Crown Residences at Godrej Golf Links

by AR LANDCRAFT LLP

Gautam Buddha Nagar, Uttar Pradesh · UPRERAPRJ438937/04/2026

Registered

Total units

288

Overview

Registration Date2026-04-02
RERA NumberUPRERAPRJ438937/04/2026
Promoter IDUPRERAPRM1081
Proposed Start2025-11-01
Proposed Completion2030-05-06

Location

DistrictGautam Buddha Nagar
TehsilDadri
VillageUttar Pradesh
LocalityIndia
AddressPlot No. REP-01, Sector-27
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Total Units288
Unit Types4
Blocks4
Floors26

Khasra records (1)

  • REP-01· Plot· 403575

Inventory

Apartments (199 rows)
BlockFloorTypeCountCarpet (m²)BalconyGarage
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)GFOTHER000
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)1OTHER000
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)23 BHK290.54
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)23 BHK1130.73
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)24 BHK1162.33
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)33 BHK290.54
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)33 BHK1130.73
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)34 BHK1162.33
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)43 BHK290.54
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)43 BHK1130.73
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)44 BHK1162.33
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)53 BHK290.54
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)53 BHK1130.73
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)54 BHK1162.33
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)63 BHK290.54
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)63 BHK1130.73
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)64 BHK1162.33
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)73 BHK290.54
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)73 BHK1130.73
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)74 BHK1162.33
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)83 BHK290.54
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)83 BHK1130.73
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)84 BHK1162.33
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)93 BHK290.54
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)93 BHK1130.73
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)94 BHK1162.33
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)103 BHK290.54
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)103 BHK1130.73
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)104 BHK1162.33
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)113 BHK290.54
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)114 BHK1162.33
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)123 BHK290.54
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)123 BHK1130.73
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)124 BHK1162.33
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)133 BHK290.54
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)133 BHK1130.73
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)134 BHK1162.33
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)143 BHK290.54
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)143 BHK1130.73
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)144 BHK1162.33
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)153 BHK290.54
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)153 BHK1130.73
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)154 BHK1162.33
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)163 BHK290.54
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)163 BHK1130.73
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)164 BHK1162.33
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)173 BHK290.54
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)173 BHK1130.73
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)174 BHK1162.33
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)183 BHK1130.73
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)184 BHK1162.33
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)182 BHK277.13
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)193 BHK290.54
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)193 BHK1130.73
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)194 BHK1162.33
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)203 BHK290.54
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)203 BHK1130.73
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)204 BHK1162.33
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)213 BHK290.54
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)213 BHK1130.73
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)214 BHK1162.33
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)223 BHK290.54
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)223 BHK1130.73
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)224 BHK1162.33
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)233 BHK290.54
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)233 BHK1130.73
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)234 BHK1162.33
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)243 BHK290.54
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)243 BHK1130.73
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)244 BHK1162.33
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)253 BHK290.54
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)253 BHK1130.73
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)254 BHK1162.33
AMBER (APPROVED AS TOWER- A1 IN BUILDING PLAN)113 BHK1130.73
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)GFOTHER000
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)1OTHER000
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)23 BHK290.54
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)23 BHK2130.73
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)33 BHK290.54
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)33 BHK2130.73
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)43 BHK290.54
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)43 BHK2130.73
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)53 BHK290.54
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)53 BHK2130.73
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)63 BHK290.54
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)63 BHK2130.73
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)73 BHK2130.73
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)73 BHK290.54
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)83 BHK290.54
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)83 BHK2130.73
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)93 BHK290.54
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)93 BHK2130.73
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)103 BHK290.54
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)103 BHK2130.73
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)113 BHK290.54
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)113 BHK2130.73
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)123 BHK290.54
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)123 BHK2130.73
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)133 BHK290.54
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)133 BHK2130.73
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)143 BHK290.54
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)143 BHK2130.73
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)153 BHK290.54
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)153 BHK2130.73
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)163 BHK290.54
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)163 BHK2130.73
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)173 BHK290.54
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)173 BHK2130.73
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)182 BHK277.13
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)183 BHK2130.73
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)193 BHK290.54
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)193 BHK2130.73
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)203 BHK290.54
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)203 BHK2130.73
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)213 BHK290.54
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)213 BHK2130.73
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)223 BHK290.54
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)223 BHK2130.73
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)233 BHK290.54
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)233 BHK2130.73
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)243 BHK290.54
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)243 BHK2130.73
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)253 BHK290.54
CORAL (APPROVED AS TOWER- A2 IN BUILDING PLAN)253 BHK2130.73
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)GFOTHER000
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)1OTHER000
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)23 BHK290.54
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)23 BHK1130.73
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)24 BHK1162.33
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)33 BHK290.54
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)33 BHK1130.73
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)34 BHK1162.33
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)43 BHK290.54
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)43 BHK1130.73
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)44 BHK1162.33
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)53 BHK290.54
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)53 BHK1130.73
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)54 BHK1162.33
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)63 BHK290.54
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)63 BHK1130.73
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)64 BHK1162.33
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)73 BHK290.54
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)73 BHK1130.73
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)74 BHK1162.33
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)83 BHK290.54
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)83 BHK1130.73
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)84 BHK1162.33
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)93 BHK290.54
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)93 BHK1130.73
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)94 BHK1162.33
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)103 BHK290.54
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)103 BHK1130.73
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)104 BHK1162.33
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)113 BHK290.54
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)113 BHK1130.73
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)114 BHK1162.33
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)123 BHK290.54
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)123 BHK1130.73
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)133 BHK290.54
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)133 BHK1130.73
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)134 BHK1162.33
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)143 BHK290.54
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)143 BHK1130.73
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)144 BHK1162.33
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)153 BHK290.54
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)153 BHK1130.73
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)154 BHK1162.33
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)163 BHK290.54
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)163 BHK1130.73
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)164 BHK1162.33
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)173 BHK290.54
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)173 BHK1130.73
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)174 BHK1162.33
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)182 BHK277.13
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)183 BHK1130.73
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)184 BHK1162.33
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)193 BHK290.54
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)193 BHK1130.73
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)194 BHK1162.33
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)203 BHK290.54
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)203 BHK1130.73
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)204 BHK1162.33
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)213 BHK290.54
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)213 BHK1130.73
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)214 BHK1162.33
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)223 BHK290.54
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)223 BHK1130.73
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)224 BHK1162.33
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)233 BHK290.54
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)233 BHK1130.73
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)234 BHK1162.33
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)243 BHK290.54
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)243 BHK1130.73
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)244 BHK1162.33
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)253 BHK290.54
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)253 BHK1130.73
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)254 BHK1162.33
PEARL (APPROVED AS TOWER- A3 IN BUILDING PLAN)124 BHK1162.33
Club and Lobby AreaGFOTHER025210

