Construction of 252 Nos different type of semi finished houses in Sec-6 Mandola Vihar yojna Ghaziabad

by U.P. Awas Evam Vikas Parishad

Ghaziabad, Uttar Pradesh · UPRERAPRJ623188

Registered

Overview

Registration Date2021-10-08
RERA NumberUPRERAPRJ623188
Promoter IDUPRERAPRM4243
Proposed Start2022-01-01
Proposed Completion2023-12-31

Location

DistrictGhaziabad
TehsilGhaziabad
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew

Khasra records (2)

  • 1359, 1360, 1361, 1362 , 1363, 1366, 1367, 1369, 1370 (Part)· Khasra· 18890
  • 2, 3, 4, 5, 15, 56· Khasra· 28414

Permits & Approvals

Permit No750/A.P-5/sec-6/MV/7
Permit Date2021-03-17
Valid Until2026-03-16
Extendable Until2029-03-16

Documents

Filing documents

  • Details of Encumbrances#New(2021-08-25)
    View
  • Commencement Certificate#New(2021-09-03)
    View
  • Other Plan(If Any)#New(2021-08-25)
    View
  • Proforma of Application Form#New(2021-08-25)
    View
  • Proforma of Allotment Letter#New(2021-08-25)
    View
  • Proforma of Conveyance Deed#New(2021-08-25)
    View
  • Proforma of Completion Certificate(Occupancy)#New(2021-08-26)
    View
  • Waste Disposal Plan#New(2021-08-26)
    View
  • Water Supply Plan#New(2021-08-25)
    View
  • Electricity Supply Plan#New(2021-08-25)
    View
  • Development Work Plan#New(2021-08-26)
    View
  • Affidavit (Form-B)#New(2021-08-25)
    View
  • CA CERTIFICATE#New(2021-09-03)
    View
  • ARCHITECT CERTIFICATE#New(2021-08-26)
    View
  • ENGINEERS CERTIFICATE#New(2021-08-26)
    View

Land documents

  • Extract of Khatauni#2012(1900-01-01)
    2981276879Mandola khasre.pdf
    View
  • Extract of Khatauni#2011(1900-01-01)
    2981275198Milk Bamla khasre.pdf
    View

Project Team

Architect AddressAP Unit-5 UP Awas evam Vikas Parishad, Neelgiri complex, Lucknow
Engineer AddressCD Baghpat-03 UP Awas Evam Vikas Parishad, Sector-7 Mandola Vihar Yojna Ghaziabad

Developer & Contact

Developer

Promoter NameU.P. Awas Evam Vikas Parishad
Promoter Address104 Mahatma Gandhi Marg, Lucknow
Company TypeCompetent authority
Mobile8189081725
Emailupavp-rera@upavp.com
Registered Address104 Mahatma Gandhi Marg, Lucknow
Contractor AddressCD Baghpat-03 UP Awas Vikas evam Parishad, Sector-7 Mandola vihar yojna Ghaziabad

Bank Accounts

Account Typecollection
Account Number50100453213462
Account NameUPAVP Mandola Vihar Yojna Gzb Collection A/C
Bank NameHDFC Bank
BranchGhaziabad Vasundhara
Branch Address4/5, Om PLaza, Sector-15C, Vasundhara Ghaziabad
Branch DistrictGhaziabad
IFSCHDFC000563
Account Typeseparate
Account Number50100453213498
Account NameUPAVP Mandola Vihar Yojna Gzb Seperate A/C
Bank NameHDFC Bank
BranchGhaziabad Vasundhara
Branch Address4/5, Om Plaza, Sector-15C, Vasundhara Ghaziabad
Branch DistrictGhaziabad
IFSCHDFC000563
Account Typetransaction
Account Number50100453213485
Account NameUPAVP Mandola Vihar Yojna Gzb Transaction A/C
Bank NameHDFC Bank
BranchGhaziabad Vasundhra
Branch Address4/5, Om Plaza, Sector-15C, Vasundhara Ghaziabad
Branch DistrictGhaziabad
IFSCHDFC000563

Development & Facilities

Development works

Demarcation Of PlotsAs per Approved Lay out Plan
Boundary WallNo Provision of Boundary wall
Road WorkTrunk Roads of Mandola Vihar yojna are already constructed. Internal Roads of 9.0 m and 12.0 m are proposed, which will be constructed by UPAVP as per Parishad Specification
FootpathsAs per specification of UPAVP
Water Supply Including Drinking Water FacilitiesInternal Water supply Line of PVC pipe of 110 mm dia will be laid as per design approved by the competent authority of UPAVP. Water supply will be given by Over head tank which will be constructed by parishad
Sewer SystemInternal Sewer line of 250mm dia RCC NP2 and NP3 pipe will be laid as per design approved by the competant authority of UPAVP
DrainInternal Storm water drain of CK and C type will be provided as per design approved by the competant authority of UPAVP
ParksOpen / Green will be provided as per approved layout.
Tree PlantingTree Planting will be done by UPAVP as per norms approved by horticulture section of Parishad
Design For Electric Supply Including Street LightingElectrification work and street light work will be done by UPAVP as per design and drawing approved by the competant authority of UPAVP. Electricity supply line will be handed over to UP Power corporation after completing and testing of line.
Community BuildingsNo Provision of Community Building
Treatment And Disposal System Of Sewage And Sullage WaterWill be done by UPAVP as per Specification
Solid Waste Management And Disposal SystemTo be Provided as per UPAVP norms / specification
Water Conservation SystemPresently not planned
Energy Management System Including Use Of Renewable EnergyPresently not planned
Fire Protection And Fire Safety Systemas per norms/ specification
Social Infrastructure And Other Public Amenities Including Public Health ServicesPlanned as per provision in the vicinity of the project
Emergency Evacuation Servicesas per layout
Other Miscellaneous WorkNo

Financials

Registration Fee (₹)241500
Project Duration (months)57