Eros Sampoornam 2

by AJAY ENTERPRISES PRIVATE LIMITED

Gautam Buddha Nagar, Uttar Pradesh · UPRERAPRJ301564

Registered

Total units

378

Overview

Registration Date2021-11-25
RERA NumberUPRERAPRJ301564
Promoter IDUPRERAPRM68534
Proposed Start2020-02-01
Proposed Completion2025-09-30

Location

DistrictGautam Buddha Nagar
TehsilGautam Buddha Nagar
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Total Units378
Unit Types3
Blocks6
Floors17

Khasra records (1)

  • GH-01· Plot· 9837375

Inventory

Apartments (315 rows)
BlockFloorTypeCountCarpet (m²)BalconyGarage
A3BSMNTOTHER000
A3GFOTHER000
A313 BHK297.015
A313 BHK299.35
A323 BHK297.015
A323 BHK299.35
A333 BHK297.015
A333 BHK299.35
A343 BHK297.015
A343 BHK299.35
A353 BHK297.015
A353 BHK299.35
A363 BHK297.015
A363 BHK299.35
A373 BHK297.015
A373 BHK299.35
A383 BHK297.015
A383 BHK299.35
A393 BHK297.015
A393 BHK299.35
A3103 BHK297.015
A3103 BHK299.35
A3113 BHK297.015
A3113 BHK299.35
A3123 BHK297.015
A3123 BHK299.35
A3133 BHK297.015
A3133 BHK299.35
A3143 BHK297.015
A3143 BHK299.35
A3153 BHK297.015
A3153 BHK299.35
G7BSMNTOTHER000
G7GFOTHER000
G713 BHK279.294
G713 BHK273.354
G713 BHK278.234
G723 BHK279.294
G723 BHK273.354
G723 BHK278.234
G733 BHK279.294
G733 BHK273.354
G733 BHK278.234
G743 BHK279.294
G743 BHK273.354
G743 BHK278.234
G753 BHK279.294
G753 BHK273.354
G753 BHK278.234
G763 BHK279.294
G763 BHK273.354
G763 BHK278.234
G773 BHK279.294
G773 BHK273.354
G773 BHK278.234
G783 BHK279.294
G783 BHK273.354
G783 BHK278.234
G793 BHK279.294
G793 BHK273.354
G793 BHK278.234
G7103 BHK279.294
G7103 BHK273.354
G7103 BHK278.234
G7113 BHK279.294
G7113 BHK273.354
G7113 BHK278.234
G7123 BHK279.294
G7123 BHK273.354
G7123 BHK278.234
G7133 BHK279.294
G7133 BHK273.354
G7133 BHK278.234
G7143 BHK279.294
G7143 BHK273.354
G7143 BHK278.234
G7153 BHK279.294
G7153 BHK273.354
G7153 BHK278.234
B4BSMNTOTHER000
B4GFOTHER000
B413 BHK185.885
B413 BHK185.885
B413 BHK185.95
B413 BHK185.95
B423 BHK185.885
B423 BHK185.885
B423 BHK185.95
B423 BHK185.95
B433 BHK185.885
B433 BHK185.885
B433 BHK185.95
B433 BHK185.95
B443 BHK185.885
B443 BHK185.885
B443 BHK185.95
B443 BHK185.95
B453 BHK185.885
B453 BHK185.885
B453 BHK185.95
B453 BHK185.95
B463 BHK185.885
B463 BHK185.885
B463 BHK185.95
B463 BHK185.95
B473 BHK185.885
B473 BHK185.885
B473 BHK185.95
B473 BHK185.95
B483 BHK185.885
B483 BHK185.885
B483 BHK185.95
B483 BHK185.95
B493 BHK185.885
B493 BHK185.885
B493 BHK185.95
B493 BHK185.95
B4103 BHK185.885
B4103 BHK185.885
B4103 BHK185.95
B4103 BHK185.95
B4113 BHK185.885
B4113 BHK185.885
B4113 BHK185.95
B4113 BHK185.95
B4123 BHK185.885
B4123 BHK185.885
B4123 BHK185.95
B4123 BHK185.95
B4133 BHK185.885
B4133 BHK185.885
B4133 BHK185.95
B4133 BHK185.95
B4143 BHK185.885
B4143 BHK185.885
B4143 BHK185.95
B4143 BHK185.95
Y15BSMNTOTHER000
Y15GFOTHER000
Y1512 BHK149.43
Y1512 BHK149.43
Y1512 BHK161.753
Y1512 BHK161.753
