Registered
Total units
150
Overview
Registration Date2023-03-21
RERA NumberUPRERAPRJ972852
Promoter IDUPRERAPRM223147
Proposed Start2023-03-01
Proposed Completion2028-02-08
Location
DistrictBareilly
TehsilBareilly
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units150
Unit Types2
Blocks5
Floors6
Khasra records (3)
- 1/1· Khasra· 980 m²
- 1/2· Khasra· 2240 m²
- 3/2· Khasra· 2634 m²
Inventory
Apartments (78 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| TOWER-A | 1 | 3 BHK | 1 | 88.4 | 2 | — |
| TOWER-A | 1 | 2 BHK | 1 | 65.94 | 1 | — |
| TOWER-A | 1 | 2 BHK | 1 | 65.75 | 1 | — |
| TOWER-A | 1 | 2 BHK | 1 | 63.42 | 1 | — |
| TOWER-A | 2 | 3 BHK | 1 | 88.4 | 2 | — |
| TOWER-A | 2 | 2 BHK | 1 | 65.94 | 1 | — |
| TOWER-A | 2 | 2 BHK | 1 | 65.75 | 1 | — |
| TOWER-A | 2 | 2 BHK | 1 | 63.42 | 1 | — |
| TOWER-A | 3 | 3 BHK | 1 | 88.4 | 2 | — |
| TOWER-A | 3 | 2 BHK | 1 | 65.94 | 1 | — |
| TOWER-A | 3 | 2 BHK | 1 | 65.75 | 1 | — |
| TOWER-A | 3 | 2 BHK | 1 | 63.42 | 1 | — |
| TOWER-A | 4 | 3 BHK | 1 | 88.4 | 2 | — |
| TOWER-A | 4 | 2 BHK | 1 | 65.94 | 1 | — |
| TOWER-A | 4 | 2 BHK | 1 | 65.75 | 1 | — |
| TOWER-A | 4 | 2 BHK | 1 | 63.42 | 1 | — |
| TOWER-A | 5 | 3 BHK | 1 | 88.4 | 2 | — |
| TOWER-A | 5 | 2 BHK | 1 | 65.94 | 1 | — |
| TOWER-A | 5 | 2 BHK | 1 | 65.75 | 1 | — |
| TOWER-A | 5 | 2 BHK | 1 | 63.42 | 1 | — |
| TOWER-A | 6 | 3 BHK | 1 | 88.4 | 2 | — |
| TOWER-A | 6 | 2 BHK | 1 | 65.94 | 1 | — |
| TOWER-A | 6 | 2 BHK | 1 | 65.75 | 1 | — |
| TOWER-A | 6 | 2 BHK | 1 | 63.42 | 1 | — |
| TOWER-B | 1 | 3 BHK | 1 | 81.68 | 3 | — |
| TOWER-B | 1 | 2 BHK | 1 | 65.76 | 1 | — |
| TOWER-B | 1 | 2 BHK | 1 | 63.42 | 1 | — |
| TOWER-B | 2 | 3 BHK | 1 | 81.68 | 3 | — |
| TOWER-B | 2 | 2 BHK | 1 | 65.76 | 1 | — |
| TOWER-B | 2 | 2 BHK | 1 | 63.42 | 1 | — |
| TOWER-B | 3 | 3 BHK | 1 | 81.68 | 3 | — |
| TOWER-B | 3 | 2 BHK | 1 | 65.76 | 1 | — |
| TOWER-B | 3 | 2 BHK | 1 | 63.42 | 1 | — |
| TOWER-B | 4 | 3 BHK | 1 | 81.68 | 3 | — |
| TOWER-B | 4 | 2 BHK | 1 | 65.76 | 1 | — |
| TOWER-B | 4 | 2 BHK | 1 | 63.42 | 1 | — |
| TOWER-B | 5 | 3 BHK | 1 | 81.68 | 3 | — |
| TOWER-B | 5 | 2 BHK | 1 | 65.76 | 1 | — |
| TOWER-B | 5 | 2 BHK | 1 | 63.42 | 1 | — |
| TOWER-B | 6 | 3 BHK | 1 | 81.68 | 3 | — |
| TOWER-B | 6 | 2 BHK | 1 | 65.76 | 1 | — |
| TOWER-B | 6 | 2 BHK | 1 | 63.42 | 1 | — |
| TOWER-C | 1 | 2 BHK | 1 | 63.87 | 1 | — |
| TOWER-C | 1 | 2 BHK | 7 | 65.94 | 1 | — |
| TOWER-C | 2 | 2 BHK | 1 | 63.87 | 1 | — |
| TOWER-C | 2 | 2 BHK | 7 | 65.94 | 1 | — |
| TOWER-C | 3 | 2 BHK | 1 | 63.87 | 1 | — |
| TOWER-C | 3 | 2 BHK | 7 | 65.94 | 1 | — |
| TOWER-C | 4 | 2 BHK | 1 | 63.87 | 1 | — |
| TOWER-C | 4 | 2 BHK | 7 | 65.94 | 1 | — |
| TOWER-C | 5 | 2 BHK | 1 | 63.87 | 1 | — |
