Registered
Overview
Registration Date2026-02-23
RERA NumberUPRERAPRJ937180/02/2026
Promoter IDUPRERAPRM318302
Proposed Start2025-05-01
Proposed Completion2028-09-30
Location
DistrictAgra
TehsilAgra
VillageMiyapur near TDI City Fatehabad Road Agra
AddressA/55 part of Kh. no 93 , Miyapur, TDI City Phase 1, Agra -282006
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Plots236
Khasra records (1)
- 472, 451, 467· Khasra· 36138 m²
Inventory
Plots
| Type | Size range | Count |
|---|---|---|
| Plot | UPTO 100 sqm | 183 |
| Plot | 100 to 150 sqm | 53 |
Permits & Approvals
Permit No4887 ZILA PANCHAYAT AGRA
Permit Date2025-02-11
Valid Until2030-02-10
Extendable Until2032-02-10
Documents
Filing documents
- Details of Encumbrances
- Other Plan(If Any)
- Proforma of Completion Certificate(Occupancy)
- Other
- Details of Encumbrances#New(2025-10-07)View
- Commencement Certificate#New(2025-10-09)View
- Proforma of Application Form#New(2025-09-17)View
- Proforma of Allotment Letter#New(2025-09-17)View
- Proforma of Conveyance Deed#New(2025-09-19)View
- Waste Disposal Plan#New(2025-10-08)View
- Water Supply Plan#New(2025-09-17)View
- Electricity Supply Plan#New(2025-09-17)View
- Development Work Plan#New(2025-10-06)View
- Affidavit (Form-B)#New(2025-10-06)View
- CA CERTIFICATE#New(2025-10-10)View
- ARCHITECT CERTIFICATE#New(2025-09-17)View
- ENGINEERS CERTIFICATE#New(2025-09-17)View
- Other#New(2025-10-06)View
- Proforma of Agreement for Sale#New(2025-10-06)View
Land documents
- Sale Deed#6695(2024-07-24)View17416747588.pdf
- Sale Deed#7101(2022-07-07)View17416745833.pdf
- Sale Deed#7902(2022-07-07)View17416743478.pdf
- Extract of Khatauni#01/07/2022(1900-01-01)View17416742053.pdf
- Extract of Khatauni#01/07/2022(1900-01-01)View17416749848.pdf
- Extract of Khatauni#ACKNOWLEDGEMENT OF KHATAUNI KHASRA 472(1900-01-01)View17416744947.pdf
- Extract of Khatauni#01/07/2022(1900-01-01)View17416749483.pdf
Project Team
Architect AddressSHOP NO. 02 FIRST FLOOR BLOCK -C9, CLOTH MARKET , SANJAY PLACE , AGRA -282002
Engineer AddressPLOT NO. 153M SHIV SHAKTI ENCLAVE , SECTOR 81 , NOIDA , UP -201305
Developer & Contact
Developer
Promoter NameCZAR BUILDCON PRIVATE LIMITED
Promoter AddressH-69,UGF,OUTER CIRCLE ABOVE HDFC BANK, CONNAUGHT PLACE NEW DELHI DL 110001 IN
Company TypeCompany
Mobile9690008768
Emailgyanendra@ghi.in
Registered AddressH-69,UGF,OUTER CIRCLE ABOVE HDFC BANK, CONNAUGHT PLACE NEW DELHI DL 110001 IN
Contractor AddressH NO. 01, H BLOCK, GOVARDHAN KUNJ OPP. BSF CAMP , BHONDSI GURUGRAM -122001
Bank Accounts
Account Typecollection
Account Number50200111572830
Account NameCBPL COLLECTION AC FOR GHI CITY 2
Bank NameHDFC BANK
BranchTAJ NAGARI AGRA
Branch AddressTAJ NAGARI PHASE II FATEHABAD ROAD AGRA
Branch DistrictAgra
Branch StateSelect
IFSCHDFC0005144
Branch Emailsunny.arora1@hdfcbank.com
Account Typeseparate
Account Number50200111572879
Account NameCBPL SEPARATE BANK AC FOR GHI CITY 2
Bank NameHDFC BANK
BranchTAJ NAGARI AGRA
Branch AddressTAJ NAGARI PHASE II FATEHABAD ROAD AGRA
Branch DistrictAgra
Branch StateUttar Pradesh
IFSCHDFC0005144
Account Typetransaction
Account Number50200111572840
Account NameCBPL RERA TRANSACTION AC FOR GHI CITY 2
Bank NameHDFC BANK
BranchTAJ NAGARI
Branch AddressTAJ NAGARI PHASE II FATEHABAD ROAD AGRA
Branch DistrictAgra
Branch StateUttar Pradesh
IFSCHDFC0005144
Development & Facilities
Development works
Demarcation Of PlotsLAYOUT OF THE SITE ACCORDING TO BOTH THE SURVEY AND THE APPROVED LAYOUT PLAN USING A TOTAL STATION , TOTAL NUMBER OF PLOTS ARE 236
Boundary WallTHE M30 RCC WALL WITH GRILLS , PRECAST BOUNDARY WALL OF 6 FEET HEIGHT, THE WHOLE PROJECT WILL BE FULLY SECURED BY A BOUNDARY
Road WorkROAD WILL BE FINISH WITH TRIMIX/ CONCRETE PAVERS AS PER DESIGN AND LAAID OVER COMPACTED EARTH , GRANULAR SBBASE (GSB), WBM, PCC ((1. 4.8) AND SAND BED, 11048 SQ MTRS OF ROAD AREA WITH 200 MM W.B.M ALONG WITH BITUMEN CARPETING
FootpathsSUFFICIENT AREA OF FOOTPATH HAS BEEN ALLOTTED FOR PEDESTRIAN USE.