Y1522 BHK149.43
Y1522 BHK149.43
Y1522 BHK161.753
Y1522 BHK161.753
Y1532 BHK149.43
Y1532 BHK149.43
Y1532 BHK161.753
Y1532 BHK161.753
Y1542 BHK149.43
Y1542 BHK149.43
Y1542 BHK161.753
Y1542 BHK161.753
Y1552 BHK149.43
Y1552 BHK149.43
Y1552 BHK161.753
Y1552 BHK161.753
Y1562 BHK149.43
Y1562 BHK149.43
Y1562 BHK161.753
Y1562 BHK161.753
Y1572 BHK149.43
Y1572 BHK149.43
Y1572 BHK161.753
Y1572 BHK161.753
Y1582 BHK149.43
Y1582 BHK149.43
Y1582 BHK161.753
Y1582 BHK161.753
Y1592 BHK149.43
Y1592 BHK149.43
Y1592 BHK161.753
Y1592 BHK161.753
Y15102 BHK149.43
Y15102 BHK149.43
Y15102 BHK161.753
Y15102 BHK161.753
Y15112 BHK149.43
Y15112 BHK149.43
Y15112 BHK161.753
Y15112 BHK161.753
Y15122 BHK149.43
Y15122 BHK149.43
Y15122 BHK161.753
Y15122 BHK161.753
Y15132 BHK149.43
Y15132 BHK149.43
Y15132 BHK161.753
Y15132 BHK161.753
Y15142 BHK149.43
Y15142 BHK149.43
Y15142 BHK161.753
Y15142 BHK161.753
Y12BSMNTOTHER000
Y12GFOTHER000
Y1212 BHK149.43
Y1212 BHK149.43
Y1212 BHK161.753
Y1212 BHK161.753
Y1222 BHK149.43
Y1222 BHK149.43
Y1222 BHK161.753
Y1222 BHK161.753
Y1232 BHK149.43
Y1232 BHK149.43
Y1232 BHK161.753
Y1232 BHK161.753
Y1242 BHK149.43
Y1242 BHK149.43
Y1242 BHK161.753
Y1242 BHK161.753
Y1252 BHK149.43
Y1252 BHK149.43
Y1252 BHK161.753
Y1252 BHK161.753
Y1262 BHK149.43
Y1262 BHK149.43
Y1262 BHK161.753
Y1262 BHK161.753
Y1272 BHK149.43
Y1272 BHK149.43
Y1272 BHK161.753
Y1272 BHK161.753
Y1282 BHK149.43
Y1282 BHK149.43
Y1282 BHK161.753
Y1282 BHK161.753
Y1292 BHK149.43
Y1292 BHK161.753
Y1292 BHK161.753
Y1292 BHK149.43
Y12102 BHK149.43
Y12102 BHK149.43
Y12102 BHK161.753
Y12102 BHK161.753
Y12112 BHK149.43
Y12112 BHK149.43
Y12112 BHK161.753
Y12112 BHK161.753
Y12122 BHK149.43
Y12122 BHK149.43
Y12122 BHK161.753
Y12122 BHK161.753
Y12132 BHK149.43
Y12132 BHK149.43
Y12132 BHK161.753
Y12132 BHK161.753
Y12142 BHK149.43
Y12142 BHK149.43
Y12142 BHK161.753
Y12142 BHK161.753
H3BSMNTOTHER000
H3GFOTHER000
H312 BHK149.393
H312 BHK149.393
H312 BHK162.033
H312 BHK162.033
H322 BHK149.393
H322 BHK149.393
H322 BHK162.033
H322 BHK162.033
H332 BHK149.393
H332 BHK149.393
H332 BHK162.033
H332 BHK162.033
H342 BHK149.393
H342 BHK149.393
H342 BHK162.033
H342 BHK162.033
H352 BHK149.393
H352 BHK149.393
H352 BHK162.033
H352 BHK162.033
H362 BHK149.393
H362 BHK149.393
H362 BHK162.033
H362 BHK162.033
H372 BHK149.393
H372 BHK149.393
H372 BHK162.033
H372 BHK162.033
H382 BHK149.393
H382 BHK149.393
H382 BHK162.033
H382 BHK162.033
H392 BHK149.393
H392 BHK149.393
H392 BHK162.033
H392 BHK162.033
H3102 BHK149.393
H3102 BHK149.393
H3102 BHK162.033
H3102 BHK162.033
H3112 BHK149.393
H3112 BHK149.393
H3112 BHK162.033
H3112 BHK162.033
H3122 BHK149.393
H3122 BHK149.393
H3122 BHK162.033
H3122 BHK162.033
H3132 BHK149.393
H3132 BHK149.393
H3132 BHK162.033
H3132 BHK162.033
H3142 BHK149.393
H3142 BHK149.393
H3142 BHK162.033
H3142 BHK162.033
H3152 BHK149.393
H3152 BHK149.393
H3152 BHK162.033
H3152 BHK162.033

