIN WATER HARVESTING WILL BE PROVIDED AS PER THE APPROVED DRAWING OF THE PROJECT AND UPON COMPLETION OF THE PROJECT AS PER NORMS AND NOC WILL BE TAKEN FROM BHU JAL GARBH VIBHAG. RAIN WATER HARVESTING PIT WILL BE DEVELOPED AT TWO LOCATIONS WITHIN THE PREMISES WITH TOTAL CAPACITY = 36 CUBIC MTR. WHICH WILL SUFFICE FOR THE TERRACE AREA OF THE PROPOSED BUILDING.
Energy Management System Including Use Of Renewable EnergyCONVENTIONAL ENERGY MANAGEMENT AND EFFICIENT USE ALONG WITH USE OF RENEWABLE ENERGY WILL BE ENGAGED AT SUITABLE LOCATION WITH IN THE PROJECT. THE PROJECT IS ENVISIONED WITH OPTIMUM USE OF SOLAR POWER. (SOLAR PANEL OF 5 KW WITH SOLAR INVERTER WILL BE PROVIDED FOR COMMON AREA USAGE). COMMON AREA LIGHTING IN CORRIDOR WILL BE LED BASED. RAIN WATER HARVESTING EV CHARGING ALONG WITH DAY TIME LIGHTING USING MAXIMUM SUNLIGHT AMONG OTHER INITIATIVES.
Fire Protection And Fire Safety SystemTHE PROJECT HAS BEEN GRANTED PROVISIONAL NOC BY THE FIRE DEPARTMENT, ALL CONDITION LAID DOWN IN THE ATTACHED NOC WILL BE ADHERED TO. AS APPLICABLE UNDER FIRE SAFETY NORMS FIRE EXTINGUISHER AND HOSE REEL ALONG WITH FIRE ALARM WILL BE PROVIDED. MS PIPE OF 150MM B-CLASS ALONG WITH 100MM, 32MM,25MM DIAMETER ALONG WITH BUTTERFLY VALVE 150MM AND 100MM WILL BE USED PRESSURE GAUGE AIR VALVE 25MM WILL BE PROVIDED. HOSE REEL SET 30 MTR AND HYDRANT VALVE 63MM SS. RRL HOSE 15MTR SS ALONG WITH HOSE BOX CABINET WILL BE PROVIDED. 3 NOS FIRE PUMP 360MM TERRACE PUMP ALONG WITH STARTER PANEL. FIRE ALARM SYSTEM WITH PA. FIRE EXTINGUISHER ABC TYPE 6 KG=50 NOS AND CO2 TYPE 4.5 KG= 25 NOS WILL BE USED. AUTOMATED WATER SPRINKLER PENDENT TYPE WILL BE USED IN BASEMENT.
Social Infrastructure And Other Public Amenities Including Public Health ServicesPROJECT IS LOCATED IN VICINITY OF CBD AND IN CLOSE PROXIMITY TO PUBLIC AND PRIVATE HOSPITAL, SCHOOLS, POLICE STATION AND OTHER SOCIAL AND PUBLIC AMENITIES AND EMERGENCY SERVICES.
Emergency Evacuation ServicesAS PER NORMS OF THE FIRE DEPARTMENT AND PROVISIONAL NOC PROVIDED BY THE FIRE DEPARTMENT DESIGNATED 2 NOS ASSEMBLY POINT (2000 SQ FT EACH) WILL BE DEVELOPED WITHIN THE PROJECT TO ENABLE EVACUATION IN CASE OF EMERGENCY.
Other Miscellaneous WorkOTHER MISCELLANEOUS WORKS WILL BE CARRIED OUT AS PER INSTRUCTION FROM PROJECT ARCHITECT, MEP CONSULTANT, OTHER CONSULTANT AND DEVELOPMENT AUTHORITY.
Financials
Registration Fee (₹)36500
Project Duration (months)59