DLF Techpark Noida Phase 2

by URVASI INFRATECH PRIVATE LIMITED

Gautam Buddha Nagar, Uttar Pradesh · UPRERAPRJ385951/08/2024

Registered

Total units

26

Overview

Registration Date2024-08-16
RERA NumberUPRERAPRJ385951/08/2024
Promoter IDUPRERAPRM190453
Proposed Start2023-04-01
Proposed Completion2026-09-30

Location

DistrictGautam Buddha Nagar
TehsilDadri
VillagePlot No.1
LocalitySector 143A, Noida, Gautam Buddha Nagar, U.P
AddressPlot No. 1, Sector 143A, Noida, Gautam Buddha Nagar, U.P
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Total Units26
Unit Types1
Blocks2
Floors13

Khasra records (1)

  • Plot No. 1, Sector 143 A, Noida· Plot· 2479604

Inventory

Apartments (26 rows)
BlockFloorTypeCountCarpet (m²)BalconyGarage
Block DGFOTHER14787.3680
Block D1OTHER14352.0780
Block D2OTHER14352.0780
Block D3OTHER14352.0780
Block D4OTHER14352.0780
Block D5OTHER14352.0780
Block D6OTHER14352.0780
Block D7OTHER14373.2280
Block D8OTHER14352.0780
Block D9OTHER14373.2280
Block D10OTHER14373.2280
Block D11OTHER14373.2280
Block D12OTHER14373.2280
Block EGFOTHER14787.3680
Block E1OTHER14352.0780
Block E2OTHER14352.0780
Block E3OTHER14352.0780
Block E4OTHER14352.0780
Block E5OTHER14352.0780
Block E6OTHER14352.0780
Block E7OTHER14373.2280
Block E8OTHER14352.0780
Block E9OTHER14373.2280
Block E10OTHER14373.2280
Block E11OTHER14373.2280
Block E12OTHER14373.2280

Permits & Approvals

Permit NoNOIDA/CAP/2021/V-720/720
Permit Date2021-11-26
Valid Until2026-11-25
Extendable Until2029-11-25

Documents

Filing documents

  • Proforma of Completion Certificate(Occupancy)
  • General body resolution for AoA (if Authorized Entity is AoA)
  • Notarized Affidavit for completion of balance development work
  • Other
  • Details of Encumbrances#New(2024-07-01)
    View
  • Commencement Certificate#New(2024-04-01)
    View
  • Other Plan(If Any)#New(2024-04-01)
    View
  • Proforma of Application Form#New(2024-04-01)
    View
  • Proforma of Allotment Letter#New(2024-04-01)
    View
  • Proforma of Conveyance Deed#New(2024-04-01)
    View
  • Waste Disposal Plan#New(2024-04-06)
    View
  • Water Supply Plan#New(2024-04-06)
    View
  • Electricity Supply Plan#New(2024-04-06)
    View
  • Development Work Plan#New(2024-04-01)
    View
  • Affidavit (Form-B)#New(2024-05-02)
    View
  • CA CERTIFICATE#New(2024-04-01)
    View
  • ARCHITECT CERTIFICATE#New(2024-05-08)
    View
  • ENGINEERS CERTIFICATE#New(2024-05-08)
    View
  • Proforma of Agreement for Sale#New(2024-04-01)
    View

Land documents

  • Lease Deed#897(2008-03-25)
    10198947029.pdf
    View
  • Extract of Khatauni#Merger of Land by way of amalgamation - DLF Commercial to DLF Home Developers(1900-01-01)
    10198943663.pdf
    View
  • Extract of Khatauni#Land Transfer to Urvasi Infratech - by DLF Home Developers(1900-01-01)
    10198942926.pdf
    View
  • Extract of Khatauni#Subsidiary Relationship between DLF home Developers and DLF Commercial(1900-01-01)
    10198942735.pdf
    View
  • Extract of Khatauni#Subsidiary Relationship between DLF home Developers and Urvasi Infratech(1900-01-01)
    10198946539.pdf
    View
  • Extract of Khatauni#No Dues Certificate - Lease Payment - Urvasi Infratech(1900-01-01)
    10198949628.pdf
    View
  • Extract of Khatauni#Board Resolution authorizing Rajeev Singh as Authorized Signatory for RERA(1900-01-01)
    10198943678.pdf
    View
  • Extract of Khatauni#Scheme of Arrangement sanctioned by Honble High Court as per order dated 11.01.2011(1900-01-01)
    10198947389.pdf
    View
  • Lease Deed#5730(2011-08-04)
    10198942257.pdf
    View

Project Team

Architect AddressE-1, Block E, Sector 55, Noida
Engineer Address1/11042 STREET NO.7 SUBASH PARK, NAVIN SHAHDARA, DELHI 110032

