Eiffel Vivassa Estate Phase 2

by EIFFEL INFRADEVELOPERS PRIVATE LIMITED

Lucknow, Uttar Pradesh · UPRERAPRJ929171

Registered

Total units

108

Overview

Registration Date2019-09-21
RERA NumberUPRERAPRJ929171
Promoter IDUPRERAPRM84896
Proposed Start2019-07-01
Proposed Completion2025-12-25

Location

DistrictLucknow
TehsilMohanlalganj
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Total Units108
Unit Types2
Blocks3
Floors12

Khasra records (1)

  • 481, 480KA, 479KA, 477, 615, 614(part) 616(part), 617(part)· Khasra· 981354

Inventory

Apartments (26 rows)
BlockFloorTypeCountCarpet (m²)BalconyGarage
REGAL-1GF4 BHK4181.9530
REGAL-114 BHK4181.9530
REGAL-124 BHK4181.9530
REGAL-134 BHK4181.9530
REGAL-144 BHK4181.9530
REGAL-154 BHK4181.9530
REGAL-164 BHK4181.9530
REGAL-174 BHK4181.9530
REGAL-184 BHK4181.9530
REGAL-194 BHK4181.9530
REGAL-1104 BHK4181.9530
REGAL-1114 BHK4181.9530
REGAL-214 BHK4181.9530
REGAL-224 BHK4181.9530
REGAL-234 BHK4181.9530
REGAL-244 BHK4181.9530
REGAL-254 BHK4181.9530
REGAL-264 BHK4181.9530
REGAL-274 BHK4181.9530
REGAL-284 BHK4181.9530
REGAL-294 BHK4181.9530
REGAL-2104 BHK4181.9530
REGAL-2114 BHK4181.9530
REGAL-2GF4 BHK4181.9530
CosmicGFSHOP618.3700
Cosmic1SHOP618.3700

Permits & Approvals

Permit NoMAP 20180719104540210
Permit Date2019-03-16
Valid Until2024-03-15
Extendable Until2024-03-15

Documents

Filing documents

  • Proforma of Completion Certificate(Occupancy)
  • Details of Encumbrances#New(2019-08-02)
    View
  • Commencement Certificate#New(2019-08-02)
    View
  • Other Plan(If Any)#New(2019-08-02)
    View
  • Proforma of Application Form#New(2019-08-06)
    View
  • Proforma of Allotment Letter#New(2019-08-22)
    View
  • Proforma of Conveyance Deed#New(2019-08-22)
    View
  • Waste Disposal Plan#New(2019-08-02)
    View
  • Water Supply Plan#New(2019-08-02)
    View
  • Electricity Supply Plan#New(2019-08-22)
    View
  • Development Work Plan#New(2019-08-02)
    View
  • Affidavit (Form-B)#New(2019-08-02)
    View
  • CA CERTIFICATE#New(2019-08-22)
    View
  • ARCHITECT CERTIFICATE#New(2019-08-02)
    View
  • ENGINEERS CERTIFICATE#New(2019-08-02)
    View

Land documents

  • Sale Deed#18456(2018-10-08)
    2061860331.pdf
    View
  • Sale Deed#6279(2019-03-27)
    2061828952.pdf
    View
  • Sale Deed#12015(2018-06-29)
    2061865743.pdf
    View
  • Sale Deed#9932(2018-05-29)
    2061839774.pdf
    View
  • Sale Deed#517(2018-01-11)
    2061854605.pdf
    View
  • Sale Deed#15002(2017-11-08)
    917952061854236.pdf
    View
  • Sale Deed#11764(2017-09-11)
    2061824537.pdf
    View
  • Sale Deed#11039(2017-08-29)
    2061817788.pdf
    View
  • Sale Deed#11040(2017-08-28)
    2061897869.pdf
    View