| TOWER-C | 5 | 2 BHK | 7 | 65.94 | 1 | — |
| TOWER-C | 6 | 2 BHK | 1 | 63.87 | 1 | — |
| TOWER-C | 6 | 2 BHK | 7 | 65.94 | 1 | — |
| TOWER-D | 1 | 3 BHK | 1 | 87.85 | 3 | — |
| TOWER-D | 1 | 2 BHK | 4 | 65.75 | 1 | — |
| TOWER-D | 2 | 3 BHK | 1 | 87.85 | 3 | — |
| TOWER-D | 2 | 2 BHK | 4 | 65.75 | 1 | — |
| TOWER-D | 3 | 3 BHK | 1 | 87.85 | 3 | — |
| TOWER-D | 3 | 2 BHK | 4 | 65.75 | 1 | — |
| TOWER-D | 4 | 3 BHK | 1 | 87.85 | 3 | — |
| TOWER-D | 4 | 2 BHK | 4 | 65.75 | 1 | — |
| TOWER-D | 5 | 3 BHK | 1 | 87.85 | 3 | — |
| TOWER-D | 5 | 2 BHK | 4 | 65.75 | 1 | — |
| TOWER-D | 6 | 3 BHK | 1 | 87.85 | 3 | — |
| TOWER-D | 6 | 2 BHK | 4 | 65.75 | 1 | — |
| TOWER-E | 1 | 3 BHK | 1 | 85.68 | 3 | — |
| TOWER-E | 1 | 2 BHK | 4 | 65.75 | 1 | — |
| TOWER-E | 2 | 3 BHK | 1 | 85.68 | 3 | — |
| TOWER-E | 2 | 2 BHK | 4 | 65.75 | 1 | — |
| TOWER-E | 3 | 3 BHK | 1 | 85.68 | 3 | — |
| TOWER-E | 3 | 2 BHK | 4 | 65.75 | 1 | — |
| TOWER-E | 4 | 3 BHK | 1 | 85.68 | 3 | — |
| TOWER-E | 4 | 2 BHK | 4 | 65.75 | 1 | — |
| TOWER-E | 5 | 3 BHK | 1 | 85.68 | 3 | — |
| TOWER-E | 5 | 2 BHK | 4 | 65.75 | 1 | — |
| TOWER-E | 6 | 3 BHK | 1 | 85.68 | 3 | — |
| TOWER-E | 6 | 2 BHK | 4 | 65.75 | 1 | — |
Permits & Approvals
Permit NoAffordable Housing/01506/BDA/BP/22-23/0092/23112022
Permit Date2023-02-09
Valid Until2028-02-08
Extendable Until2031-02-08
Documents
Filing documents
- Commencement Certificate
- Other Plan(If Any)
- Proforma of Completion Certificate(Occupancy)
- CA CERTIFICATE
- General body resolution for AoA (if Authorized Entity is AoA)
- Notarized Affidavit for completion of balance development work
- Details of Encumbrances#New(2023-03-04)View
- Commencement Certificate#New(2023-03-04)View
- Proforma of Application Form#New(2023-03-02)View
- Proforma of Allotment Letter#New(2023-03-02)View
- Proforma of Conveyance Deed#New(2023-03-02)View
- Waste Disposal Plan#New(2023-03-02)View
- Water Supply Plan#New(2023-03-02)View
- Electricity Supply Plan#New(2023-03-02)View
- Development Work Plan#New(2023-03-04)View
- Affidavit (Form-B)#New(2023-03-02)View
- CA CERTIFICATE#New(2023-03-16)View
- ARCHITECT CERTIFICATE#New(2023-03-02)View
- ENGINEERS CERTIFICATE#New(2023-03-02)View
- Other#New(2023-03-02)View
Land documents
- Registry Document#6763(2022-04-30)View6958368917Registry-1.pdf
- Registry Document#6764(2022-04-30)View6958367852Registry-2.pdf
- Registry Document#6765(2022-04-30)View6958362086Registry-3.pdf
- Extract of Khatauni#Reply to objection letter(1900-01-01)View6958366723Reply to objection letter - Golden Apartment.pdf
Project Team
Architect AddressP6/7, DEEN DAYAL PURAM, BAREILLY
Engineer Address586/6, JAGRITI VIHAR, MEERUT
Developer & Contact
Developer
