Golden I Phase-III
by OCEAN INFRAHEIGHTS PRIVATE LIMITED
Gautam Buddha Nagar, Uttar Pradesh · UPRERAPRJ732580
Total units
500
Overview
Registration Date2022-01-05
RERA NumberUPRERAPRJ732580
Promoter IDUPRERAPRM5807
Proposed Start2022-07-01
Location
DistrictGautam Buddha Nagar
TehsilGautam Buddha Nagar
AddressPlot No. 11, Tech Zone 4, Greater NOIDA (West), Gautam Buddha Nagar, UP – 201318
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units500
Unit Types1
Blocks1
Floors15
Khasra records (1)
- Plot No. 11, Sector Techzone- IV, Greater Noida West· Plot· 10003570 m²
Inventory
Apartments (73 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| T4 | GF | OTHER | 13 | 34.8 | 0 | — |
| T4 | GF | OTHER | 17 | 37.2 | 0 | — |
| T4 | GF | OTHER | 2 | 39.06 | 0 | — |
| T4 | 1 | OTHER | 13 | 34.8 | 1 | — |
| T4 | 1 | OTHER | 1 | 34.8 | 1 | — |
| T4 | 1 | OTHER | 1 | 34.8 | 1 | — |
| T4 | 1 | OTHER | 18 | 37.2 | 1 | — |
| T4 | 1 | OTHER | 3 | 39.06 | 1 | — |
| T4 | 2 | OTHER | 13 | 34.8 | 1 | — |
| T4 | 2 | OTHER | 1 | 34.8 | 1 | — |
| T4 | 2 | OTHER | 1 | 34.8 | 1 | — |
| T4 | 2 | OTHER | 18 | 37.2 | 1 | — |
| T4 | 2 | OTHER | 3 | 39.06 | 1 | — |
| T4 | 3 | OTHER | 13 | 34.8 | 1 | — |
| T4 | 3 | OTHER | 1 | 34.8 | 1 | — |
| T4 | 3 | OTHER | 1 | 34.8 | 1 | — |
| T4 | 3 | OTHER | 18 | 37.2 | 1 | — |
| T4 | 3 | OTHER | 3 | 39.06 | 1 | — |
| T4 | 4 | OTHER | 13 | 34.8 | 1 | — |
| T4 | 4 | OTHER | 1 | 34.8 | 1 | — |
| T4 | 4 | OTHER | 1 | 34.8 | 1 | — |
| T4 | 4 | OTHER | 18 | 37.2 | 1 | — |
| T4 | 4 | OTHER | 3 | 39.06 | 1 | — |
| T4 | 5 | OTHER | 13 | 34.8 | 1 | — |
| T4 | 5 | OTHER | 1 | 34.8 | 1 | — |
| T4 | 5 | OTHER | 1 | 34.8 | 1 | — |
| T4 | 5 | OTHER | 18 | 37.2 | 1 | — |
| T4 | 5 | OTHER | 3 | 39.06 | 1 | — |
| T4 | 6 | OTHER | 9 | 34.8 | 1 | — |
| T4 | 6 | OTHER | 17 | 37.2 | 1 | — |
| T4 | 6 | OTHER | 1 | 37.2 | 1 | — |
| T4 | 6 | OTHER | 3 | 39.06 | 1 | — |
| T4 | 6 | OTHER | 2 | 50.9 | 1 | — |
| T4 | 7 | OTHER | 9 | 34.8 | 1 | — |
| T4 | 7 | OTHER | 16 | 37.2 | 1 | — |
| T4 | 7 | OTHER | 2 | 37.2 | 1 | — |
| T4 | 7 | OTHER | 3 | 39.06 | 1 | — |
| T4 | 7 | OTHER | 2 | 50.9 | 1 | — |
| T4 | 8 | OTHER | 13 | 34.8 | 1 | — |
| T4 | 8 | OTHER | 1 | 34.8 | 1 | — |
| T4 | 8 | OTHER | 1 | 34.8 | 1 | — |
| T4 | 8 | OTHER | 18 | 37.2 | 1 | — |
| T4 | 8 | OTHER | 3 | 39.06 | 1 | — |
| T4 | 9 | OTHER | 13 | 34.8 | 1 | — |
| T4 | 9 | OTHER | 1 | 34.8 | 1 | — |
| T4 | 9 | OTHER | 1 | 34.8 | 1 | — |
| T4 | 9 | OTHER | 18 | 37.2 | 1 | — |
| T4 | 9 | OTHER | 3 | 39.06 | 1 | — |
| T4 | 10 | OTHER | 9 | 34.8 | 1 | — |
| T4 | 10 | OTHER | 17 | 37.2 | 1 | — |
| T4 | 10 | OTHER | 1 | 37.2 | 1 | — |
| T4 | 10 | OTHER | 3 | 39.06 | 1 | — |
| T4 | 10 | OTHER | 2 | 50.9 | 1 | — |
| T4 | 11 | OTHER | 9 | 34.8 | 1 | — |
| T4 | 11 | OTHER | 17 | 37.2 | 1 | — |