Developer & Contact

Developer

Promoter NameURVASI INFRATECH PRIVATE LIMITED
Promoter Address12TH FLOOR, DLF GATEWAY TOWER, DLF CITY, PHASE-III NATIONAL HIGHWAY NO. 8 GURGAON 122002 HR
Company TypeCompany
Mobile9599955126
Emailaggarwal-kshitij@dlf.in
Registered Address12TH FLOOR, DLF GATEWAY TOWER, DLF CITY, PHASE-III NATIONAL HIGHWAY NO. 8 GURGAON 122002 HR
Contractor AddressSCO-34, First Floor, Sector-11, DLF, Faridabad-121006

Bank Accounts

Account Typecollection
Account Number342005000156
Account NameUrvasi Infratech Private Limited - Collection A/c - DLF Techpark Noida Phase 2
Bank NameICICI Bank
BranchK1, Senior Mall, Sec 18, Noida, Uttar Pradesh, 201301
Branch AddressK1, Senior Mall, Sec 18, Noida, Uttar Pradesh, 201301
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCICIC0000031
Branch Emailshweta.sin@icicibank.com
Account Typeseparate
Account Number342005000157
Account NameUrvasi Infratech Private Limited-Separate A/c-DLF Techpark Noida Phase 2
Bank NameICICI Bank
BranchK1, Senior Mall, Sec 18, Noida, Uttar Pradesh, 201301
Branch AddressK1, Senior Mall, Sec 18, Noida, Uttar Pradesh, 201301
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCICIC0000031
Account Typetransaction
Account Number342005000158
Account NameUrvasi Infratech Private Limited-Transaction A/c-DLF Techpark Noida Phase 2
Bank NameICICI Bank
BranchK1, Senior Mall, Sec 18, Noida, Uttar Pradesh, 201301
Branch AddressK1, Senior Mall, Sec 18, Noida, Uttar Pradesh, 201301
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCICIC0000031

Development & Facilities

Development works

Demarcation Of PlotsWe have 3 side road plot of total size 100256 sq. mtr. (proposed project covered 33310 sq. mtr.) having 3 entrance gate towards east side (45 m. wide road), 2 entrance gate towards south side (45 m . Wide road) and 1 entrance gate towards west side (30 m. Wide road)
Boundary Wall"Data Centre 2 - The total boundary wall height is 2400mm and barbed wire above. (Data Centre 3) - The total boundary wall height is 2400mm and barbed wire above."
Road WorkData Centre 2 & 3) - Minimum 6M wide driveways are planned in tremix.
Footpaths" Data Centre 2 & 3) - Barrier free pedestrian movement is planned to connect different areas while avoiding vehicular clashes."
Water Supply Including Drinking Water Facilities(Data Centre 2 &3 )Treated water supply is provided through WTP Plant Room.
Sewer System"Combined STP Provided for Data Centre 1,IT Block of Phase 1 & Data Centre 2 also. MBBR STP provided in Campus."
DrainStorm water drainage provided. Storm water from Terrace, Roads and other landscape area shall be connected to Storm water drain channel with its further connectivity to Rain water harvesting Pit for recharge the Ground water. Overflow from RWH Pit shall be connected to Municipal drain line.
Parks" Data Centre 2 & 3) - Green area is planned along plot line and along the building. Multipurpose lawn is also planned."
Tree Planting" Data Centre 2 &3) - Trees are planned along boundary wall as buffer planting. Trees are also planned along building."
Design For Electric Supply Including Street Lighting"Common Area and Base Build lighting shall be Planned . As far as concern of High Side electrical System shall be deigned by STT(Client) We will design & implement Electrical System as per NBC Code/ Local Electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, Fountain, STP, Pump room etc."
Community BuildingsNot proposed
Treatment And Disposal System Of Sewage And Sullage WaterMBBR STP provided in Campus. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system, when would come into force.
Solid Waste Management And Disposal System" Block B - Combined STP Provided for Data Centre1 ,IT Block of Phase 1 and Data Centre 2 also"
Water Conservation SystemProject shall be planned with low flow fixtures as well dual flush cistern. Further rainwater harvesting system is also proposed to improve the ground water level.
Energy Management System Including Use Of Renewable Energy" Data Centre 2 & 3 - We have provided LED Lighting for common area and external infra. Solar power generation we are using."
Fire Protection And Fire Safety SystemFire Fighting and Fire Protection system is planned in campus as per NBC Code.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot proposed.
Emergency Evacuation ServicesFire staircase shall be provided. And Refuse area shall also be provided as part of emergency evacuation services.
Other Miscellaneous WorkNot proposed

Financials

Registration Fee (₹)258000
Project Duration (months)42