EWS, Gokuldham under PMAY

by TREADSTONE LIMITED

Unnao, Uttar Pradesh · UPRERAPRJ598095/08/2025

Registered

Total units

993

Overview

Registration Date2025-08-02
RERA NumberUPRERAPRJ598095/08/2025
Promoter IDUPRERAPRM283711
Proposed Start2024-06-26
Proposed Completion2026-12-25

Location

DistrictUnnao
TehsilUnnao
VillageMagarwara
AddressKhasra No. 1503, 1504, 1506, 1507 , Magarwara, Unnao, Uttar Pradesh, PIN-209862
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Total Units993
Unit Types1
Blocks5
Floors15

Khasra records (1)

  • 1503, 1504, 1506, 1507, Magarwara, Distt. Unnao, Uttar Pradesh, PIN-209862· Khasra· 16710

Inventory

Apartments (74 rows)
BlockFloorTypeCountCarpet (m²)BalconyGarage
TOWER AGF1 BHK723.161
TOWER A11 BHK1023.161
TOWER A21 BHK1023.161
TOWER A31 BHK1023.161
TOWER A41 BHK1023.161
TOWER A51 BHK1023.161
TOWER A61 BHK1023.161
TOWER A71 BHK1023.161
TOWER A81 BHK1023.161
TOWER A91 BHK1023.161
TOWER A101 BHK1023.161
TOWER A111 BHK1023.161
TOWER A121 BHK1023.161
TOWER A131 BHK1023.161
TOWER BGF1 BHK1923.161
TOWER B11 BHK2423.161
TOWER B21 BHK2423.161
TOWER B31 BHK2423.161
TOWER B41 BHK2423.161
TOWER B51 BHK2423.161
TOWER B61 BHK2423.161
TOWER B71 BHK2423.161
TOWER B81 BHK2423.161
TOWER B91 BHK2423.161
TOWER B101 BHK2423.161
TOWER B111 BHK2423.161
TOWER B121 BHK2423.161
TOWER B131 BHK2423.161
TOWER B141 BHK2423.161
TOWER CGF1 BHK923.161
TOWER C11 BHK1223.161
TOWER C21 BHK1223.161
TOWER C31 BHK1223.161
TOWER C41 BHK1223.161
TOWER C51 BHK1223.161
TOWER C61 BHK1223.161
TOWER C71 BHK1223.161
TOWER C81 BHK1223.161
TOWER C91 BHK1223.161
TOWER C101 BHK1223.161
TOWER C111 BHK1223.161
TOWER C121 BHK1223.161
TOWER C131 BHK1223.161
TOWER C141 BHK1223.161
TOWER DGF1 BHK923.161
TOWER D11 BHK1223.161
TOWER D21 BHK1223.161
TOWER D31 BHK1223.161
TOWER D41 BHK1223.161
TOWER D51 BHK1223.161
TOWER D61 BHK1223.161
TOWER D71 BHK1223.161
TOWER D81 BHK1223.161
TOWER D91 BHK1223.161
TOWER D101 BHK1223.161
TOWER D111 BHK1223.161
TOWER D121 BHK1223.161
TOWER D131 BHK1223.161
TOWER D141 BHK1223.161
TOWER EGF1 BHK723.161
TOWER E11 BHK1023.161
TOWER E21 BHK1023.161
TOWER E31 BHK1023.161
TOWER E41 BHK1023.161
TOWER E51 BHK1023.161
TOWER E61 BHK1023.161
TOWER E71 BHK1023.161
TOWER E81 BHK1023.161
TOWER E91 BHK1023.161
TOWER E101 BHK1023.161
TOWER E111 BHK1023.161
TOWER E121 BHK1023.161
TOWER E131 BHK1023.161
TOWER E141 BHK1023.161

Permits & Approvals

Permit NoKDA/BP/22-23/1350
Permit Date2024-03-19
Valid Until2029-03-18
Extendable Until2032-03-18

Documents

Filing documents

  • Proforma of Completion Certificate(Occupancy)
  • Proforma of Completion Certificate(Occupancy)
  • CA CERTIFICATE
  • Details of Encumbrances#New(2024-11-07)
    View
  • Commencement Certificate#New(2024-10-14)
    View
  • Other Plan(If Any)#New(2024-10-14)
    View
  • Proforma of Application Form#New(2024-10-14)
    View
  • Proforma of Allotment Letter#New(2024-10-15)
    View
  • Proforma of Conveyance Deed#New(2024-10-14)
    View
  • Waste Disposal Plan#New(2024-10-14)
    View
  • Water Supply Plan#New(2024-10-14)
    View
  • Electricity Supply Plan#New(2024-10-14)
    View
  • Development Work Plan#New(2024-10-14)
    View
  • Affidavit (Form-B)#New(2024-10-14)
    View
  • CA CERTIFICATE#New(2024-10-14)
    View
  • ARCHITECT CERTIFICATE#New(2024-10-14)
    View
  • ENGINEERS CERTIFICATE#New(2024-10-14)
    View
  • Other#New(2024-10-14)
    View
  • Proforma of Agreement for Sale#New(2024-10-15)
    View

Land documents

  • Registry Document#4730(2008-06-02)
    12861513629.pdf
    View
  • Registry Document#5830(1991-11-02)
    12861513010.PDF
    View
  • Registry Document#1132(2018-07-12)
    12861515123.pdf
    View
  • Registry Document#233(2022-12-30)
    12861511109.pdf
    View
  • Registry Document#69(2024-07-22)
    12861513521.pdf
    View
  • Allotment Letter issued by Competent Authority#PMAY Policy by UP Government No. 1132 Dated 12.07.2018(2018-07-12)
    12861514237.pdf
    View
  • Allotment Letter issued by Competent Authority#Reply of Objection for Registration of EWS, Gokuldhan under PMAY Project(2024-11-06)
    12861518863.pdf
    View