Project Team

Architect AddressVibhuti Khand, Lucknow
Engineer AddressD 27 Indra Nagar Lucknow

Developer & Contact

Developer

Promoter NameEIFFEL INFRADEVELOPERS PRIVATE LIMITED
Promoter Address10th Floor, Eldeco Corporate Chamber - II, Vibhuti Khand, Gomti Nagar, Lucknow
Company TypeCompany
Mobile9839025516
Emailskgarg@eiffelinfra.co.in
Registered Address10th Floor, Eldeco Corporate Chamber - II, Vibhuti Khand, Gomti Nagar, Lucknow
Contractor AddressPrabha Enterprises 182-C, Eldeco Udyan-1, Bangla Bazzar Lucknow 226002

Development & Facilities

Development works

Boundary Wall2.5 mt. high and 230 mm thick Boundary wall along with RCC columns to strengthen it has been proposed to be constructed along with entry gate complex.
Road WorkComplete CC internal road along with paver pathways is proposed to be constructed as per CPWD specifications for required load and width. Roads shall have some patterns using granite pavers at junctions and BLOCK entry points.
FootpathsAll internal roads to have 0.75m wide footpath in 40- 60 mm thick concrete/granite pavers or equivalent finishes.
Water Supply Including Drinking Water Facilitiesunderground water to be supplied through terrace tank.
Sewer SystemCentralized Sewerage system as per design shall be Provided. All Sewerage disposal shall be go to the STP for treatment and treated ,recycled water shall be used for gardening and complex washing. overflow from the STP shall be connected to the Municipal sewerage system.
DrainStorm water system as per design shall be Provided. Storm water from terrace tops, Roads and other landscape area shall be connected to the Storm water drain channel and go to the Rain water harvesting Pits to recharge the Ground water and overflow shall be connected to Municipal drainage on main 45 mt. road.
ParksHighly enriched green parks with grass cover and plantation/shrubs have been proposed on approved location. Facilities like open Gym and children play equipments to be part of green areas.
Tree Planting"There are 5 type of trees proposed at site: which are kachnar, gulmauhar, amaltas, kusum and neem."
Design For Electric Supply Including Street LightingA well designed electricity distribution system, as per norms of electricity Board, will be in place along with centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting,STP,Pump room etc. 20% street lighting shall have solar panel.
Community BuildingsClub Building With Basic Recreational Facilities Like Gym, Library And Common Room And Pool Facility. The Said Facility Will Be Shared By The Allottees Of Phase 2 Also.
Treatment And Disposal System Of Sewage And Sullage WaterCentralized Sewerage system shall be Provided. All Sewerage disposal shall be go to the STP for treatment and after treatment ,water shall be recycled and will used in gardening, washing and flushing system . Overflow from the STP shall be connected with the Municipal sewerage system.
Solid Waste Management And Disposal System"Proper garbage disposal/collection point has been proposed. Nagar Nigam to collect garbage from this point for the solid waste management."
Water Conservation SystemA well designed rain water harvesting system has been planned along with 6 no. recharge pits for the whole building complex to conserve water. Rain water from internal roads, roof tops and gardens shall be directed towards recharge pits through drain channels and pipes.
Energy Management System Including Use Of Renewable EnergyWe will use LED light fittings in external and common areas as well as 20% solar street lights. In STP and Pump room all the equipment shall have energy efficient motors/pumps.
Fire Protection And Fire Safety SystemSince the building is less than 45m in height all the fire norms shall be followed as NBC with the approval of fire department. A dedicated pipe line along with hydrants will be connected to wet risers. Terrace tanks shall have separate storage facility to store water for fire fighting.
Social Infrastructure And Other Public Amenities Including Public Health ServicesA creche for the children of labors during construction period with play and study facility. Temporary toilets for workers during construction period and emergency medical kit.
Emergency Evacuation ServicesExits from each and every point has been planned and proposed as per norms in case of emergency.
Other Miscellaneous WorkN.A.

Financials

Registration Fee (₹)53500
Project Duration (months)84