Registered
Overview
Registration Date2026-05-04
RERA NumberUPRERAPRJ153394/05/2026
Promoter IDUPRERAPRM251067
Proposed Start2026-01-01
Proposed Completion2029-06-07
Location
DistrictBudaun
TehsilBudaun
VillageVILLAGE KHUNAK
AddressVILLAGE KHUNAK, DISTT BUDAUN
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Khasra records (1)
- 42,54,54/1,54/2,54/3,55,56,57,65· Khasra· 49414 m²
Permits & Approvals
Permit No172/ZILA PANCHAYAT/MAP/2023-24
Permit Date2025-12-20
Valid Until2029-06-07
Extendable Until2031-06-07
Documents
Filing documents
- Electricity Supply Plan
- Proforma of Agreement for Sale
- Details of Encumbrances#New(2026-01-12)View
- Commencement Certificate#New(2026-01-12)View
- Other Plan(If Any)#New(2026-01-12)View
- Proforma of Application Form#New(2026-01-12)View
- Proforma of Allotment Letter#New(2026-01-12)View
- Proforma of Conveyance Deed#New(2026-01-12)View
- Waste Disposal Plan#New(2026-02-14)View
- Water Supply Plan#New(2026-02-14)View
- Electricity Supply Plan#New(2026-02-04)View
- Development Work Plan#New(2026-02-14)View
- Affidavit (Form-B)#New(2026-01-12)View
- CA CERTIFICATE#New(2026-02-08)View
- ARCHITECT CERTIFICATE#New(2026-01-12)View
- ENGINEERS CERTIFICATE#New(2026-02-04)View
- Other#New(2026-01-12)View
- Proforma of Agreement for Sale#New(2026-02-14)View
Land documents
- Extract of Khatauni#1425-1430(1900-01-01)View18816643971.pdf
- Extract of Khatauni#1425-1430(1900-01-01)View18816643781.pdf
- Sale Deed#10308(2016-12-20)View18816647538.pdf
- Registry Document#2852(2026-03-11)View18816643207.pdf
- Sale Deed#8141(2022-10-19)View18816642893.pdf
- Sale Deed#10308(2016-12-20)View18816647758.pdf
- Extract of Khatauni#DIVISION ORDER(1900-01-01)View18816645509.pdf
Project Team
Architect AddressP-7, D D PURAM,BAREILLY
Engineer AddressSURAJMUKHI COMPLEX, NEAR BOB, MADINATH, BAREILLY
Developer & Contact
Developer
Promoter NameKIPL CONSTRUCTIONS PRIVATE LIMITED
Promoter Address113 CIVIL LINES BAREILLY UTTAR PRADESH 243001
Company TypeCompany
Mobile9634033813
Emailglobalcitybudaon@rediffmail.com
Registered Address113 CIVIL LINES BAREILLY UTTAR PRADESH 243001
Contractor AddressPRAHALADPUR, BHOJIPURA, BAREILLY UP 243202
Bank Accounts
Account Typecollection
Account Number0824102100000048
Account NameKIPL CONSTRUCTIONS PRIVATE LIMITED RERA COLLECTION ACCOUNT FOR GLOBAL CITY 2
Bank NamePUNJAB NATIONAL BANK
BranchINDIRA CHOWK
Branch AddressCIVIL LINES, BADAUN
Branch DistrictBudaun
Branch StateUttar Pradesh
IFSCPUNB0082410
Branch Emailbo082410@pnb.bank.in
Account Typeseparate
Account Number0824102900000057
Account NameKIPL CONSTRUCTIONS PRIVATE LIMITED RERA SEPARATE ACCOUNT FOR GLOBAL CITY 2
Bank NamePUNJAB NATIONAL BANK
BranchINDIRA CHOWK
Branch AddressCIVIL LINES BUDAUN
Branch DistrictBudaun
Branch StateUttar Pradesh
IFSCPUNB0082410
Account Typetransaction
Account Number0824102900002004
Account NameKIPS CONSTRUCTIONS PRIVATE LIMITED RERA TRANSACTION ACCOUNT FOR GLOBAL CITY 2
Bank NamePUNJAB NATIONAL BANK
BranchINDIRA CHOWK
Branch AddressCIVIL LINES BUSAUN
Branch DistrictBudaun
Branch StateUttar Pradesh
IFSCPUNB0082410
Development & Facilities
Development works
Demarcation Of Plotswe have opted one plot of size 49414 sq mtr having 1 entrance gate from the 9.00 mtr wide road
Boundary WallRCC Framed Brick wall 8"0 Height Work in Comumn and beam. Boundry wall 1476.90 Mt Long
Road WorkFrom the main entrance gate we have 80mm thick cement concret. RCC road through out the project
FootpathsWe would provide Chequered Tiles in footpath, footpath 1.50m Wide with drain
Water Supply Including Drinking Water FacilitiesWe will provide water supply from 1 no. overhead water tank having capacity 500 LTR
Sewer SystemModular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connected with the Municipal sewerage system when come into force. STP of 300KLD Sewage Treatment.
DrainStorm water shall be provided . Storm water from roads and other landscape area shall be connected to the storm water drain channel and go to the Rain water harvesting with open drain covered with iron cover.
ParksWe will provide green grass with the different activities and the green area will have gaming/rides for children and benches.
Tree PlantingWe will provide many type of trees all round the park boundary wall and green area. Approx 1000 Tree Planting provide in this project
Design For Electric Supply Including Street LightingWe will design and implement the system as per local electricity Board and will consider Electric Pole on road. we will provide 4 (Four) D G sets 122.50 KV (Total)
Community BuildingsNA
Treatment And Disposal System Of Sewage And Sullage WaterModular Sewerage system shall be provided . All Sewerage water shall be go the STP and Overflow from the STP shall be connect with the Municipal sewerage system, when come into force. STP of 300 KLD Sewage Treatment.
Solid Waste Management And Disposal SystemThere are a proper garbage/dustbin area located in different places for the solid waste management
Water Conservation SystemWe will suggest to individual to use low fixtures and raw water harvesting system to reduce the water consumption and improve the ground water level
Energy Management System Including Use Of Renewable EnergyWe will use Solar street Lights fitting in external area and LED lights and we will suggest to individual also to use. 35 percent solar lights fittings in external area
Fire Protection And Fire Safety SystemNA
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesNA
Other Miscellaneous WorkNA
Financials
Registration Fee (₹)252500
Project Duration (months)42