CYBER PARK
by Elegant IT Solutions Private Limited
Gautam Buddha Nagar, Uttar Pradesh · UPRERAPRJ533406/10/2025
Total units
648
Overview
Registration Date2025-10-08
RERA NumberUPRERAPRJ533406/10/2025
Promoter IDUPRERAPRM361321
Proposed Start2025-04-10
Proposed Completion2030-03-17
Location
DistrictGautam Buddha Nagar
TehsilDadri
VillageKNOWLEDGE PARK V
LocalityGREATER NOIDA (W),
AddressPLOT NO 6,
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units648
Unit Types1
Blocks1
Floors27
Khasra records (1)
- 06,Sector-Knowledge Park -5, Greater Noida· Plot· 8096118 m²
Inventory
Apartments (27 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| CYBER PARK | 1 | STUDIO | 24 | 309 | 1 | — |
| CYBER PARK | 2 | STUDIO | 24 | 309 | 1 | — |
| CYBER PARK | 3 | STUDIO | 24 | 309 | 1 | — |
| CYBER PARK | 4 | STUDIO | 24 | 309 | 1 | — |
| CYBER PARK | 5 | STUDIO | 24 | 309 | 1 | — |
| CYBER PARK | 6 | STUDIO | 24 | 309 | 1 | — |
| CYBER PARK | 7 | STUDIO | 24 | 309 | 1 | — |
| CYBER PARK | 8 | STUDIO | 24 | 309 | 1 | — |
| CYBER PARK | 9 | STUDIO | 24 | 309 | 1 | — |
| CYBER PARK | 10 | STUDIO | 24 | 309 | 1 | — |
| CYBER PARK | 11 | STUDIO | 24 | 309 | 1 | — |
| CYBER PARK | 12 | STUDIO | 24 | 309 | 1 | — |
| CYBER PARK | 13 | STUDIO | 24 | 309 | 1 | — |
| CYBER PARK | 14 | STUDIO | 24 | 309 | 1 | — |
| CYBER PARK | 15 | STUDIO | 24 | 309 | 1 | — |
| CYBER PARK | 16 | STUDIO | 24 | 309 | 1 | — |
| CYBER PARK | 17 | STUDIO | 24 | 309 | 1 | — |
| CYBER PARK | 18 | STUDIO | 24 | 309 | 1 | — |
| CYBER PARK | 19 | STUDIO | 24 | 309 | 1 | — |
| CYBER PARK | 20 | STUDIO | 24 | 309 | 1 | — |
| CYBER PARK | 21 | STUDIO | 24 | 309 | 1 | — |
| CYBER PARK | 22 | STUDIO | 24 | 309 | 1 | — |
| CYBER PARK | 23 | STUDIO | 24 | 309 | 1 | — |
| CYBER PARK | 24 | STUDIO | 24 | 309 | 1 | — |
| CYBER PARK | 25 | STUDIO | 24 | 309 | 1 | — |
| CYBER PARK | 26 | STUDIO | 24 | 309 | 1 | — |
| CYBER PARK | 27 | STUDIO | 24 | 309 | 1 | — |
Permits & Approvals
Permit NoPLG/BP-SM-04-DEC-2024;23257
Permit Date2025-04-11
Valid Until2030-03-17
Extendable Until2033-03-16
Documents
Filing documents
- Proforma of Completion Certificate(Occupancy)
- Details of Encumbrances#New(2025-08-30)View
- Commencement Certificate#New(2025-08-29)View
- Other Plan(If Any)#New(2025-08-29)View
- Proforma of Application Form#New(2025-08-29)View
- Proforma of Allotment Letter#New(2025-08-30)View
- Proforma of Conveyance Deed#New(2025-08-30)View
- Waste Disposal Plan#New(2025-08-29)View
- Water Supply Plan#New(2025-08-29)View
- Electricity Supply Plan#New(2025-08-29)View
- Development Work Plan#New(2025-08-29)View
- Affidavit (Form-B)#New(2025-08-30)View
- CA CERTIFICATE#New(2025-09-25)View
- ARCHITECT CERTIFICATE#New(2025-09-24)View
- ENGINEERS CERTIFICATE#New(2025-09-24)View
- Other#New(2025-08-29)View
- Proforma of Agreement for Sale#New(2025-09-25)View
Land documents
- Lease Deed#18767(2015-09-08)View17162707101.pdf
Project Team
Architect Address1134 11TH FLOOR GAUR CITY MALL
Engineer Address1134 11TH FLOOR GAUR CITY MALL NOIDA EXTENSION
Developer & Contact
Developer
Promoter NameElegant IT Solutions Private Limited
Promoter AddressA-97, Shop no-05, Ground Floor, Pandav Nagar, East Delhi, Shahdara, Delhi-110092.
Company TypeCompany
Mobile8130126270
Emailrera.elegant@gmail.com
Registered AddressA-97, Shop no-05, Ground Floor, Pandav Nagar, East Delhi, Shahdara, Delhi-110092.
Contractor AddressRADHA BUILDTECH INDIA PVT. LTD. GF-27, GAUR SAUNDARYAM , TECHZONE 4, GREATER NOIDA--
Bank Accounts
Account Typecollection
Account Number414605002226
Account NameELEGANT IT SOLUTIONS PRIVATE LIMITED COLLECTION ACCOUNT FOR CYBER PARK
Bank NameICICI Bank Ltd.
