CITIZEN TWIN TOWERS

by CITIZEN INFRAVENTURES PVT LTD

Prayagraj, Uttar Pradesh · UPRERAPRJ707993/05/2026

Registered

Total units

241

Overview

Registration Date2026-05-26
RERA NumberUPRERAPRJ707993/05/2026
Promoter IDUPRERAPRM9344
Proposed Start2026-04-04
Proposed Completion2031-03-27

Location

DistrictPrayagraj
TehsilPhulpur
VillageMauja- Maheshpur
LocalityPargana-Jhunsi
AddressARAZI NO. 3,4,6,7,8,9,10,11,12,13Ka, 14 & 15
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Total Units241
Unit Types5
Blocks3
Floors16

Khasra records (12)

Show all 12 khasra rows
  • Arazi No. 3· Khasra· 460
  • Arazi No.4· Khasra· 1720
  • Arazi No.6· Khasra· 580
  • Arazi No.7· Khasra· 570
  • Arazi No.8· Khasra· 690
  • Arazi No.9· Khasra· 570
  • Arazi No.10· Khasra· 2800
  • Arazi No11· Khasra· 560
  • Arazi No.12· Khasra· 460
  • Arazi No.13Ka· Khasra· 200
  • Arazi No.14· Khasra· 420
  • Arazi No.15· Khasra· 480

