GAUR AERO HEIGHTS (POCKET-2)
by UP Township Infrastructure Private Limited
Ghaziabad, Uttar Pradesh · UPRERAPRJ941355
Total units
800
Overview
Registration Date2022-09-24
RERA NumberUPRERAPRJ941355
Promoter IDUPRERAPRM5788
Proposed Start2022-09-01
Proposed Completion2027-04-27
Location
DistrictGhaziabad
TehsilGhaziabad
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units800
Unit Types1
Blocks1
Floors15
Khasra records (1)
- Pocket-2, Land and Development Grahthan Yojana (Ajantapuram) Loni Road Ghaziabad UP· Plot· 765218 m²
Inventory
Apartments (16 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| RESIDENTIAL | 1 | 1 BHK | 50 | 23 | 0 | — |
| RESIDENTIAL | 2 | 1 BHK | 50 | 23 | 0 | — |
| RESIDENTIAL | 3 | 1 BHK | 50 | 23 | 0 | — |
| RESIDENTIAL | 4 | 1 BHK | 50 | 23 | 0 | — |
| RESIDENTIAL | 5 | 1 BHK | 50 | 23 | 0 | — |
| RESIDENTIAL | 6 | 1 BHK | 50 | 23 | 0 | — |
| RESIDENTIAL | 7 | 1 BHK | 50 | 23 | 0 | — |
| RESIDENTIAL | 8 | 1 BHK | 50 | 23 | 0 | — |
| RESIDENTIAL | 9 | 1 BHK | 50 | 23 | 0 | — |
| RESIDENTIAL | 9 | 1 BHK | 50 | 23 | 0 | — |
| RESIDENTIAL | 10 | 1 BHK | 50 | 23 | 0 | — |
| RESIDENTIAL | 11 | 1 BHK | 50 | 23 | 0 | — |
| RESIDENTIAL | 12 | 1 BHK | 50 | 23 | 0 | — |
| RESIDENTIAL | 13 | 1 BHK | 50 | 23 | 0 | — |
| RESIDENTIAL | 14 | 1 BHK | 50 | 23 | 0 | — |
| RESIDENTIAL | 15 | 1 BHK | 50 | 23 | 0 | — |
Permits & Approvals
Permit No961/VN-5/OFFLINE/134/PART-VI
Permit Date2022-04-28
Valid Until2027-04-27
Extendable Until2030-04-26
Documents
Filing documents
- Details of Encumbrances
- Proforma of Completion Certificate(Occupancy)
- CA CERTIFICATE
- ENGINEERS CERTIFICATE
- Other
- Details of Encumbrances#New(2022-09-16)View
- Commencement Certificate#New(2022-08-22)View
- Other Plan(If Any)#New(2022-08-22)View
- Proforma of Application Form#New(2022-08-22)View
- Proforma of Allotment Letter#New(2022-08-22)View
- Proforma of Conveyance Deed#New(2022-08-22)View
- Waste Disposal Plan#New(2022-08-22)View
- Water Supply Plan#New(2022-08-22)View
- Electricity Supply Plan#New(2022-08-22)View
- Development Work Plan#New(2022-08-22)View
- Affidavit (Form-B)#New(2022-08-22)View
- CA CERTIFICATE#New(2022-09-12)View
- ARCHITECT CERTIFICATE#New(2022-08-22)View
- ENGINEERS CERTIFICATE#New(2022-09-04)View
- Other#New(2022-09-04)View
Land documents
- Registry Document#6876(2022-08-17)View5506071442Registry Deed.pdf
Project Team
Architect AddressOFFICE A-244 KAUSHAMBI GHAZIABAD (U.P)
Engineer AddressB-24, Sector-67, Noida
Developer & Contact
Developer
Promoter NameUP Township Infrastructure Private Limited
Promoter AddressGaur Biz Park Plot No-1 , Abhay Khand-II, Indirapuram, Ghaziabad. U.P. Pin-201014
Company TypeCompany
Mobile9582279254
Emailgaursuptownship@gaursonsindia.com
Registered AddressGaur Biz Park Plot No-1 , Abhay Khand-II, Indirapuram, Ghaziabad. U.P. Pin-201014
Contractor AddressBHATTA COLONY NEAR RITA HOSPITAL, BHANGEL, NOIDA
Bank Accounts
Account Typecollection
Account Number777705140822
Account NameUP Township Infrastructure Pvt Ltd-Collection A/C Gaur Aero Heights -(POCKET2)