Permits & Approvals

Permit NoPLG/(BP)/1678
Permit Date2025-05-07
Valid Until2030-05-06
Extendable Until2033-05-05

Documents

Filing documents

  • Other Plan(If Any)
  • Other Plan(If Any)
  • Other Plan(If Any)
  • Other Plan(If Any)
  • Other Plan(If Any)
  • Other Plan(If Any)
  • Proforma of Application Form
  • Proforma of Application Form
  • Proforma of Application Form
  • Proforma of Application Form
  • Proforma of Allotment Letter
  • Proforma of Completion Certificate(Occupancy)
  • Waste Disposal Plan
  • Waste Disposal Plan
  • Water Supply Plan
  • Electricity Supply Plan
  • Electricity Supply Plan
  • Development Work Plan
  • Development Work Plan
  • Affidavit (Form-B)
  • CA CERTIFICATE
  • ARCHITECT CERTIFICATE
  • ARCHITECT CERTIFICATE
  • ARCHITECT CERTIFICATE
  • ENGINEERS CERTIFICATE
  • ENGINEERS CERTIFICATE
  • Other
  • Other
  • Proforma of Agreement for Sale
  • Proforma of Agreement for Sale
  • Proforma of Agreement for Sale
  • Details of Encumbrances#New(2025-12-25)
    View
  • Commencement Certificate#New(2025-12-25)
    View
  • Other Plan(If Any)#New(2026-02-26)
    View
  • Proforma of Application Form#New(2026-03-08)
    View
  • Proforma of Allotment Letter#New(2026-01-17)
    View
  • Proforma of Conveyance Deed#New(2025-12-25)
    View
  • Waste Disposal Plan#New(2026-01-17)
    View
  • Water Supply Plan#New(2026-01-17)
    View
  • Electricity Supply Plan#New(2026-01-17)
    View
  • Development Work Plan#New(2026-02-06)
    View
  • Affidavit (Form-B)#New(2026-02-04)
    View
  • CA CERTIFICATE#New(2026-01-17)
    View
  • ARCHITECT CERTIFICATE#New(2026-02-06)
    View
  • ENGINEERS CERTIFICATE#New(2026-01-17)
    View
  • Other#New(2026-03-19)
    View
  • Proforma of Agreement for Sale#New(2026-03-24)
    View