Inventory

Apartments (198 rows)
BlockFloorTypeCountCarpet (m²)BalconyGarage
BLOCK-A13 BHK1120.11
BLOCK-A13 BHK1119.551
BLOCK-A12 BHK190.922
BLOCK-A12 BHK191.182
BLOCK-A12 BHK193.21
BLOCK-A12 BHK192.951
BLOCK-A12 BHK191.172
BLOCK-A12 BHK191.172
BLOCK-A23 BHK1120.841
BLOCK-A23 BHK1120.111
BLOCK-A22 BHK190.922
BLOCK-A22 BHK191.182
BLOCK-A22 BHK193.781
BLOCK-A22 BHK193.681
BLOCK-A22 BHK191.172
BLOCK-A22 BHK191.172
BLOCK-A33 BHK1120.841
BLOCK-A33 BHK1120.111
BLOCK-A32 BHK190.922
BLOCK-A32 BHK191.182
BLOCK-A32 BHK193.781
BLOCK-A32 BHK193.681
BLOCK-A32 BHK191.172
BLOCK-A32 BHK191.172
BLOCK-A43 BHK1120.841
BLOCK-A43 BHK1120.111
BLOCK-A42 BHK190.922
BLOCK-A42 BHK191.182
BLOCK-A42 BHK193.781
BLOCK-A42 BHK193.681
BLOCK-A42 BHK191.172
BLOCK-A42 BHK191.172
BLOCK-A53 BHK1120.841
BLOCK-A53 BHK1120.111
BLOCK-A52 BHK190.922
BLOCK-A52 BHK191.182
BLOCK-A52 BHK193.781
BLOCK-A52 BHK193.681
BLOCK-A52 BHK191.172
BLOCK-A52 BHK191.172
BLOCK-A63 BHK1120.841
BLOCK-A63 BHK1120.111
BLOCK-A62 BHK190.922
BLOCK-A62 BHK191.182
BLOCK-A62 BHK193.781
BLOCK-A62 BHK193.681
BLOCK-A62 BHK191.172
BLOCK-A62 BHK191.172
BLOCK-A73 BHK1120.841
BLOCK-A73 BHK1120.111
BLOCK-A72 BHK190.922
BLOCK-A72 BHK191.182
BLOCK-A72 BHK193.781
BLOCK-A72 BHK193.681
BLOCK-A72 BHK191.172
BLOCK-A72 BHK191.172
BLOCK-A83 BHK1120.841
BLOCK-A83 BHK1120.111
BLOCK-A82 BHK190.922
BLOCK-A82 BHK191.182
BLOCK-A82 BHK193.781
BLOCK-A82 BHK193.681
BLOCK-A82 BHK191.172
BLOCK-A82 BHK191.172
BLOCK-A93 BHK1120.841
BLOCK-A93 BHK1120.111
BLOCK-A92 BHK190.922
BLOCK-A92 BHK191.182
BLOCK-A92 BHK193.781
BLOCK-A92 BHK193.681
BLOCK-A92 BHK191.172
BLOCK-A92 BHK191.172
BLOCK-A103 BHK1120.841
BLOCK-A103 BHK1120.111
BLOCK-A102 BHK190.922
BLOCK-A102 BHK191.182
BLOCK-A102 BHK193.781
BLOCK-A102 BHK193.681
BLOCK-A102 BHK191.172
BLOCK-A102 BHK191.172
BLOCK-A113 BHK1120.841
BLOCK-A113 BHK1120.111
BLOCK-A112 BHK190.922
BLOCK-A112 BHK191.182
BLOCK-A112 BHK193.781
BLOCK-A112 BHK193.681
BLOCK-A112 BHK191.172
BLOCK-A112 BHK191.172
BLOCK-A123 BHK1120.841
BLOCK-A123 BHK1120.111
BLOCK-A122 BHK190.922
BLOCK-A122 BHK191.182
BLOCK-A122 BHK193.781
BLOCK-A122 BHK193.681
BLOCK-A122 BHK191.172
BLOCK-A122 BHK191.172
BLOCK-A133 BHK1120.841
BLOCK-A133 BHK1120.111
BLOCK-A132 BHK190.922
BLOCK-A132 BHK191.182
BLOCK-A132 BHK193.781
BLOCK-A132 BHK193.681
BLOCK-A132 BHK191.172
BLOCK-A132 BHK191.172
BLOCK-A143 BHK1120.841
BLOCK-A143 BHK1120.111
BLOCK-A142 BHK190.922
BLOCK-A142 BHK191.182
BLOCK-A142 BHK193.781
BLOCK-A142 BHK193.681
BLOCK-A142 BHK191.172
BLOCK-A142 BHK191.172
BLOCK-A153 BHK1120.841
BLOCK-A153 BHK1120.111
BLOCK-A152 BHK190.922
BLOCK-A152 BHK191.181
BLOCK-A152 BHK193.781
BLOCK-A152 BHK193.681
BLOCK-A152 BHK191.172
BLOCK-A152 BHK191.172
BLOCK-A163 BHK1120.841
BLOCK-A163 BHK1120.111
BLOCK-A162 BHK190.922
BLOCK-A162 BHK191.182
BLOCK-A162 BHK193.781
BLOCK-A162 BHK193.681
BLOCK-A162 BHK191.172
BLOCK-A162 BHK191.172
BLOCK-B14 BHK1173.931
BLOCK-B13 BHK1119.582
BLOCK-B13 BHK1119.62
BLOCK-B13 BHK1120.531
BLOCK-B13 BHK1120.591
BLOCK-B13 BHK1119.622
BLOCK-B13 BHK1119.642
BLOCK-B24 BHK1174.61
BLOCK-B23 BHK4119.852
BLOCK-B23 BHK1121.081
BLOCK-B23 BHK1121.091
BLOCK-B34 BHK1174.61
BLOCK-B33 BHK4119.852
BLOCK-B33 BHK1121.081
BLOCK-B33 BHK1121.091
BLOCK-B44 BHK1174.61
BLOCK-B43 BHK4119.852
BLOCK-B43 BHK1121.081
BLOCK-B43 BHK1121.091
BLOCK-B54 BHK1174.61
BLOCK-B53 BHK4119.852
BLOCK-B53 BHK1121.081
BLOCK-B53 BHK1121.091
BLOCK-B64 BHK1174.61
BLOCK-B63 BHK4119.852
BLOCK-B63 BHK1121.081
BLOCK-B63 BHK1121.091
BLOCK-B74 BHK1174.61
BLOCK-B73 BHK4119.852
BLOCK-B73 BHK1121.081
BLOCK-B73 BHK1121.091
BLOCK-B84 BHK1174.61
BLOCK-B83 BHK4119.852
BLOCK-B83 BHK1121.081
BLOCK-B83 BHK1121.091
BLOCK-B94 BHK1174.61
BLOCK-B93 BHK4119.852
BLOCK-B93 BHK1121.081
BLOCK-B93 BHK1121.091
BLOCK-B104 BHK1174.61
BLOCK-B103 BHK4119.852
BLOCK-B103 BHK1121.081
BLOCK-B103 BHK1121.091
BLOCK-B114 BHK1174.61
BLOCK-B115 BHK1234.843
BLOCK-B115 BHK1234.843
BLOCK-B115 BHK1242.162
BLOCK-B113 BHK1121.091
BLOCK-B113 BHK2119.852
BLOCK-B124 BHK1174.61
BLOCK-B123 BHK1121.091
BLOCK-B123 BHK2119.852
BLOCK-B134 BHK1174.61
BLOCK-B135 BHK2234.843
BLOCK-B135 BHK1242.162
BLOCK-B133 BHK1121.091
BLOCK-B133 BHK2119.852
BLOCK-B144 BHK1174.61
BLOCK-B143 BHK1121.091
BLOCK-B143 BHK2119.852
BLOCK-B154 BHK1174.61
BLOCK-B155 BHK2234.843
BLOCK-B155 BHK1242.162
BLOCK-B153 BHK1121.091
BLOCK-B153 BHK2119.852
BLOCK-B164 BHK1174.61
BLOCK-B163 BHK1121.091
BLOCK-B163 BHK2119.852
BLOCK-C1SHOP517.170
BLOCK-C2SHOP517.170

