Experion SAATORI

by Experion Developers Pvt. Ltd

Gautam Buddha Nagar, Uttar Pradesh · UPRERAPRJ747628/01/2026

Registered

Total units

457

Overview

Registration Date2026-01-20
RERA NumberUPRERAPRJ747628/01/2026
Promoter IDUPRERAPRM3669
Proposed Start2026-01-01
Proposed Completion2030-12-01

Location

DistrictGautam Buddha Nagar
TehsilGautam Buddha Nagar
VillageSECTOR-151
LocalityNOIDA
AddressPlot No. 01, BLOCK No. GH
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Total Units457
Unit Types5
Blocks3
Floors42

Khasra records (1)

  • GH-01, SECTOR-151, NOIDA· Plot· 20050

Inventory

Apartments (214 rows)
BlockFloorTypeCountCarpet (m²)BalconyGarage
T1BSMNTOTHER000
T1LGFOTHER000
T1UGFOTHER000
T114 BHK3156.4223
T113 BHK1125.4233
T124 BHK4156.4223
T134 BHK4156.4223
T144 BHK4156.4223
T154 BHK4156.4223
T164 BHK4156.4223
T174 BHK4156.4223
T184 BHK4156.4223
T194 BHK4156.4223
T1104 BHK4156.4223
T1114 BHK4156.4223
T1124 BHK4156.4223
T1134 BHK4156.4223
T1144 BHK4156.4223
T1154 BHK4156.4223
T1164 BHK3156.4223
T1163 BHK1129.9643
T1174 BHK4156.4223
T1184 BHK4156.4223
T1194 BHK4156.4223
T1204 BHK4156.4223
T1214 BHK4156.4223
T1224 BHK4156.4223
T1234 BHK4156.4223
T1244 BHK4156.4223
T1254 BHK3156.4223
T1253 BHK1129.9643
T1264 BHK4156.4223
T1274 BHK4156.4223
T1284 BHK4156.4223
T1294 BHK4156.4223
T1304 BHK4156.423
T1314 BHK4156.4223
T1324 BHK4156.4223
T1334 BHK4156.4223
T1344 BHK3156.4223
T1343 BHK1129.9643
T1354 BHK4156.4223
T1364 BHK4156.4223
T1374 BHK4156.4223
T1384 BHK4156.4223
T2BSMNTOTHER000
T2GFOTHER000
T2LGFOTHER000
T2UGFOTHER000
T213 BHK2101.7132
T213 BHK1122.7292
T212 BHK194.0842
T223 BHK2101.7132
T223 BHK2122.7292
T233 BHK2101.7132
T233 BHK2122.7292
T243 BHK2101.7132
T243 BHK2122.7292
T253 BHK2101.7132
T253 BHK2122.7292
T263 BHK2101.7132
T263 BHK2122.7292
T273 BHK2101.7132
T273 BHK2122.7292
T283 BHK2101.7132
T283 BHK2122.7292
T293 BHK2101.7132
T293 BHK2122.7292
T2103 BHK2101.7132
T2103 BHK2122.7292
T2113 BHK2101.7132
T2113 BHK2122.7292
T2123 BHK2101.7132
T2123 BHK2122.7292
T2133 BHK2101.7132
T2133 BHK2122.7292
T2143 BHK2101.7132
T2143 BHK2122.7292
T2153 BHK2101.7132
T2153 BHK2122.7292
T2163 BHK1101.7132
T2162 BHK183.772
T2163 BHK2122.7292
T2173 BHK2101.7132
T2173 BHK2122.7292
T2183 BHK2101.7132
T2183 BHK2122.7292
T2193 BHK2101.7132
T2193 BHK2122.7292
T2203 BHK2101.7132