Permits & Approvals

Permit NoPLG/(BP)2420/4075
Permit Date2018-06-25
Valid Until2023-06-23
Extendable Until2028-06-23

Documents

Filing documents

  • Proforma of Completion Certificate(Occupancy)
  • Details of Encumbrances#New(2021-10-14)
    View
  • Commencement Certificate#New(2021-10-14)
    View
  • Other Plan(If Any)#New(2021-10-14)
    View
  • Proforma of Application Form#New(2021-10-14)
    View
  • Proforma of Allotment Letter#New(2021-10-14)
    View
  • Proforma of Conveyance Deed#New(2021-10-14)
    View
  • Waste Disposal Plan#New(2021-10-14)
    View
  • Water Supply Plan#New(2021-10-14)
    View
  • Electricity Supply Plan#New(2021-10-14)
    View
  • Development Work Plan#New(2021-10-14)
    View
  • Affidavit (Form-B)#New(2021-11-03)
    View
  • CA CERTIFICATE#New(2021-10-14)
    View
  • ARCHITECT CERTIFICATE#New(2021-11-03)
    View
  • ENGINEERS CERTIFICATE#New(2021-10-14)
    View

Land documents

  • Lease Deed#BAHI NO. 1, JILD No. 6436, PAGE NO. 281 - 314, SERIAL NO. 11308(2010-05-20)
    3249361138Eros_Sampoornam_Lease_Deed_19_05_2010.pdf
    View

Project Team

Architect Address195, Ram Vihar, Delhi, 110092
Engineer AddressF-19, Ground Floor, South City 2, Gurugram, 122002

Developer & Contact

Developer

Promoter NameAJAY ENTERPRISES PRIVATE LIMITED
Promoter Address8TH FLOOR, EROS CORPORATE TOWER, NEHRU PLACE, NEW DELHI-110019
Company TypeCompany
Mobile9654522444
Emailsecretarial@eros-group.com
Registered Address8TH FLOOR, EROS CORPORATE TOWER, NEHRU PLACE, NEW DELHI-110019
Contractor Address5-E/10, Bunglow/Plot, N.I.T. Faridabad, Haryana

Bank Accounts

Account Typecollection
Account Number40503909696
Account NameAjay Enterprises Pvt. Ltd. Collection A/c Eros Sampoornam 2
Bank NameState Bank of India
BranchNoida Main Branch, Sector 2, Noida
Branch AddressB-138, B Block, Sector 2, Noida, Gautam Buddha Nagar - 201301
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCSBIN0005936
Branch Emailsbi.05936(at the rate)sbi.co.in
Account Typeseparate
Account Number40503932922
Account NameAjay Enterprises Pvt. Ltd. Separate Bank A/c Eros Sampoornam 2
Bank NameState Bank of India
BranchNoida Main Branch, Sector 2, Noida
Branch AddressB-138, B Block, Sector 2, Noida, Gautam Buddha Nagar - 201301
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCSBIN0005936
Branch Emailsbi.05936(at the rate)sbi.co.in
Account Typetransaction
Account Number40503933787
Account NameAjay Enterprises Pvt. Ltd. RERA Transaction A/c Eros Sampoornam 2
Bank NameState Bank of India
BranchNoida Main Branch, Sector 2, Noida
Branch AddressB-138, B Block, Sector 2, Noida, Gautam Buddha Nagar - 201301
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCSBIN0005936
Branch Emailsbi.05936(at the rate)sbi.co.in