Promoter NameGolden I Infrastructure
Promoter AddressNEAR ST. FRANCSIS SCHOOL, STADIUM ROAD, EKTA NAGAR CHAURAHA, BAREILLY 243001
Company TypePartnership Firm
Mobile9897891916
Emailgoldeniinfrabareilly@gmail.com
Registered AddressNEAR ST. FRANCSIS SCHOOL, STADIUM ROAD, EKTA NAGAR CHAURAHA, BAREILLY 243001
Contractor AddressTULSI NAGAR, BAREILLY
Development & Facilities
Development works
Demarcation Of PlotsWe have one plot of size 5789.86 sq. mtr.having 1 main entrance gate from the 12 m & 9 mtr wide road.
Boundary WallR.C.C. Framed Brick wall 8’0” Height work in column and beam.
Road WorkFrom the main entrance gate we have 80 mm thick Cement Concret. RCC road through out the project.
FootpathsWe would provide Chequered Tiles in footpath
Water Supply Including Drinking Water FacilitiesWe will provide Three nos. boring inside campus for water supply as per the requirements.
Sewer SystemModular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.when come into force.
DrainStorm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting with open drain covered with iron cover
ParksWe will provide green grass with the different activities and the green area will have gaming /riders facilities for children and benches.
Tree PlantingWe will provide many type of trees all around the boundary wall & green area
Design For Electric Supply Including Street LightingWe will design & implement the system as per local electricity Board and will consider Electric Pole around Boundary wall with Panel Room in Stilt Floor.
Community BuildingsNA
Treatment And Disposal System Of Sewage And Sullage WaterModular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.,when come into force.
Solid Waste Management And Disposal SystemThere are a proper garbage/dustbin area located in different places for the solid waste management
Water Conservation SystemWe will suggest to individual to use low flow fixtures and raw water harvesting system to reduce the water consumption and improve the ground water level.
Energy Management System Including Use Of Renewable EnergyWe will use Solar Street Lights fitting in external area and LED lights. . And we will suggest to individual also to use.
Fire Protection And Fire Safety SystemThis Project has only Residential flats. Hence we will provide Fire Fighting facility in common areas while Individual owner can install their own system as per their and local authorities requirement.
Social Infrastructure And Other Public Amenities Including Public Health ServicesN A
Emergency Evacuation ServicesWe have Proposed Fire Staircase designed for any emergency
Other Miscellaneous WorkN A
Financials
Registration Fee (₹)34000
Project Duration (months)60