T2203 BHK2122.7292
T2213 BHK2101.7132
T2213 BHK2122.7292
T2223 BHK2101.7132
T2223 BHK2122.7292
T2233 BHK2101.7132
T2233 BHK2122.7292
T2243 BHK2101.7132
T2243 BHK2122.7292
T2253 BHK1101.7132
T2252 BHK183.772
T2253 BHK2122.7292
T2263 BHK2101.7132
T2263 BHK2122.7292
T2273 BHK2101.7132
T2273 BHK2122.7292
T2283 BHK2101.7132
T2283 BHK2122.7292
T2293 BHK2101.7132
T2293 BHK2122.7292
T2303 BHK2101.7132
T2303 BHK2122.7292
T2313 BHK2101.7132
T2313 BHK2122.7292
T2323 BHK2101.7132
T2323 BHK2122.7292
T2333 BHK2101.7132
T2333 BHK2122.7292
T2343 BHK1101.7132
T2343 BHK2122.7292
T2353 BHK2101.7132
T2353 BHK2122.7292
T2363 BHK2101.7132
T2363 BHK2122.2792
T2373 BHK2101.7132
T2373 BHK2122.7292
T2383 BHK2101.7132
T2383 BHK2122.7292
T3BSMNTOTHER000
T3GFOTHER000
T3LGFOTHER000
T3UGFOTHER000
T313 BHK2101.7132
T313 BHK1122.7292
T312 BHK194.0842
T323 BHK2101.7132
T323 BHK2122.7292
T333 BHK2101.7132
T333 BHK2122.7292
T343 BHK2101.7132
T343 BHK2122.7292
T353 BHK2101.7132
T353 BHK2122.7292
T363 BHK2101.7132
T363 BHK2122.7292
T373 BHK2101.7132
T373 BHK2122.7292
T383 BHK2101.7132
T383 BHK2122.2792
T393 BHK2101.7132
T393 BHK2122.7292
T3103 BHK2101.7132
T3103 BHK2122.2792
T3113 BHK2101.7132
T3113 BHK2122.7292
T3123 BHK2122.7292
T3133 BHK2101.7132
T3133 BHK2122.7292
T3143 BHK2101.7132
T3143 BHK2122.7292
T3153 BHK2101.7132
T3153 BHK2122.7292
T3163 BHK1101.7132
T3162 BHK183.772
T3163 BHK2122.7292
T3173 BHK2101.7132
T3173 BHK2122.7292
T3183 BHK2101.7132
T3183 BHK2122.7292
T3193 BHK2101.7132
T3193 BHK2122.7292
T3203 BHK2101.7132
T3203 BHK2122.7292
T3213 BHK2101.7132
T3213 BHK2122.7292
T3223 BHK2101.7132
T3223 BHK2122.7292
T3233 BHK2101.7132
T3233 BHK2122.7292
T3243 BHK2101.7132
T3243 BHK2122.7292
T3253 BHK1101.7132
T3252 BHK183.772
T3253 BHK2122.7292
T3263 BHK2101.7132
T3263 BHK2122.7292
T3273 BHK2101.7132
T3273 BHK2122.7292
T3283 BHK2101.7132
T3283 BHK2122.7292
T3293 BHK2101.7132
T3293 BHK2122.7292
T3303 BHK2101.7132
T3303 BHK2122.7292
T3313 BHK2101.7132
T3313 BHK2122.7292
T3323 BHK2101.7132
T3323 BHK2122.7292
T3333 BHK2101.7132
T3333 BHK2122.7292
T3343 BHK1101.7132
T3342 BHK183.772
T3343 BHK2122.7292
T3353 BHK2101.7132
T3353 BHK2122.7292
T3363 BHK2101.7132
T3363 BHK2122.7292
T3373 BHK2101.7132
T3373 BHK2122.7292
T3383 BHK2101.7132
T3383 BHK2122.7292
T3123 BHK2101.7132
T1GFSHOP1128.070
T2342 BHK183.772

