Registered
Overview
Registration Date2025-08-27
RERA NumberUPRERAPRJ658961/08/2025
Promoter IDUPRERAPRM370526
Proposed Start2025-05-09
Proposed Completion2027-06-30
Location
DistrictGhaziabad
TehsilGhaziabad
VillageDASNA
AddressKHASRA NO. 1839, 1840, 1841,1848,1849,1850,1854,1858,1859,1861,1861,1877,1879,1880,1881,1882,1883,1884,1885,1886,1887,1888,1889,1890,1891,1892,1893,NH-24, VILLAGE DASNA, NEAR EASTERN PERIPHERAL EXPRESSWAY
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Khasra records (25)
Show all 25 khasra rows
- 1841· Khasra· 3292 m²
- 1848· Khasra· 54763 m²
- 1849· Khasra· 3470 m²
- 1850· Khasra· 100653 m²
- 1854· Khasra· 151023 m²
- 1858· Khasra· 5122 m²
- 1859· Khasra· 46201 m²
- 1861· Khasra· 77308 m²
- 1879· Khasra· 58659 m²
- 1880· Khasra· 97835 m²
- 1881· Khasra· 19021 m²
- 1882· Khasra· 80674 m²
- 1883· Khasra· 551892 m²
- 1884· Khasra· 54485 m²
- 1885· Khasra· 169020 m²
- 1886· Khasra· 481576 m²
- 1887· Khasra· 137593 m²
- 1888· Khasra· 248509 m²
- 1890· Khasra· 261801 m²
- 1891· Khasra· 367831 m²
- 1892· Khasra· 164559 m²
- 1893· Khasra· 568182 m²
- 1840K· Khasra· 57587 m²
- 1839K· Khasra· 178272 m²
- 1877KHA· Khasra· 3828 m²
Permits & Approvals
Permit NoGDA/LD/24-25/0612
Permit Date2025-05-09
Valid Until2030-05-08
Extendable Until2033-05-08
Documents
Filing documents
- Proforma of Application Form
- Proforma of Completion Certificate(Occupancy)
- Proforma of Agreement for Sale
- Proforma of Agreement for Sale
- Details of Encumbrances#New(2025-07-04)View
- Commencement Certificate#New(2025-07-04)View
- Other Plan(If Any)#New(2025-07-04)View
- Proforma of Application Form#New(2025-08-08)View
- Proforma of Allotment Letter#New(2025-07-04)View
- Proforma of Conveyance Deed#New(2025-07-04)View
- Waste Disposal Plan#New(2025-07-04)View
- Water Supply Plan#New(2025-07-04)View
- Electricity Supply Plan#New(2025-07-22)View
- Development Work Plan#New(2025-07-22)View
- Affidavit (Form-B)#New(2025-07-22)View
- CA CERTIFICATE#New(2025-07-04)View
- ARCHITECT CERTIFICATE#New(2025-07-22)View
- ENGINEERS CERTIFICATE#New(2025-07-22)View
- Other#New(2025-07-26)View
- Proforma of Agreement for Sale#New(2025-08-08)View
Land documents
- Registry Document#8386(2024-07-08)View16348703848.pdf
Project Team
Architect AddressK-7, KAILASH COLONY, NEW DELHI
Engineer AddressG-70, 2ND FLOOR, JASWANT PLAZA, NEAR KALINDI KUNJ, MAIN SARITA VIHAR ROAD, OKHLA, NEW DELHI- 110025
Developer & Contact
Developer
Promoter NameSRSD BUILDCON VENTURE LLP
Promoter AddressA-15, 4TH FLOOR, SECTOR-136, GAUTAM BUDDHA NAGAR, UTTAR PRADESH- 201301
Company TypeLimited Liability Partnership (LLP)
Mobile9711800692
Emailbholakumarsha04@gmail.com
Registered AddressA-15, 4TH FLOOR, SECTOR-136, GAUTAM BUDDHA NAGAR, UTTAR PRADESH- 201301
Contractor AddressA-15, 4TH FLOOR, SECTOR-136, GAUTAM BUDDHA NAGAR, UTTAR PRADESH
Bank Accounts
Account Typecollection
Account Number50200110625330
Account NameSRSD FOREST WALK PHASE-1 COLL ACCT
Bank NameHDFC BANK LIMITED
BranchRDC RAJNAGAR, GHAZIABAD
Branch AddressD-44, RDC RAJNAGAR, GHAZIABAD, UTTAR PRADESH- 201001
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCHDFC0000153
Branch EmailATULR.KUMAR@HDFCBANK.COM
Account Typeseparate
Account Number50200110591279
Account NameSRSD FOREST WALK PHASE 1 SEP ACCT
Bank NameHDFC BANK LIMITED
BranchRDC RAJNAGAR, GHAZIABAD
Branch AddressD-44, RDC RAJNAGAR, GHAZIABAD, UTTAR PRADESH-201001
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCHDFC0000153
Account Typetransaction
Account Number50200110547274
Account NameSRSD FOREST WALK PHASE -1 TRANS ACCT
Bank NameHDFC BANK LIMITED
BranchRDC RAJNAGAR, GHAZIABAD
Branch AddressD-44, RDC RAJNAGAR, GHAZIABAD, UTTAR PRADESH- 201001
Branch DistrictGhaziabad
Branch StateUttar Pradesh
IFSCHDFC0000153
Development & Facilities
Development works
Demarcation Of PlotsTotal 99 Plots have been demarcated as per map approved by the Ghaziabad Development Authority.
Boundary WallBoundary Wall is not applicable here this is the first phase of project falling within the total project land.
Road WorkTotal 1360 Running Meters Road to be built with Pavers Blocks
FootpathsTotal 204 running Meter footpaths will be built up using Paver Blocks as per Design
Water Supply Including Drinking Water FacilitiesWater to be provided by the GDA and developer will make over head tank in at each villas.
Sewer SystemMain Sewer Line has been design under grounded as per GDA Plans and finally it will be connect to STP for treating the sewage. Sewerage Line to be connect to the Centralized STP.
DrainDrainage System will be underground and will be connected to the main sewer.
ParksPark Landscape has been design as per approved Plan
Tree PlantingTree Planting has been design as per GDA Plan.
Design For Electric Supply Including Street LightingSingle Feeder shall be taken from Paschimanchal Vidut Vitran Nigam Limited (PVVNL) and connected to the central substation and the entire project shall have street Light.
Community BuildingsNot applicable
Treatment And Disposal System Of Sewage And Sullage WaterSTP facilities shall be installed centralized and all sewage will be connected to the centralized STP. The treated water shall be used for flushing, irrigation, car wash, pathways cleaning.
Solid Waste Management And Disposal SystemThe Project shall have the waste segregation area which will be set up as per approved layout plan.
Water Conservation SystemUsing Water efficient appliances, recycling water to use on Plants
Energy Management System Including Use Of Renewable EnergyNot Applicable
Fire Protection And Fire Safety SystemNot Applicable
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicable
Emergency Evacuation ServicesNot Applicable
Other Miscellaneous WorkOther Miscellaneous work if any to compile with the As per approved Project Plan.
Financials
Registration Fee (₹)202500
Project Duration (months)26