Permits & Approvals

Permit NoGroup Housing/05683/PDA/BP/25-26/1099/27032026
Permit Date2026-03-28
Valid Until2031-03-27
Extendable Until2034-03-27

Documents

Filing documents

  • Other Plan(If Any)
  • Details of Encumbrances#New(2026-04-08)
    View
  • Commencement Certificate#New(2026-04-08)
    View
  • Other Plan(If Any)#New(2026-04-08)
    View
  • Proforma of Application Form#New(2026-04-21)
    View
  • Proforma of Allotment Letter#New(2026-04-08)
    View
  • Proforma of Conveyance Deed#New(2026-04-08)
    View
  • Waste Disposal Plan#New(2026-04-21)
    View
  • Water Supply Plan#New(2026-04-21)
    View
  • Electricity Supply Plan#New(2026-04-21)
    View
  • Development Work Plan#New(2026-04-21)
    View
  • Affidavit (Form-B)#New(2026-04-08)
    View
  • CA CERTIFICATE#New(2026-04-08)
    View
  • ARCHITECT CERTIFICATE#New(2026-04-08)
    View
  • ENGINEERS CERTIFICATE#New(2026-04-21)
    View
  • Other#New(2026-05-13)
    View
  • Proforma of Agreement for Sale#New(2026-04-08)
    View

Land documents

  • Registry Document#Bahi No. 01 Vol No. 2527 Page No. 387 to 410 Document No. 452 Dated 08/02/2008(2008-02-08)
    19713238692.pdf
    View
  • Registry Document#Bahi No.01 Vol No. 1050 Page No. 71 to 100 Document No. 4677(2002-12-03)
    19713235778.pdf
    View
  • Registry Document#Bahi No.01 Vol No. 1068 Page No. 75 to 104 Document No. 5223(2002-12-31)
    19713234731.pdf
    View
  • Registry Document#Bahi No.01 Vol No. 1055 Page No. 183 to 212 Document No. 4846(2002-12-16)
    19713239168.pdf
    View
  • Extract of Khatauni#1425-1430 (01July,2017 to 30June,2023)(1900-01-01)
    19713238795.pdf
    View
  • Extract of Khatauni#1425-1430 (01July,2017 to 30June,2023)(1900-01-01)
    19713239616.pdf
    View
  • Extract of Khatauni#1425-1430 (01July,2017 to 30June,2023)(1900-01-01)
    19713232832.pdf
    View
  • Extract of Khatauni#1425-1430 (01July,2017 to 30June,2023)(1900-01-01)
    19713233251.pdf
    View
  • Extract of Khatauni#1425-1430 (01July,2017 to 30June,2023)(1900-01-01)
    19713231823.pdf
    View
  • Extract of Khatauni#1425-1430 (01July,2017 to 30June,2023)(1900-01-01)
    19713239484.pdf
    View
  • Extract of Khatauni#1425-1430 (01July,2017, to 30June,2023)(1900-01-01)
    19713233850.pdf
    View
  • Extract of Khatauni#1425-1430 (01July,2017 to 30June,2023)(1900-01-01)
    19713235313.pdf
    View
  • Extract of Khatauni#1425-1430 (01July,2017 to 30June,2023)(1900-01-01)
    19713231403.pdf
    View
  • Extract of Khatauni#1425-1430 (01July,2017 to 30June,2023)(1900-01-01)
    19713238404.pdf
    View
  • Extract of Khatauni#1425-1430 (01July,2017 to 30June,2023)(1900-01-01)
    19713238320.pdf
    View
  • Extract of Khatauni#1425-1430 (01July,2017 to 30June,2023)(1900-01-01)
    19713238258.pdf
    View
  • Registry Document#Bahi No. 01 Vol No. 11740 Page No. 1 to 88 Document No. 3602(2026-04-04)
    19713231851.pdf
    View
  • Extract of Khatauni#1425-1430 (01July,2017 to 30June,2023)(1900-01-01)
    19713233401.pdf
    View
  • Registry Document#Bahi No 1 Vol No. 11819 Page No 369 to 382 Document No.5261(2026-05-14)
    19713235646.pdf
    View