Project Team

Architect AddressRajarhat Gopalpur, North 24 Pargana - 700080 (W.B)
Engineer Address63/22 Brindaban Mullick Lane, Howrah - 711101 (W.B)

Developer & Contact

Developer

Promoter NameTREADSTONE LIMITED
Promoter Address52/3,4,5 BLOCK T FACTORY AREA, FAZALGANJ, Kanpur, KANPUR, Uttar Pradesh, India, 208012
Company TypeCompany
Mobile8494868467
Emailgm.construction@treadstone-group.com
Registered Address52/3,4,5 BLOCK T FACTORY AREA, FAZALGANJ, Kanpur, KANPUR, Uttar Pradesh, India, 208012
Contractor Address52/3,4,5, T Fazalganj, Kanpur, U.P. - 208012

Bank Accounts

Account Typecollection
Account Number42770743468
Account NameTread stone Limited Collection Account for EWS, Gokuldham under PMAY
Bank NameState Bank of India
BranchUnnao
Branch AddressPannalal Park, Unnao, Uttar Pradesh, PIN-209801
Branch DistrictUnnao
Branch StateSelect
IFSCSBIN0000200
Branch Emailsbi.00200@sbi.co.in
Account Typeseparate
Account Number42770740398
Account NameTreadstone Limited Separate Bank Account for EWS, Gokuldham under PMAY
Bank NameState Bank of India
BranchUnnao
Branch AddressPannalal Park, Unnao, Uttar Pradesh, PIN-209801
Branch DistrictUnnao
Branch StateUttar Pradesh
IFSCSBIN0000200
Account Typetransaction
Account Number42770742624
Account NameTreadstone Limited RERA Transaction Account for EWS, Gokuldham under PMAY
Bank NameState Bank of India
BranchUnnao
Branch AddressPannalal Park, Unnao, Uttar Pradesh, PIN-209801
Branch DistrictUnnao
Branch StateUttar Pradesh
IFSCSBIN0000200

Development & Facilities

Development works

Demarcation Of Plotsits boundaries (latitude and longitude of the end points) 26.518386 - 80.438941 to the North 26.517273 -80.439354 to the south 26.518291 - 80. 438885 to the East 26.517692 - 80. 43997 to the West of Village Magarwara Tehsil Unnao Development Authority Kanpur, District Unnao, PIN 209862.
Boundary Wall250 MM thk. Brick Wall with column 3.3 m C/C height of boundary wall 2.4 M.
Road Work20 mm thk.premix carpet seal coat over 75 thk. Bituminous macadam / 450 mm thk. comated W.B.M. / 250 MM thk. granular sub base / 150 mmthk compacted moorum.
Footpaths25mm thk. paver tiles over WBM fixed with 35/50 mm sand in Zigzag pattern.
Water Supply Including Drinking Water FacilitiesDomestic water supply lines to Plots from OHT or UGR.OHT/UGR will feed from Municipal water supply line.
Sewer SystemUnderground Sewer System through HDPE pipe and pit (As per IS Code) to STP within the premises. (Inside project domain)
DrainUnderground Drainage System through HDPE pipe and pit (As per IS Code). Overflow to Municipal Drain.
ParksWe will provide landscape with civil work 125/ 250 mm thk. brick, stone , paver grass , various type of plantation and foot path inside the park.
Tree PlantingTree Plantation as per sanctioned plan . There are various type of trees / shurbs here like Ashok, Neem , Neebu, Peela Gulmohar, Dhak/ Palash, Blackboard, tree ( Chitvan)/ Bougainvilla, Orange, Jessamie, Neelkanth, Pila Kaner.
Design For Electric Supply Including Street LightingService connections to plots from captive sub-stations and park lighting 6.5/9 metres Electric Pole as per layout.
Community BuildingsNot Applicable
Treatment And Disposal System Of Sewage And Sullage WaterTotal tread water generated at site per day will be 373KLD through 425KLD STP.142 KLD of treated water will be reused in flushing and gardening. Rest 156KLD of treated water from STP will be discharged to city sewer line.
Solid Waste Management And Disposal System3511KG/Day solid waste will be generated at site of which 1755kg/day will be proposed through composter machine size of 2000kg/day at site to convert into valuable compost which can be used as compost/manure for the landscaping with in the premises. Rest of the recyclable and non biodegradable waste will be collected from site by Municipal or Private solid waste collection organisation as may be applicable on regular intervals.
Water Conservation SystemProviding installing and commissioning of electro-Mechanical equipment of 175KLD for tertiary treatment including all filtration vessels (FRP), filter press, Air blower, al type of pumps, panel, electrical equipment (wire and cables), all types of pipes, etc. Complete in all respect as per MBBR specification and drawing. The STP treated water will be used for flushing, landscaping etc. The quality of treated water should be matched as per PCB guideline or any local authority recommendation. 142KLD of water is being reused per day through treatment of STP.
Energy Management System Including Use Of Renewable EnergySolar Energy system will be installed as per norms.
Fire Protection And Fire Safety SystemSupply, erection, testing and commissioning of Electrical Motor driven main pump, centrifugal horizontal type, with gland packing capable of deliver 2850 LPM at 88 MWC. The pump shall be coupled with TEFC motor of suitable KW with speed of 2900 RPM with all accessories and complete set shall mounted on common bas
Social Infrastructure And Other Public Amenities Including Public Health ServicesProper Water Supply and Sanitary facilities.
Emergency Evacuation ServicesYes, Refuge area provided at every Tower at 25.56 M lev.
Other Miscellaneous WorkProper security system including security guard , CCTV cameras available.

Financials

Registration Fee (₹)89000
Project Duration (months)30