Permits & Approvals

Permit No2025/10/07/13090
Permit Date2025-12-05
Valid Until2030-12-04
Extendable Until2035-12-03

Documents

Filing documents

  • Other Plan(If Any)
  • Proforma of Completion Certificate(Occupancy)
  • Details of Encumbrances#New(2026-01-02)
    View
  • Commencement Certificate#New(2025-12-06)
    View
  • Proforma of Application Form#New(2025-12-06)
    View
  • Proforma of Allotment Letter#New(2025-12-06)
    View
  • Proforma of Conveyance Deed#New(2025-12-06)
    View
  • Waste Disposal Plan#New(2026-01-02)
    View
  • Water Supply Plan#New(2026-01-02)
    View
  • Electricity Supply Plan#New(2026-01-02)
    View
  • Development Work Plan#New(2025-12-06)
    View
  • Affidavit (Form-B)#New(2025-12-06)
    View
  • CA CERTIFICATE#New(2026-01-08)
    View
  • ARCHITECT CERTIFICATE#New(2026-01-02)
    View
  • ENGINEERS CERTIFICATE#New(2025-12-06)
    View
  • Other#New(2025-12-06)
    View
  • Proforma of Agreement for Sale#New(2026-01-03)
    View

Land documents

  • Lease Deed#8371(2025-06-18)
    18230451506.pdf
    View
  • Allotment Letter issued by Competent Authority#NOIDA/GH/2025/47(2025-02-11)
    18230456680.pdf
    View

Project Team

Architect AddressM/s ACPL DESIGN LTD., E-24, SOUTH EXTENSION-1, NEW DELHI-110049
Engineer Address20, CENTRAL LANE, BABAR ROAD, NEW DELHI-110001

Developer & Contact

Developer

Promoter NameExperion Developers Pvt. Ltd
Promoter AddressRegistered Address -F-9, Ist Floor, Manish Plaza I, Plot -7, MLU, Sector 10, Dwarka, New Delhi – 110 075 Corporate Address Second Floor, Plot No.-18, Sector-32, Gurugram, Haryana
Company TypeCompany
Mobile9845162343
Emailsuneet.puri@experion.net.in
Registered AddressRegistered Address -F-9, Ist Floor, Manish Plaza I, Plot -7, MLU, Sector 10, Dwarka, New Delhi – 110 075 Corporate Address Second Floor, Plot No.-18, Sector-32, Gurugram, Haryana
Contractor Address8TH FLOOR, WING-B, MILESTONE EXPERION CENTRE, SECTOR-15 PART 2, GURUGRAM, HARYANA-122001

Bank Accounts

Account Typecollection
Account Number8858210000050360
Account NameEXPERION DEVELOPERS PRIVATE LIMITED-COLLECTION ACCOUNT FOR EXPERION SAATORI
Bank NameDBS BANK INDIA LIMITED
BranchNOIDA SECTOR-63
Branch AddressZYGON SQUARE, 3RD FLOOR, BLOCK-H-1 A, SECTOR-63, NOIDA, U.P.-201307
Branch DistrictSelect
Branch StateUttar Pradesh
IFSCDBSSOIN0857
Branch EmailDBSNOIDAOps@dbs.com
Account Typeseparate
Account Number8858210000050379
Account NameEXPERION DEVELOPERS PRIVATE LIMITED-SEPARATE BANK ACCOUNT FOR EXPERION SAATORI
Bank NameDBS BANK INDIA LIMITED
BranchNOIDA SECTOR 63
Branch AddressZYGON SQUARE, 3RD FLOOR, BLOCK-H-1 A, SECTOR-63, NOIDA-U.P.-201307
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCDBSSOIN0857
Account Typetransaction
Account Number8858210000050351
Account NameEXPERION DEVELOPERS PRIVATE LIMITED-RERA TRANSACTION ACCOUNT FOR EXPERION SAATORI
Bank NameDBS BANK INDIA LIMITED
BranchNOIDA SECTOR-63
Branch AddressZYGON SQUARE, 3RD FLOOR, BLOCK-H-1 A, SECTOR-63, NOIDA, U.P.-201307
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCDBSS0IN0857