Project Team

Architect Address49/G-7, LOTUS APARTMENT, TASHKEND MARG, CIVIL LINES, PRAYAGRAJ-211001
Engineer AddressD-27, INDIRA NAGAR, LUCKNOW

Developer & Contact

Developer

Promoter NameCITIZEN INFRAVENTURES PVT LTD
Promoter AddressA/1 MG MARG, CIVIL LINES, ALLAHABAD-211001 Uttar Pradesh India
Company TypeCompany
Mobile9889844677
Emailsales@citizenhomes.in
Registered AddressA/1 MG MARG, CIVIL LINES, ALLAHABAD-211001 Uttar Pradesh India
Contractor Address207/8, BENIGANJ, PRAYAGRAJ, UTTAR PRADESH- 211016

Bank Accounts

Account Typecollection
Account Number8281317984
Account NameCITIZEN INFRAVENTURES COLLECTION A/C FOR CITIZEN TWIN TOWERS
Bank NameIndian Bank
BranchHindi Sahitya Sammelan Branch
Branch Address12, K P Kakkar Road, Prayagraj 211003
Branch DistrictPrayagraj
Branch StateUttar Pradesh
IFSCIDIB000A580
Branch Emaila580@indianbank.co.in
Account Typeseparate
Account Number8281319867
Account NameCITIZEN INFRAVENTURES SEPARATE A/C FOR CITIZEN TWIN TOWERS
Bank NameIndian Bank
BranchHindi Sahitya Sammelan Branch
Branch Address12 K P, KAKKAR ROAD, PRYAGRAJ-211003
Branch DistrictPrayagraj
Branch StateUttar Pradesh
IFSCIDIB000A580
Account Typetransaction
Account Number8281318660
Account NameCITIZEN INFRAVENTURES RERA TXN A/C FOR CITIZEN TWIN TOWERS
Bank NameIndian Bank
BranchHindi Sahitya Sammelan branch
Branch Address12 K P KAKKAR ROAD, PRAYAGRAJ-211003
Branch DistrictPrayagraj
Branch StateUttar Pradesh
IFSCIDIB000A580

