Golden I Apartment

by Golden I Infrastructure

Bareilly, Uttar Pradesh · UPRERAPRJ972852

Registered

Total units

150

Overview

Registration Date2023-03-21
RERA NumberUPRERAPRJ972852
Promoter IDUPRERAPRM223147
Proposed Start2023-03-01
Proposed Completion2028-02-08

Location

DistrictBareilly
TehsilBareilly
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Total Units150
Unit Types2
Blocks5
Floors6

Khasra records (3)

  • 1/1· Khasra· 980
  • 1/2· Khasra· 2240
  • 3/2· Khasra· 2634

Inventory

Apartments (78 rows)
BlockFloorTypeCountCarpet (m²)BalconyGarage
TOWER-A13 BHK188.42
TOWER-A12 BHK165.941
TOWER-A12 BHK165.751
TOWER-A12 BHK163.421
TOWER-A23 BHK188.42
TOWER-A22 BHK165.941
TOWER-A22 BHK165.751
TOWER-A22 BHK163.421
TOWER-A33 BHK188.42
TOWER-A32 BHK165.941
TOWER-A32 BHK165.751
TOWER-A32 BHK163.421
TOWER-A43 BHK188.42
TOWER-A42 BHK165.941
TOWER-A42 BHK165.751
TOWER-A42 BHK163.421
TOWER-A53 BHK188.42
TOWER-A52 BHK165.941
TOWER-A52 BHK165.751
TOWER-A52 BHK163.421
TOWER-A63 BHK188.42
TOWER-A62 BHK165.941
TOWER-A62 BHK165.751
TOWER-A62 BHK163.421
TOWER-B13 BHK181.683
TOWER-B12 BHK165.761
TOWER-B12 BHK163.421
TOWER-B23 BHK181.683
TOWER-B22 BHK165.761
TOWER-B22 BHK163.421
TOWER-B33 BHK181.683
TOWER-B32 BHK165.761
TOWER-B32 BHK163.421
TOWER-B43 BHK181.683
TOWER-B42 BHK165.761
TOWER-B42 BHK163.421
TOWER-B53 BHK181.683
TOWER-B52 BHK165.761
TOWER-B52 BHK163.421
TOWER-B63 BHK181.683
TOWER-B62 BHK165.761
TOWER-B62 BHK163.421
TOWER-C12 BHK163.871
TOWER-C12 BHK765.941
TOWER-C22 BHK163.871
TOWER-C22 BHK765.941
TOWER-C32 BHK163.871
TOWER-C32 BHK765.941
TOWER-C42 BHK163.871
TOWER-C42 BHK765.941
TOWER-C52 BHK163.871
TOWER-C52 BHK765.941
TOWER-C62 BHK163.871
TOWER-C62 BHK765.941
TOWER-D13 BHK187.853
TOWER-D12 BHK465.751
TOWER-D23 BHK187.853
TOWER-D22 BHK465.751
TOWER-D33 BHK187.853
TOWER-D32 BHK465.751
TOWER-D43 BHK187.853
TOWER-D42 BHK465.751
TOWER-D53 BHK187.853
TOWER-D52 BHK465.751
TOWER-D63 BHK187.853
TOWER-D62 BHK465.751
TOWER-E13 BHK185.683
TOWER-E12 BHK465.751
TOWER-E23 BHK185.683
TOWER-E22 BHK465.751
TOWER-E33 BHK185.683
TOWER-E32 BHK465.751
TOWER-E43 BHK185.683
TOWER-E42 BHK465.751
TOWER-E53 BHK185.683
TOWER-E52 BHK465.751
TOWER-E63 BHK185.683
TOWER-E62 BHK465.751

Permits & Approvals

Permit NoAffordable Housing/01506/BDA/BP/22-23/0092/23112022
Permit Date2023-02-09
Valid Until2028-02-08
Extendable Until2031-02-08