BranchCHERRY COUNTY
Branch AddressSHOP NO. 9A, 9B, CHERRY COUNTY , TECHZONE -4 GR. NOIDA WEST, GAUTAMBUDH NAGAR, U.P. - 201306
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCICIC0004146
Branch Emailmajithia.sahil@icicibank.com
Account Typeseparate
Account Number414605002227
Account NameELEGANT IT SOLUTIONS PRIVATE LIMITED SEPARATE BANK ACCOUNT FOR CYBER PARK
Bank NameICICI Bank Ltd.
BranchCHERRY COUNTY
Branch AddressSHOP NO. 9A, 9B, CHERRY COUNTY , TECHZONE -4 GR. NOIDA WEST GAUTAMBUDH NAGAR,U.P.- 210306
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCICIC0004146
Account Typetransaction
Account Number414605002228
Account NameELEGANT IT SOLUTIONS PRIVATE LIMITED RERA TRANSACTION ACCOUNT FOR CYBER PARK
Bank NameICICI Bank Ltd.
BranchCHERRY COUNTY
Branch AddressSHOP NO. 9A, 9B, CHERRY COUNTY TECHZONE -4 GR. NOIDA WEST, GAUTAMBUDH NAGAR, U.P.-201306
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCICIC0004146
Development & Facilities
Development works
Demarcation Of PlotsSubject to project residential plot area6041 sq. m Plot no. 06, sector knowledge park -5 , Greater Noida . Proper demarcation of plots will be done, with all fixed four point showing road , plot area and other services also.
Boundary WallThe Plot is enclosed on three sides with a 6ft high RCC and brick wall, Brick Masonry wall have been construction with isolated footing , columns and plinth beam along with plaster on both sides and grill on the top.
Road WorkComplete Black top (Bituminous ) Road will be constructed all along the defined location in the approved drawings with standard specification.
FootpathsFootpaths are 150mm above road level, finished with interlocking tiles and curb stones for structural strength and safe Pedestrain use. Footpaths will be constructed all along the road/ Green area as designed with specific Pavers/Stone on top.
Water Supply Including Drinking Water FacilitiesDrinking water will be sourced through a borewell with 2 nos of 2 lakh ltrs, and stored in underground and overhead ranks to ensure Water supply will be given to all individuals through underground water tank with proper Filterization plant.
Sewer SystemRCC/HDPE pipes will be used for the sewage system , designed as per approved drawings and relevant standards Proper Sewer System will be constructed embedded with sewer treatment plant.
DrainStrom Water Drains using RCC /HDPE 300mm pipes will be laid as per the approved design to prevent waterclogging and ensure proper discharge.
ParksProposed Park area is 28678.71sqmt. includes hard and soft landscaping with lawns, walkways, 400nos, evergreen tree and 400 nos of ornmrntal tree plantations , and electrical lighting for Complete Greenery will be developed as per approved landscaping drawings.
Tree PlantingVarious tree species have been planted across the site based on soil and climatic conditions to improve All Trees / Shrubs / Hedging will be planted as required in approved drawings. 400 nos. of evergreen tree and 400 nos of ornmrntal tree species have been planted across the site based on soil and climatic conditions to improve All Trees/Shrubs/Hedging will be
Design For Electric Supply Including Street LightingHT supply from UPPCL ; sub station installed as ESS-1 3 NOS 2500 KVA TRANSFORMER ESS -2 4 NOS 2500 KVA TRANSFORMER ESS -3 1 NOS 500 KVA TRANSFORMER SHOWN IN ELECTRICAL LAYOUT . AS per approved plan . LT supply to each unit with DG backup, street lighting via LT/Power Backup. Electrical supply will be given to all individuals at single point from developed substation as per norms. Proper street lighting will be done as per requirement and approved drawings.
Community BuildingsNot Applicable as per Greater Noida Development Industrial Authority (GNIDA) norms; no community building is required or not NOT Applicable.
Treatment And Disposal System Of Sewage And Sullage WaterWe will develop the STP in the first phase itself , so that all the phase can be develop smoothly. Disposal system of sewage sullage water is being use through a STP will be your for land scape and flushing purpose.
Solid Waste Management And Disposal SystemWaste will be manually collected and segregated at source. Disposal will be as per the Municipal and Solid Waste Management System will be installed in a separate dedicated space to full fill all the required criteria.
Water Conservation SystemRainwater harvesting system will be installed to collect and recharge groundwater in line with environmental Low flow water mixture being used for water conservation and STP water will be use for land scape and flushing purpose.
Energy Management System Including Use Of Renewable EnergyHigh quality equipment will be used in the sub - station to reduce energy loss. solar power system will be installed as per approved drawings . As specific Y_ value glass has been use for energy management and roof insulation light colour tiles will be use for renewal energy solar photo boltaic energy have been use for comman area
Fire Protection And Fire Safety SystemFire Fighting system with hydrants , sprinklers , and alarms will be installed will be installed ; Fire escape stairs provided as per the NOC and approved plans .fire system and fire safety system will be installed in the building as per NBC norms.
Social Infrastructure And Other Public Amenities Including Public Health ServicesPublic health and other social infrastructure facilities are not applicable as per GDA norms and project classification. Social Infrastructure and other public amenities including public health services as per approved plan.
Emergency Evacuation ServicesFire escape staircases and refuge areas will be provided as per NBC norms to ensure safe evacuation during Emergencies. As per the disaster management and approved plan.
Other Miscellaneous WorkMiscellaneous work will be carried out as needed during development , following all relevant standards and approved plan. Not Applicable
Financials
Registration Fee (₹)71000
Project Duration (months)60