Development & Facilities

Development works

Demarcation Of PlotsThe project is proposed on clear, continuous and open plot measuring 9510 Sq. Mts, bounded by a 5 Ft. boundary wall (Constructed almost 20 years ago). The plot is abutting a 18 mtr. wide masterplan road with 145 ft. frontage.
Boundary WallBoundary wall for the project will be constructed up to 2 mtr height with 230mm thick brick work supported by RCC work in columns and beams. Compound light will be placed on of columns and planters will be constructed to house decorative shrubs and flowering plants. Barbed wire will be installed on the top the boundary for added security.
Road WorkThe setback roads of the project are 11 mtr and 13.5 mtr wide. Commencing from the main gate internal setback roads of the entire project will be constructed with RCC using M25 concrete.
FootpathsPedestrian footpath (1 Mtr Wide) or walking track will be constructed along the building setback for the ease of the residents. It will be raised by 100mm from the ground and finished with chequered/anti-skid cement tiles.
Water Supply Including Drinking Water FacilitiesUnderground track (2 Nos. of the 25000 Liter each) will be used to supply water from two borewells to overhead water tank supplemented by Nagar Nigam supply as per service plan of the project. Each residential tower will have 4 OHTs. All tank will be coated with food grade coating in the inside and OTHs will have provision for heat insulation with air gap and additional brick work.
Sewer SystemSewer system plan will be prepared as per service plan of the project and connected trunk Nagar Nigam sewer line. Down SWR pipe from residential unit will be of 110mm along with 2x2 Ft. manhole chamber will be provided. A 150 kld STP based on MBBR technology is proposed to be constructed for the project.
DrainProper drainage network will be provided as per service plan being uploaded. Down PVC pipes from residential units and terrace (Rain Water) will be of150mm dia. Underground storm water drains will be provided for road run-off and from landscape areas. These 150mm pipe will be connected to the RWH pits (45 Cubic Meter capacity) to be constructed within the project.
ParksOver 980 Sq. Mtr. of green area is proposed to be developed within the project. Such green area will be developed with tree plantation and flowering plants and evergreen shrubs along with small waterbody and fountain to be developed. The green area will have park benches and sit out gazebo, outdoor lighting. Kids play area will be developed with play station.
Tree PlantingOver 50 Nos trees will be planted within the project. Selection of trees will be flowering and fruiting type along with native shrubs, bushes and hedges. The trees will be planted along the boundary as well as green areas.
Design For Electric Supply Including Street LightingInfrastructure will be developed as per PuVVNL with independent feeder. As per expected load of the project 4 Nos. transformer (400KVA, 400KVA, 250KVA, 250KVA) will be installed subject to the final sanctioned load for the project. Armoured cable 240mm will be used to supply from transformer to busbar subsequently 16mm and 10mm cable will be used connect electrical meter to flat main supply. Street light of 200 watt and LED compound light of 12 Watts will be provided throughout the campus along with solar street light at important points. Generator power backup infrastructure will be provided for common areas.
Community BuildingsA multipurpose hall is proposed in separate Block- C for the benefit of the residents which can used for banquets and gathering. The area of this hall is 2500 sq. ft. The block will also have a basement to be used for store. The top floor of Block-C will have a well equiped Gym and Indoor games area along with a Swimming pool of 110 Sq. Mts.
Treatment And Disposal System Of Sewage And Sullage WaterSewage and Drainage system will be setup as per norm defined by PDA and Nagar Nigam. A 150kld STP base on MBBR Technology has been proposed for the project. Sullage and sewage waste will be taken to the STP with 110mm SWR pipes and 200/250mm PVC main lines connected with 2X2 ft manholes. Detailed drawing of such infrastructure will be presented along with completion drawing.
Solid Waste Management And Disposal SystemGarbage collection bins with easy access is being proposed at the project. within the project as per norms 3 nos dustbin enclosures shall be provided (15 Sq. Mt. each). Each such enclosure will be colour coded marked to collect Type A. Bio-degradable watstes (Green), Type-B, E-wastes (Black), Type C. Plastic and metal waste (Blue). The colour coded dustbins are marked on the approved map of the project.
Water Conservation SystemRain water harvesting will be provided as per the approved drawing of the project. Upon completion of the project as per norms and NOC will be taken from BHU Jal Garbh Vibhag. Rain water harvesting pit will be develope)d at two locations within the premises with total capacity = 45 cubic mtr. which will be suffice for the roof top run-off of the proposed towers.
Energy Management System Including Use Of Renewable EnergyConventional energy management and efficient use along with use of renewable energy will be engaged at suitable location within the project. The project is envisioned with optimum use of solar power. (Solar panel of 10 KW with solar inverter will be provided for common area usage). Common area lighting in corridor will be LED based. Rain water harvesting, EV Charging along with day time lighting using maximum sunlight among other initiatives.
Fire Protection And Fire Safety SystemThe project has been granted prvisional NOC by the fire department, All condition laid down in the attached NOC will be adhere to. As applicable under fire safety norms fire extinguisher and hose reel along with fire alarm will be provided. MS pipe of 150mm B-Class along with 100mm,32mm and 25mm diameter along with butterfly valve 150mm and 100mm will be used. Pressure gauge air valve 25mm will be provided. Hose reel set 30mtr and hydrant valve 63mm SS, RRL Hose 15 mtr. SS along with the hose box cabinet will be provided. 2nos fire pump 360mm terrace pump along with starter panel will be provided in each tower. Fire alarm system with PA. Fire Extinguisher ABC type 6 KG= 100 Nos and CO2 type 4.5 KG= 50 Nos will be provided. Automated water sprinkler pendent type will be used in basement and all residential units. Fire tower with fire rated doors and fire rated lift will be provided as shown in approved map of the project. Emergency lights will be installed on residential floors.
Social Infrastructure And Other Public Amenities Including Public Health ServicesProject is located in the Nagar Nigam area and in close proximity to public and private hospitals, schools, police station and other social and public amenities and emergency services.
Emergency Evacuation ServicesAs per norms of the fire department and provisional NOC provided by the fire department designated 2 Nos. assembly point (2000 sq. ft. each) will be developed within the project to enable evacuation in case of emergency. Both towers have fire escape stairs and fire tower with fire rated doors/emergency exit.
Other Miscellaneous Work64 Nos. CCTV Camera in the campus- common areas, boom barrier at the entry gate will be installed. EPBAX will be installed in the residential flats, a mandir will be constructed for the welfare of the society. Other miscellaneous works will be carried out as per instruction from project architect, MEP consultant, other consultant and development authority.

Financials

Registration Fee (₹)53000
Project Duration (months)60