Development & Facilities

Development works

Demarcation Of PlotsProjects site is located in Sector-151 Noida (Corner Plot), 20050sqm area, 1 Plot. As per site plan and possession letter.
Boundary Wall587 Mtr, 2.4m height, material used; type (brick, RCC, fencing), brick and RCC appearance - as per elevation, safety features- CCTV
Road WorkTotal Road Length- 530 mts and width - 7 mtr, number of lanes - 2 way; type of pavement - rcc/ pavers, rainage - along roag, surface durability - As per Fire tender movement.
FootpathsLength, width , number of crossings; material used, accessibility, safety design - as per site plan and landscape plan.
Water Supply Including Drinking Water FacilitiesNumber of water connections, tank capicity, hydrants; source of water, treatment method, compilance with quality standards. Connections - Underground Water tank capicity - 2 Nos. of Fire water tank (184KL + 574 KL = 759 KL, 2 Nos. of Domestic Water Tank (133 KL + 133 KL = 266 Kl), Source of Water Supply - Municipal Water Supply, Water Treatment Method - Dual Media and Activated carbon Filters, Innternal and External Hydrants - Yes Both Provided, Compilance with quality standards - Yes
Sewer SystemLength of sewer lines, pipe size, manholes; type(gravity/pressure), material used, network design - Total length of sewage pipe - Approx. 410m, Proposed the manholes and Gully trap location on site plan, All verticals sewer pipes are directly connected to Gully trap manholes, After manhole connection all sewage flow are drain into the STP. The starting pipe size of manhole to manhole connection is 200mm Dia and ending pipe dia for STO connection is approx. 300mm
DrainLength, width, number of open/covered drains; type(storm/surface), material, disposal method - Total Length of storm pipe - Approx. 550m, and also Proposed the storm manholes and Catch basin locations on site plan for storm water drains, All Vertical storm pipes are directly connect to manholes, After manhole connection storm water drain connected to the rain water harvestinf pits (Location MArks on the site plan ) . Overflow from rain harvesting pits is directly connected into External minicipal drain Line. The starting pipe size of manhole-to-manhole connection is 200,, dia and ending pipe dia is approx. 350mm.
ParksArea, number of parks, number of trees/plamts; landscaping features, types of parks, public amenities - as per landscape plan
Tree PlantingNumber of trees, types/species, spacing; native/exotic trees, maintainance plan- as per landscape plan
Design For Electric Supply Including Street LightingNumber of poles, lights, transformer units; type of lighting(LED/solar), illumination design - Number of external poles/lights -Approx. 42 Nos, Transformer units - 5 Nos, out of total 5 Nos., 3 Nos. each of 1250 KVA for apartments and common area, and 2 Nos. each of 1000 KVA for EV Charging, Type of lighting (LED/solar) - LED, Illumination design - Yes as per norms
Community BuildingsNumber, area per building, capacity; purpose (hall,creche), construction type, facilities - as per community building plan.
Treatment And Disposal System Of Sewage And Sullage WaterSTP capacity (KLD), number of treatment units, type of STP, treated water use, and regulatory compliance. STP Capacity (KLD) - 375 KLD, Number of Treatment units - 1 No, Type of STP - MBBR System, Treatment Water use - Flushing Water Supply, Horticulture, Regulatory - Yes as per norms
Solid Waste Management And Disposal SystemEstimated waste )kg/day), number of bins/collection ponts; segregation, composting/recycling, collection method. Waste GEnerated (Kg/Day) - 519 Kg/day (Organic waste) + 778 kg/day (Inorganic wate) = (1297 Kg/Day) Total Waste Generated
Water Conservation SystemNumber and size of harvesting pits, recharge wells; water-efficient fixtures, reuse/recharge strategy, system efficiency Number and size of harvesting pits - 5Nos. of pits and approx. 49.13m3 capacity of each pits, Recharge wells - yes provided, water efficient fixtures - Consider low flow sanitary fixtures, Reuse/recharge strategy - RAin water will be used for ground water recharge,system efficiency - As per norms
Energy Management System Including Use Of Renewable Energy(Renewable Energy) Solar capacity (kW), number of panels; type of renewable energy used, grid integration, backup provisions Online Solar power system of capacity 40 KW.
Fire Protection And Fire Safety SystemNumber of hydrants, fire exits, sprinklers; system type (manual/automatic), NBC compilance, fire safety tarining Number of hydrants - 12 Nos. of External Hydrants, and more than 100 internal hydrants, Sprinklers System (Manual/Automatic) - Automatic with standby sprimklers system, NBC compilance - Yes, Fire safety training - Will be provided at the time of occupancy
Social Infrastructure And Other Public Amenities Including Public Health ServicesNumber/area of amenities (toilets,health units) ; type of services offered, inclusiveness, accessibilty - as per applicable norms
Emergency Evacuation ServicesNumber of evacuation points, roads widths, signage count; route paln. safety measures, public awareness system - As per NBC 2016
Other Miscellaneous WorkWork based on the nature of work 9e.g., number of CCTV units, benches); beautification efforts, signange, asthetic and utility elements - beautification efforts, signage, asthetic and utility elemrnts CCTV proposed as per project requirement.

Financials

Registration Fee (₹)105500
Project Duration (months)60