Water Supply Including Drinking Water FacilitiesTHE PORTABLE WATER SUPPLY OF DESIREDQUALITY AND PURITY SHALL BE ENSURED BY TAPPING UNDERGROUND WATER. THE PRIMARY TREATMENT FACILITY SHALL BE ENSURED BEFORE MAKING IT SUPPLIED TO THE USE OF PEOPLE, WATER SUPPLY VIA UNDERGROUND WATER TANKS OF 200 KLD CAPACITY ALONG WITH PUMPING STATIONS AND DI WATER LINES
Sewer SystemAN EFFICIENTLY DESIGNED SEWERAGE SYSTEM CONNECTED TO STP, SEWERAGE PIPELINES 300 MM TO 150 MM ALONG WITH SEWARAGE TREATMENT PLANT
DrainEFFICIENT UNDERGROUND DRAINAGE SYSTEM PROPOSED. THE SURFACERUNOFF FROM THE ROD, OPEN SPACES AND AREA TOHER THAN ROOF TOPS WILL BE TRANSPORTED THROUGH THE SYSTEM TO THE NEARESTEXISTING WATER BODY FOR THE HARVESTING AND THE OVERFLOW FROM THE WATER BODIES WILL BE DISPOSED OFF IN THE EXISTING DRAIN, STORM WATER RCC LINE WITH 250 MM TO 300 MM
ParksGREENERY DEVELOPMENT IN TOWNSHIP IS PROPOSED IN THE PARK. THESE GREEN SPACES ARE PROVIDEDWITH THE SECTORS CREATINGHEALTHY AND MODERATE ENVIRONMENT FOR THE RESIDENTS OF HOUSING, SPACIOUS PARK AREA 1590 SQ MTRS
Tree PlantingPLANT LOCAL SPECIES TREES ON THEBOUNDARIES, ROADS, PARKS AND ON THECOMMON AREAS, PLANTS AND GRASS HAVE CONSISTENTLY BEING PLANTED AND MORE WILL BE PLANTED AS THE PROJECT CONTINUES.
Design For Electric Supply Including Street LightingTHE PROPOSED HOUSING SHALL SUPPLY ELECTRIC SUPPLYTHEROUGH 33KV -STATION FROM WHERE POWER SHALL BE SUPPLIED AT11 KV LEVEL THROUGH VARIOUSUNDERGROUND 11KV FEEDERS TO THE DISTRIBUATION TRANSFORMERSOF 11KV/433KV VARIATIONAND THE LT UNDERGROUND DISTRIBUTION SYSTEM, 100 SOLAR LIGHTINGS FOR STREET LIGHTING WITH ELECTRIC SUPPLY AS APPROVED BY DVVNL
Community BuildingsCOMMUNITY BUILDINGWITH VARIOUSCOMMUNITY ACTIVITIES PROPOSED IN HOUSING, COMMUNITY SPACE OF 1526 SQ MTRS IS PROVIDED
Treatment And Disposal System Of Sewage And Sullage WaterTREATMENT AND DISPOSAL SYSTEM OF SEWAGE AND SULLAGE WATER SHALL BE TREATED IN THE STP PROPOSED IN THE VARIOUS ZONES IN HOUSING, SEWERAGE TREATMENT PLANT OF 250 KLD CAPACITY WITH MBBR TECHNOLOGY
Solid Waste Management And Disposal SystemAS ALL WASTE SHALL BE SEGREGATED AT SOURCE ONLY AFTER THAT ALL THE ORGANIC WASTE GENERATED IN THE HOUSING SHALL BE USED IN THE TOWNSHIP AFTER ITS TREATMENT TO MAKE IT ZERO WASTE DISCHARGE HOUSING. HOWEVER THE E-WASTE AND TOXIC WASTE AND RECYCLABLE WASTE SHALL BE HANDED OVER TO AGENCY SUGGESTED BY ADA, ELSE WE SHALL HAND OVER SUCH WASTE TO THE HIRED GOVERNMENT APPROVED SOLID WASTE MANAGEMENT AGENCY, THROUGH STP
Water Conservation SystemEVERY HOUSEHOLD SHALL GETPIPED WATER SUPPLY THROUGH A DESIGNED SYSTEM AND NO AREA SHALL BE ALLOWED TO INSTALL THEIR OWN INDIVIDUAL SYSTEMOF WATER SUPPLY .I.E JET PUMPS, HAND PUMPS, INDIVIDUAL BORWELL, 3 NUMBER RAIN WATER HARVESTING PITS
Energy Management System Including Use Of Renewable EnergySOLAR LIGHT IN THE PARK/COMMON AND AREA SHALL BE PROVIDED PARTIALLY TO SAVE THE ENERGY.
Fire Protection And Fire Safety SystemNA
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesSUFFICIENT OPEN SPACES PROVIDED IN THETOWNSHIP FOR THE GATHERINGOF PEOPLE IN EMERGENCY
Other Miscellaneous WorkNA
Financials
Registration Fee (₹)112500
Project Duration (months)41