| T4 | 11 | OTHER | 1 | 37.2 | 1 | — |
| T4 | 11 | OTHER | 3 | 39.06 | 1 | — |
| T4 | 11 | OTHER | 2 | 50.9 | 1 | — |
| T4 | 12 | OTHER | 13 | 34.8 | 1 | — |
| T4 | 12 | OTHER | 1 | 34.8 | 1 | — |
| T4 | 12 | OTHER | 1 | 34.8 | 1 | — |
| T4 | 12 | OTHER | 18 | 37.2 | 1 | — |
| T4 | 12 | OTHER | 3 | 39.06 | 1 | — |
| T4 | 13 | OTHER | 13 | 34.8 | 1 | — |
| T4 | 13 | OTHER | 1 | 34.8 | 1 | — |
| T4 | 13 | OTHER | 1 | 34.8 | 1 | — |
| T4 | 13 | OTHER | 18 | 37.2 | 1 | — |
| T4 | 13 | OTHER | 3 | 39.06 | 1 | — |
| T4 | 14 | OTHER | 9 | 34.8 | 1 | — |
| T4 | 14 | OTHER | 1 | 35.26 | 1 | — |
| T4 | 14 | OTHER | 2 | 36.12 | 1 | — |
| T4 | 14 | OTHER | 2 | 36.12 | 1 | — |
| T4 | 14 | OTHER | 2 | 50.9 | 1 | — |
Permits & Approvals
Permit NoPLG/BP/SM-24-May-2019.5533
Permit Date2021-08-25
Valid Until2026-08-24
Extendable Until2031-08-24
Documents
Filing documents
- Other
- Details of Encumbrances#New(2021-11-23)View
- Commencement Certificate#New(2021-11-23)View
- Other Plan(If Any)#New(2021-11-23)View
- Proforma of Application Form#New(2021-11-23)View
- Proforma of Allotment Letter#New(2021-11-23)View
- Proforma of Conveyance Deed#New(2021-11-23)View
- Proforma of Completion Certificate(Occupancy)#New(2021-11-23)View
- Waste Disposal Plan#New(2021-11-23)View
- Water Supply Plan#New(2021-11-23)View
- Electricity Supply Plan#New(2021-11-23)View
- Development Work Plan#New(2021-11-23)View
- Affidavit (Form-B)#New(2021-11-23)View
- CA CERTIFICATE#New(2021-11-23)View
- ARCHITECT CERTIFICATE#New(2021-11-23)View
- ENGINEERS CERTIFICATE#New(2021-11-23)View
Land documents
- Lease Deed#18290(2013-07-23)View3439974714Lease Deed of Golden I Project.pdf
- Allotment Letter issued by Competent Authority#GNIDA/I.T./2016/9278(2016-12-22)View3439974449Letter from GNIDA Dated-22.12.2016.pdf
- Allotment Letter issued by Competent Authority#Land Title Search Report(2021-09-28)View3439975224Land Title Search Report of Golden I Project.pdf
- Allotment Letter issued by Competent Authority#Affidavit(2021-11-17)View3439971939Affidavit.pdf
- Allotment Letter issued by Competent Authority#Reply Letter to UPRERA for Objection Project Registration(2021-12-10)View3439974983Reply Letter to UPRERA.pdf
- OtherViewAffidavitGolden_AOA_Land10032026ssj.pdf
Project Team
Architect AddressA-2/1, Africa Avenue, Safadarjung Enclave, New Delhi-110029
Engineer AddressNNC Design International, G-70, 2nd Floor, Jaswant Plaza, Shaheen Bagh, New Delhi- 110025
Developer & Contact
Developer
Promoter NameOCEAN INFRAHEIGHTS PRIVATE LIMITED
Promoter AddressRegistered Office Address- Plot No. 11, Tech Zone 4, Greater NOIDA (West), Gautam Buddha Nagar, UP - 201318, Corporate Office Address- H-191, Sector-63, Noida, UP-201301, Site Address- Plot No. 11, Tech Zone 4, Greater NOIDA (West), Gautam Buddha Nagar, UP - 201318.