Bank NameICICI BANK
BranchICICI Bank Ltd, Noida Sector-61
Branch AddressICICI Bank Ltd, Supertech Shopprix, C134 B, Sector-61, Noida, UP 201307
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCICIC0000253
Account Typeseparate
Account Number777705150822
Account NameUP Township Infrastructure Pvt Ltd-Seperate A/C Gaur Aero Heights (POCKET2)
Bank NameICICI BANK
BranchICICI Bank Ltd, Noida, Sector-61
Branch AddressICICI Bank Ltd, Supertech Shopprix, C134 B Sector-61, Noida UP-201307
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCICIC0000253
Account Typetransaction
Account Number777705160822
Account NameUP Township Infrastructure Pvt Ltd-RERA Transaction A/C Gaur Aero Heights (POCKET2)
Bank NameICICI BANK
BranchICICI Bank Ltd, Noida, Sector-61
Branch AddressICICI Bank Ltd, Supertech Shopprix, C134 B Sector-61, Noida UP-201307
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCICIC0000253
Development & Facilities
Development works
Demarcation Of PlotsDEMARCATION OF PLOTS AS PER THE SANCTION LAYOUT PLAN
Boundary WallBOUNDARY WALL AS PER THE SANCTION LAYOUT PLAN - HEIGHT UPTO 1.8 M
Road WorkINTERNAL ROAD WORK DESIGNED OF DIFFERENT RIGHT OF WAY(ROW) AS PER THE REQUIREMENT - INTERNAL ROADS 6M WIDE
FootpathsFOOTPATHS AS PER THE SANCTIONED LAYOUT PLAN
Water Supply Including Drinking Water FacilitiesMUNICIPAL WATER SUPPLY IS USED FOR DRINKING PURPOSE
Sewer SystemSEWERAGE SYSTEM IS USED AS PER THE DESIGNED CALCULATION
DrainSEPARATE DRAINAGE SYSTEM LINE IS USED AS PER THE DESIGN REQUIREMENT
ParksLANDSCAPE AREA IS PROVIDED AS PER THE LOCAL BUILDING BYE LAWS
Tree Planting40 NUMBER OF TREES AS PER THE APPROVED DRAWING AND REQUIREMENT
Design For Electric Supply Including Street LightingELECTRICAL SUPPLY INCLUDING STREET LIGHTING IS PROVIDED AS PER THE LAYOUT PLAN
Community BuildingsN.A.
Treatment And Disposal System Of Sewage And Sullage WaterDISPOSAL SYSTEM OF SEWAGE AND SULLAGE WATER IS BEING USED THROUGH SEWERAGE TREATMENT PLANT WHICH IS USED FOR LANDSCAPE AND FLUSHING PURPOSE - SEWERAGE TREATMENT PLANT 320 KLD APPROX.
Solid Waste Management And Disposal SystemALL THE SOLID WASTE MANAGED AS PER THE BIO DEGRADABLE WASTE CONVERTED IN COMPOST AND NON BIO DEGRADABLE DELIVERED TO REGISTERED RECYCLABLE AGENCIES - SOLID WASTE GENERATED APPROX 1.924 TON PER DAY.
Water Conservation SystemLOW FLOW WATER FIXTURES BEING USED FOR WATER CONSERVATION AND STP WATER IS USED FOR LANDSCAPE AND FLUSHING PURPOSE.
Energy Management System Including Use Of Renewable EnergyN.A.
Fire Protection And Fire Safety SystemFIRE SYSTEM AND FIRE SAFETY WILL BE INSTALLED IN BUILDING AS PER THE NBC NORMS - INCLUDING FIRE HOSE REEL AND SPRINKLER SYSTEM
Social Infrastructure And Other Public Amenities Including Public Health ServicesN.A.
Emergency Evacuation ServicesAS PER THE MANAGEMENT PLAN AND DISASTER MANAGEMENT P[LAN. ALL PROVISIONS ARE MADE INCLUDING FIRE ASSEMBLY POINT.
Other Miscellaneous WorkOTHER MISCELLANEOUS WORK IS PROVIDED AS PER THE LAYOUT PLAN
Financials
Registration Fee (₹)43500
Project Duration (months)56