Land documents

  • Lease Deed#34217(2014-11-14)
    18616345568.pdf
    View
  • Lease Deed#11418(2015-05-27)
    18616344214.pdf
    View
  • Allotment Letter issued by Competent Authority#Prop/Commercial/2014/2911(2014-07-17)
    18616343681.pdf
    View
  • Lease Deed#GN/Commercial/2025/6736(2025-04-25)
    18616348043.pdf
    View

Project Team

Architect AddressArcop Associates Private Limited, Plot 36B, Sector 32, Gururgram, Haryana 122001
Engineer Address20, Central Lane, Babar Road, New Delhi 110001

Developer & Contact

Developer

Promoter NameAR LANDCRAFT LLP
Promoter AddressUM House, 3rd Floor, Plot No. 35P, UM House, Sector-44, Gurgaon, Haryana – 122002
Company TypeLimited Liability Partnership (LLP)
Mobile8800010790
Emailnoticecrest_ggl@godrejproperties.com
Registered AddressUM House, 3rd Floor, Plot No. 35P, UM House, Sector-44, Gurgaon, Haryana – 122002
Contractor AddressShiv Shakti Complex Nagli, Wajidpur, Sector-135, Noida, GN Nagar - 201304

Bank Accounts

Account Typecollection
Account Number777705754509
Account NameAR Landcraft LLP Collection Account for Crown Residences at Godrej Golf Links
Bank NameICICI Bank
BranchSector 18, Noida
Branch AddressICICI Bank Ltd, K1, Senior Mall, Sector 18, Noida, Uttar Pradesh 201301
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCICIC0000031
Branch Emailkashif.salaar@icicibank.com
Account Typeseparate
Account Number777705754510
Account NameAR Landcraft LLP Separate Account for Crown Residences at Godrej Golf Links
Bank NameICICI Bank
BranchSector 18, Noida
Branch AddressICICI Bank Ltd, K1, Senior Mall, Sector 18, Noida, Uttar Pradesh 201301
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCICIC0000031
Account Typetransaction
Account Number777705754511
Account NameAR Landcraft LLP RERA Transaction Account for Crown Residences at Godrej Golf Links
Bank NameICICI Bank
BranchSector 18, Noida
Branch AddressICICI Bank Ltd, K1, Senior Mall, Sector 18, Noida, Uttar Pradesh, 201301
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCICIC0000031

