DWARIKA BALAJI PHASE- 4

by DWARIKA BALAJI

Muzaffarnagar, Uttar Pradesh · UPRERAPRJ608419

Registered

Overview

Registration Date2021-12-22
RERA NumberUPRERAPRJ608419
Promoter IDUPRERAPRM13063
Proposed Start2019-10-01
Proposed Completion2026-10-10

Location

DistrictMuzaffarnagar
TehsilMuzaffarnagar
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Plots90

Khasra records (4)

  • 49· Khasra· 32549
  • 53· Khasra· 266565
  • 54· Khasra· 666886
  • 58· Khasra· 481341

Inventory

Plots

TypeSize rangeCount
Plot100 to 150 sqm88
Plot150 to 200 sqm2

Permits & Approvals

Permit No49/2021
Permit Date2021-10-12
Valid Until2026-10-10
Extendable Until2029-10-11

Documents

Filing documents

  • Details of Encumbrances
  • Commencement Certificate
  • Other Plan(If Any)
  • Proforma of Application Form
  • Proforma of Allotment Letter
  • Proforma of Conveyance Deed
  • Proforma of Completion Certificate(Occupancy)
  • Waste Disposal Plan
  • Details of Encumbrances#New(2021-12-16)
    View
  • Other Plan(If Any)#New(2021-12-08)
    View
  • Proforma of Application Form#New(2021-12-16)
    View
  • Proforma of Allotment Letter#New(2021-12-16)
    View
  • Proforma of Conveyance Deed#New(2021-12-16)
    View
  • Water Supply Plan#New(2021-11-16)
    View
  • Electricity Supply Plan#New(2021-11-16)
    View
  • Development Work Plan#New(2021-11-16)
    View
  • Affidavit (Form-B)#New(2021-11-16)
    View
  • CA CERTIFICATE#New(2021-11-16)
    View
  • ARCHITECT CERTIFICATE#New(2021-11-16)
    View
  • ENGINEERS CERTIFICATE#New(2021-11-16)
    View

Land documents

  • Registry Document#1714(2008-02-14)
    3302591035Khsara No.53-1714.pdf
    View
  • Registry Document#11891(2010-10-20)
    3302593846Khasra No.49-51-11891.pdf
    View
  • Registry Document#2054(2008-02-22)
    3302596814Khsara No.54-2054.pdf
    View
  • Registry Document#13528(2010-12-09)
    3302597689Khsara No.54-13528.pdf
    View
  • Registry Document#12142(2007-11-26)
    3302598522Khasra No. 58-12142.pdf
    View
  • Registry Document#6307(2008-05-29)
    3302599152Khsara No58-6307.pdf
    View
  • Extract of Khatauni#2021(1900-01-01)
    3302591287EncubranceCert.pdf
    View
  • Registry Document#192(2007-12-10)
    3302599510Consortium.pdf
    View

Project Team

Architect AddressTOWN HALL ROAD, NEAR PEACE LIBRARY, ARYA PURI , MUZAFFAR NAGAR
Engineer AddressC-55 EAST OF KAILASH, NEW DELHI 110065

Developer & Contact

Developer

Promoter NameDWARIKA BALAJI
Promoter Address2, Park End, Vikas Marg, Delhi-110092
Company TypeAssociation Of Persons (AOP)
Mobile7351448000
Emaildwarikabalaji@gmail.com
Registered Address2, Park End, Vikas Marg, Delhi-110092
Contractor Address4th Miles Stone, Jansath Road, Muzaffar Nagar, Uttar Pradesh

Development & Facilities

Development works

Demarcation Of PlotsDemarcation of Plots is done by 4 inch brick work.
Boundary WallThis phase is surrounded by other land to come under other phases in same project.
Road Work410 running meter bitumin roads are under construction on site.
Footpaths820 running meter of footpath is provisioned to be made on site.
Water Supply Including Drinking Water FacilitiesDrinking water supply line of 680 running meter is under construction.
Sewer System340 running meter underground sewer line is laid in this phase which is connected with main sewer line which is further connected with common sewerage treatment plant of 250x4 KLD.
Drain840 running meter Open storm water drain are provisioned to be made on site.
ParksPark area is provisioned in the integrated township as a whole of which this project is a part
Tree PlantingGreen Area and tree plantation is provisioned in the integrated township as a whole of which this project is a part.
Design For Electric Supply Including Street Lighting32 Electricity poles with street lights are provisioned under this phase. The poles are already errected and street lights will be installed shortly. Electricity supply is provisioned from Common electric sub station of 10 MV provisioned for the integrated township as a whole.
Community BuildingsAs it is provisioned in the integrated township as a whole.
Treatment And Disposal System Of Sewage And Sullage WaterA separate sewage and sullage water disposal system of constructed
Solid Waste Management And Disposal SystemSeparate Solid waste management and disposal system is provisioned in the integrated township as a whole of which this project is a part.
Water Conservation SystemTo ponds for water conservation are provisioned in the integrated township of which this phase is a part.
Energy Management System Including Use Of Renewable EnergyStreet lights are provided with some backup points. Further electric sub station is provisioned in the integrated township of which this phase is a part.
Fire Protection And Fire Safety SystemAs it is plotted development, therefore fire protection system is not provisioned within the project but water filling point is provided in the integrated township of which this phase is a part.
Social Infrastructure And Other Public Amenities Including Public Health ServicesAs this phase is a part of an integrated township therefore all amenities are provided as a whole under other various phases.
Emergency Evacuation ServicesAs it is plotted development therefore no emergency evacuation is required.
Other Miscellaneous WorkCompleted Soil Filling etc.

Financials

Registration Fee (₹)77500
Project Duration (months)85