Documents

Filing documents

  • Commencement Certificate
  • Other Plan(If Any)
  • Proforma of Completion Certificate(Occupancy)
  • CA CERTIFICATE
  • General body resolution for AoA (if Authorized Entity is AoA)
  • Notarized Affidavit for completion of balance development work
  • Details of Encumbrances#New(2023-03-04)
    View
  • Commencement Certificate#New(2023-03-04)
    View
  • Proforma of Application Form#New(2023-03-02)
    View
  • Proforma of Allotment Letter#New(2023-03-02)
    View
  • Proforma of Conveyance Deed#New(2023-03-02)
    View
  • Waste Disposal Plan#New(2023-03-02)
    View
  • Water Supply Plan#New(2023-03-02)
    View
  • Electricity Supply Plan#New(2023-03-02)
    View
  • Development Work Plan#New(2023-03-04)
    View
  • Affidavit (Form-B)#New(2023-03-02)
    View
  • CA CERTIFICATE#New(2023-03-16)
    View
  • ARCHITECT CERTIFICATE#New(2023-03-02)
    View
  • ENGINEERS CERTIFICATE#New(2023-03-02)
    View
  • Other#New(2023-03-02)
    View

Land documents

  • Registry Document#6763(2022-04-30)
    6958368917Registry-1.pdf
    View
  • Registry Document#6764(2022-04-30)
    6958367852Registry-2.pdf
    View
  • Registry Document#6765(2022-04-30)
    6958362086Registry-3.pdf
    View
  • Extract of Khatauni#Reply to objection letter(1900-01-01)
    6958366723Reply to objection letter - Golden Apartment.pdf
    View

Project Team

Architect AddressP6/7, DEEN DAYAL PURAM, BAREILLY
Engineer Address586/6, JAGRITI VIHAR, MEERUT

Developer & Contact

Developer

Promoter NameGolden I Infrastructure
Promoter AddressNEAR ST. FRANCSIS SCHOOL, STADIUM ROAD, EKTA NAGAR CHAURAHA, BAREILLY 243001
Company TypePartnership Firm
Mobile9897891916
Emailgoldeniinfrabareilly@gmail.com
Registered AddressNEAR ST. FRANCSIS SCHOOL, STADIUM ROAD, EKTA NAGAR CHAURAHA, BAREILLY 243001
Contractor AddressTULSI NAGAR, BAREILLY

Development & Facilities

Development works

Demarcation Of PlotsWe have one plot of size 5789.86 sq. mtr.having 1 main entrance gate from the 12 m & 9 mtr wide road.
Boundary WallR.C.C. Framed Brick wall 8’0” Height work in column and beam.
Road WorkFrom the main entrance gate we have 80 mm thick Cement Concret. RCC road through out the project.
FootpathsWe would provide Chequered Tiles in footpath
Water Supply Including Drinking Water FacilitiesWe will provide Three nos. boring inside campus for water supply as per the requirements.
Sewer SystemModular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.when come into force.
DrainStorm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting with open drain covered with iron cover
ParksWe will provide green grass with the different activities and the green area will have gaming /riders facilities for children and benches.
Tree PlantingWe will provide many type of trees all around the boundary wall & green area
Design For Electric Supply Including Street LightingWe will design & implement the system as per local electricity Board and will consider Electric Pole around Boundary wall with Panel Room in Stilt Floor.
Community BuildingsNA
Treatment And Disposal System Of Sewage And Sullage WaterModular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.,when come into force.
Solid Waste Management And Disposal SystemThere are a proper garbage/dustbin area located in different places for the solid waste management
Water Conservation SystemWe will suggest to individual to use low flow fixtures and raw water harvesting system to reduce the water consumption and improve the ground water level.
Energy Management System Including Use Of Renewable EnergyWe will use Solar Street Lights fitting in external area and LED lights. . And we will suggest to individual also to use.
Fire Protection And Fire Safety SystemThis Project has only Residential flats. Hence we will provide Fire Fighting facility in common areas while Individual owner can install their own system as per their and local authorities requirement.
Social Infrastructure And Other Public Amenities Including Public Health ServicesN A
Emergency Evacuation ServicesWe have Proposed Fire Staircase designed for any emergency
Other Miscellaneous WorkN A

Financials

Registration Fee (₹)34000
Project Duration (months)60