Development & Facilities

Development works

Demarcation Of PlotsPlot number - GH 01, Sector 02, Greater Noida (West), Gautam Buddha Nagar, Total Plot area = 98373.75 square meters, Current project plot area = 13534 square meters
Boundary Wall2.1 meters high boundary wall with 450 mm high brick and plaster wall and above 1650 mm high mild steel grill between two R.C.C. columns approximately 4.5 meters centre to centre. The boundary wall shall be earthquake resistant.
Road WorkAll roads in the complex will be in combination of concrete pavers of different colours, shape, thickness. Roads will be laid over 225 mm water bound macadam.
FootpathsAll footpaths in the complex will be in combination of concrete pavers of different colours, shape and thickness of 65 mm and 80 mm laid over 150 mm water bound macadam.
Water Supply Including Drinking Water FacilitiesPotable water supply from Greater Noida Authority shall be collected in underground collection tank and pumped to overhead water tanks (6 numbers) located at the top floor terrace of total capacity of 148 KL. The supply of water to individual flats shall be from the said overhead water tanks.
Sewer SystemThe sewage will be collected through a soil pipeline arrangements, bends and inspection chambers leading to the sewage water treatment plant (STP) of the Project, from where the sewage will be used for irrigation and flushing purpose after necessary treatment.
DrainRain water shall be collected in drains having a maximum width of 150 mm connected to the underground cement concrete pipeline. For discharge, water will be collected in man holes to be constructed in periphery of complex. And these man holes are connected with ground water recharge pits. Over flow water will be connected with drain of Greater Noida Authority.
ParksLush green internal park will be provided and maintained. The parks will have joggings tracks, pavilion, children play area and sitting areas.
Tree PlantingThe trees will be planted at all suitable locations of the project and along the boundary walls. The tree selection, flora and vegetation shall be as per the climatic conditions. Trees will be planted in a manner to ensure that there is no hindrance in the services/ usage in the project.
Design For Electric Supply Including Street LightingElectricity supply provided through 33/0.415 KV transformers and by DG set supply for backup. External street lighting shall be through solar power with alternate supply through grid.
Community BuildingsNot Applicable
Treatment And Disposal System Of Sewage And Sullage WaterSewage shall be treated in Sewage Treatment Plant (STP) and thereafter treated water to be used for flushing and irrigation.
Solid Waste Management And Disposal SystemSolid waste to be collected from individual flats and stored in garbage room in the basement. Recyclable waste shall be processed in the compost machine to make compost. Non recyclable waste shall be disposed of through the vendors approved by Greater Noida Authority.
Water Conservation SystemRain water harvesting pits shall be provided for ground water recharging and overflow to be discharged in the municipal drains. Treated sewage shall be used for irrigation and flushing.
Energy Management System Including Use Of Renewable EnergySolar panels shall be provided on terrace for renewable energy. Single point metering will be there for energy purchased from the grid/power supply company.
Fire Protection And Fire Safety SystemFire fighting system shall be provided for all buildings as per the prevailing requirements of National Building Code. Sprinkler shall be provided in all common areas, basement and inside the individual apartments. Smoke detectors, fire doors shall be provided in common areas. Water supply to sprinklers and hydrants shall be from fire pumps located in the basement.
Social Infrastructure And Other Public Amenities Including Public Health ServicesCommon social infrastructure shall be provided for all the phases combined.
Emergency Evacuation ServicesFire staircases shall be provided as per the approved fire drawing for evacuation to open areas.
Other Miscellaneous WorkNot Applicable

Financials

Registration Fee (₹)73000
Project Duration (months)77