Development & Facilities

Development works

Demarcation Of PlotsREP-1, Sector- 27, Greater Noida Number of Plot- 1No., Size of Plot- 18166 Sqmtr, Total Area Demarcated- 18166 Sqmtr
Boundary WallMade of RCC, Brick work with MS Railing and Gates, Boundary Wall of 2100 MM Height with MS Railing Total length of boundary wall- 145 Mtr, Height of boundary wall- 2.1 Mtr, 1.8 Mtr, Type of boundary wall- RCC wall with MS
Road WorkTotal proposed work development would be made of Bitumen, Tremix concreate and Pavers over WMM/WBM. Total road length- 120 Mtr, Total road width- 16Mtr, No. of lanes- 2 No., Type of pavement- Hard
FootpathsThe proposed development will be having pavers, natural stones like Granite/Marble and Tiles etc. on Foothpaths/Along Side Roads
Water Supply Including Drinking Water FacilitiesWater supply shall be provided by GNIDA. The water is treated through an adequately sized Water Treatment Plant (WTP), designed to meet the daily water demand
Sewer SystemSewarage and Sullage are treated through a Multi- Stage Process in Sewage Treatment Plant (STP). The treatment process include screening and grit removal, primary settling of solids , biological breakdown of organic matter, disinfection and advance filtration treatment. Sludge is separated and disposed of or reused as per applicable norms. The final treated water (Effluent) is reused for flushing water, horticulture and excess water will be discharged as per design and statutory requirements. MBBR technology is adopted as the most appropriate treatment process.
DrainThe overflow from the rainwater harvesting pits shall be discharged into the GNIDA Storm Water Drainage System. Three (03) Rainwater harvesting pits are proposed within the project premises for effective groundwater reharge.
ParksGreen Area is being provided as per GNIDA Approved MLP for REP 1
Tree PlantingEvergreen tree planting as per GNIDA Approved MLP for REP 1
Design For Electric Supply Including Street LightingThe Electrical Load has been calculated as per the prevailing applicable norms. Energy-Efficient and LED Street Lighting is proposed for internal roads, pathways and common areas to minimize energy consumption. Adequate electrical infrastructure is provided to ensure reliable power supply and operational efficiency. Load management, proper distribution and energy-efficient system is proposed reduce overall energy demand and improve sustainability.
Community BuildingsPart of Overall Site.
Treatment And Disposal System Of Sewage And Sullage WaterSewage and Sullage are treated through a Multi-Stage Process in the Sewage Treatment Plant (STP) equipped with an advance filtration system. Sullage will be separated and suitably reused or disposed of while the final treated water shall be reused for toilet flushing, gardening, etc. A separate kitchen waste line is proposed, which is connected to the grease trap to remove oil and grease prior treatment.
Solid Waste Management And Disposal SystemSolid waste shall be segregated at source into biodegradable, recyclable, and inert categories as per applicable norms. Biodegradable waste shall be treated on-site through the Organic Waste Converter (OWC) Plant. Recyclable waste shall be sent to authorize recyclers while inert and residual waste shall be disposed of at authorized processing and disposal facilities.
Water Conservation SystemEfficient techniques and technologies are adopted to manage water resources effectively with the objective of reducing wastage. Rainwater harvesting system is implemented and water consumption is minimized using Low-Flow Plumbing Fixtures.
Energy Management System Including Use Of Renewable EnergyThe Energy distribution system is optimized to minimize losses and reduce overall energy consumption through the use of low-energy-efficient lighting fixtures and other energy-saving measures. Renewable Energy systems such as solar panels are installed. Additionally, heat-efficient glazing is provided to reduce heat gain and improve overall energy efficiency of the building.
Fire Protection And Fire Safety SystemA comprehensive fire safety system comprising a combination of strategies, equipment, and protocols are implemented to prevent, detect, control and suppress fire, ensuring the safety of occupants and protection of property. The fire safety system include both active and passive fire protection measures. Active fire protection systems comprise of fire alarm and detection systems, automatic sprinkler systems and portable fire extinguishers. Passive fire protection measures includes the use of fire-resistant materials, fire barriers and compartmentation to contain and limit the spread of fire. All fire safety installations are designed and installed in accordance with the applicable provisions of the National Building Code (NBC) to ensure effective fire prevention, early detection and efficient firefighting arrangements.
Social Infrastructure And Other Public Amenities Including Public Health ServicesPhysical facilities and services that support public well being such as handicapped toilet, public toilet, drinking water facilities etc,. The total no. of toilets are given as per statutory requirements.
Emergency Evacuation ServicesTo move people from high risk location to safe areas like fire refugee balconies, fire escape stair cases have been provided as per NBC norms.
Other Miscellaneous WorkNot Applicable

Financials

Registration Fee (₹)96000
Project Duration (months)55