Company TypeCompany
Mobile9971188270
Emailaccount@thegolden-i.com
Registered AddressRegistered Office Address- Plot No. 11, Tech Zone 4, Greater NOIDA (West), Gautam Buddha Nagar, UP - 201318, Corporate Office Address- H-191, Sector-63, Noida, UP-201301, Site Address- Plot No. 11, Tech Zone 4, Greater NOIDA (West), Gautam Buddha Nagar, UP - 201318.
Contractor AddressPlot No. 11, Sector Techzone 4, Greater Noida West , Greater Noida, Gautam Buddha Nagar, Uttar Pradesh
Bank Accounts
Account Typecollection
Account Number921020049093010
Account NameOcean Infraheights Pvt. Ltd. Collection Account for Golden I Phase-III
Bank NameAxis Bank Limited
BranchSector-62, NOIDA
Branch AddressThe Corenthum , GF, Office No.1, Lobe-05 Tower A, Plot No.A-41,Sector 62, NOIDA, Uttar Pradesh, PIN-201301
Branch DistrictGautam Buddha Nagar
IFSCUTIB0000723
Account Typeseparate
Account Number921020048959151
Account NameOcean Infraheights Pvt. Ltd. Separate Bank Account for Golden I Phase-III
Bank NameAxis Bank Limited
BranchSector 62, NOIDA
Branch AddressThe Corenthum, GF, Office No. 1, Lobe-05 Tower A, Plot No. A-41, Sector 62, NOIDA, Uttar Pradesh, PIN- 201301
Branch DistrictGautam Buddha Nagar
IFSCUTIB0000723
Account Typetransaction
Account Number921020048677239
Account NameOcean Infraheights Pvt. Ltd. RERA Transaction Account for Golden I Phase-III
Bank NameAxis Bank Limited
BranchSector 62, NOIDA
Branch AddressThe Corenthum, GF, Office No. 1, Lobe-05 Tower A, Plot No. A-41, Sector 62, NOIDA, Uttar Pradesh, PIN- 201301
Branch DistrictGautam Buddha Nagar
IFSCUTIB0000723
Development & Facilities
Development works
Demarcation Of PlotsPlot No.-11, Sector Techzoe-4,Greater Noida( West) demarcation has been done Greater Noida Industrial Development Authority ( GNIDA). Phase III is shown as per site Plan.
Boundary WallBoundary wall shall be secured by natural wall of out facing shops other barrier.
Road WorkRoad work will be done using R.C.C./ interlocking tiles as per Sanctioned Plan.
FootpathsFootpath will be constructed using interlocking / Paver as per Sanctioned Plan.
Water Supply Including Drinking Water FacilitiesDrinking Water will be provided by government supply and it will be stored in under ground / overhead tanks and STP treated water will be available for gardening and flushing as per Plans.
Sewer SystemProper Sewerage system will be constructed using R.C.C./ UPVC pipes as per drawings and it will be treated with STP. STP treated water will be used as mentioned above and residual will be disposed of in government sewerage system.
DrainDraining System will be constructed using R.C.C./ UPVC pipes as per drawings.
ParksProper Park/ Green Area will be developed as per Sanctioned layout Plans.
Tree PlantingSufficient number of trees as per Sanctioned Layout will be planted in the project.
Design For Electric Supply Including Street LightingHT Electrical supply will be made by NPCL / competent authority , a sub station will be set-up in project as per drawings and LT electrical supply will be available for individual unit(s) . Sufficient power backup arrangement will be made using DG Sets. Street Lighting will be done using LT supply / Power back-up.
Community BuildingsNo
Treatment And Disposal System Of Sewage And Sullage WaterSewerage Treatment plant will be installed / constructed as per approved drawings. All sewerage will be treated and treated water will be available for gardening and flushing and residual of sewerage treatment plant will be drained in government sewer system.
Solid Waste Management And Disposal SystemSolid waste will be collected manually and disposal will be done as per norms.
Water Conservation SystemWater conservation will be done by rain water harvesting system and through Sewerage Treatment Plant( STP).
Energy Management System Including Use Of Renewable EnergyGood quality and approved brand equipment will be used in sub -station to minimize energy loss and Solar Energy System will be installed as per norms and approved drawings.
Fire Protection And Fire Safety SystemFire Fighting system including hydrant, sprinkler system, and fire alarms will be installed as per drawings. Fire escape staircase will be constructed as per drawings. Refuge area will be made as per norms.
Social Infrastructure And Other Public Amenities Including Public Health ServicesShopping Complex , Food court are available in the project.
Emergency Evacuation ServicesFire staircase refuge area will provided as per requirement for evacuation in case of any emergency.
Other Miscellaneous WorkProper security system including security guards, CCTV Cameras and controlled access will be made available
Financials
Registration Fee (₹)93000
Project Duration (months)50