GURU KRIPA SKY
by Maa Dholagarh Constructions (Proprietor- Shyam Singhal)
Mathura, Uttar Pradesh · UPRERAPRJ251029/01/2025
Total units
370
Overview
Registration Date2025-01-29
RERA NumberUPRERAPRJ251029/01/2025
Promoter IDUPRERAPRM301026
Proposed Start2024-10-01
Proposed Completion2029-09-12
Location
DistrictMathura
TehsilMathura
VillageMauja Sunrak Banger
AddressOn Khasra No. 1097(m), 1099(m), 1094(m), 1095, 1096, 1098(m), 1093
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units370
Unit Types4
Blocks6
Floors10
Khasra records (1)
- 1097(m), 1099(m), 1094(m), 1095, 1096, 1098(m), 1093· Khasra· 1753750 m²
Inventory
Apartments (92 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| TOWER A | BSMNT | OTHER | 0 | 0 | 0 | — |
| TOWER A | GF | OTHER | 0 | 0 | 0 | — |
| TOWER A | 1 | 2 BHK | 9 | 68.58 | 3 | — |
| TOWER A | 2 | 2 BHK | 9 | 68.58 | 3 | — |
| TOWER A | 3 | 2 BHK | 9 | 68.58 | 3 | — |
| TOWER A | 4 | 2 BHK | 9 | 68.58 | 3 | — |
| TOWER A | 5 | 2 BHK | 9 | 68.58 | 3 | — |
| TOWER A | 6 | 2 BHK | 9 | 68.58 | 3 | — |
| TOWER A | 7 | 2 BHK | 9 | 68.58 | 3 | — |
| TOWER A | 8 | 2 BHK | 9 | 68.58 | 3 | — |
| TOWER B | BSMNT | OTHER | 0 | 0 | 0 | — |
| TOWER B | GF | OTHER | 0 | 0 | 0 | — |
| TOWER B | 1 | 2 BHK | 11 | 68.58 | 3 | — |
| TOWER B | 2 | 2 BHK | 11 | 68.58 | 3 | — |
| TOWER B | 3 | 2 BHK | 11 | 68.58 | 3 | — |
| TOWER B | 4 | 2 BHK | 11 | 68.58 | 3 | — |
| TOWER B | 5 | 2 BHK | 11 | 68.58 | 3 | — |
| TOWER B | 6 | 2 BHK | 11 | 68.58 | 3 | — |
| TOWER B | 7 | 2 BHK | 11 | 68.58 | 3 | — |
| TOWER C | BSMNT | OTHER | 0 | 0 | 0 | — |
| TOWER C | GF | OTHER | 0 | 0 | 0 | — |
| TOWER C | 1 | 1 BHK | 1 | 37.45 | 2 | — |
| TOWER C | 1 | 2 BHK | 3 | 68.58 | 3 | — |
| TOWER C | 1 | 3 BHK | 2 | 88.45 | 3 | — |
| TOWER C | 2 | 1 BHK | 1 | 37.45 | 2 | — |
| TOWER C | 2 | 2 BHK | 3 | 68.58 | 3 | — |
| TOWER C | 2 | 3 BHK | 2 | 88.45 | 3 | — |
| TOWER C | 3 | 1 BHK | 1 | 37.45 | 2 | — |
| TOWER C | 3 | 2 BHK | 3 | 68.58 | 3 | — |
| TOWER C | 3 | 3 BHK | 2 | 88.45 | 3 | — |
| TOWER C | 4 | 1 BHK | 1 | 37.45 | 2 | — |
| TOWER C | 4 | 2 BHK | 3 | 68.58 | 3 | — |
| TOWER C | 4 | 3 BHK | 2 | 88.45 | 3 | — |
| TOWER C | 5 | 1 BHK | 1 | 37.45 | 2 | — |
| TOWER C | 5 | 2 BHK | 3 | 68.58 | 3 | — |
| TOWER C | 5 | 3 BHK | 2 | 88.45 | 3 | — |
| TOWER C | 6 | 1 BHK | 1 | 37.45 | 2 | — |
| TOWER C | 6 | 2 BHK | 3 | 68.58 | 3 | — |
| TOWER C | 6 | 3 BHK | 2 | 88.45 | 3 | — |
| TOWER C | 7 | 1 BHK | 1 | 37.45 | 2 | — |
| TOWER C | 7 | 2 BHK | 3 | 68.58 | 3 | — |
| TOWER C | 7 | 3 BHK | 2 | 88.45 | 3 | — |
| TOWER D | BSMNT | OTHER | 0 | 0 | 0 | — |
| TOWER D | GF | OTHER | 0 | 0 | 0 | — |
| TOWER D | 1 | 2 BHK | 7 | 68.58 | 3 | — |
| TOWER D | 2 | 2 BHK | 7 | 68.58 | 3 | — |
| TOWER D | 3 | 2 BHK | 7 | 68.58 | 3 | — |
| TOWER D | 4 | 2 BHK | 7 | 68.58 | 3 | — |
| TOWER D | 5 | 2 BHK | 7 | 68.58 | 3 | — |
| TOWER D | 6 | 2 BHK | 7 | 68.58 | 3 | — |
| TOWER D | 7 | 2 BHK | 7 | 68.58 | 3 | — |
| TOWER E | BSMNT | OTHER | 0 | 0 | 0 | — |
| TOWER E | GF | OTHER | 0 | 0 | 0 | — |
| TOWER E | 1 | 2 BHK | 8 | 68.58 | 3 | — |
| TOWER E | 2 | 2 BHK | 8 | 68.58 | 3 | — |
| TOWER E | 3 | 2 BHK | 8 | 68.58 | 3 | — |
| TOWER E | 4 | 2 BHK | 8 | 68.58 | 3 | — |
| TOWER E | 5 | 2 BHK | 8 | 68.58 | 3 | — |
| TOWER E | 6 | 2 BHK | 8 | 68.58 | 3 | — |
| TOWER E | 7 | 2 BHK | 8 | 68.58 | 3 | — |
| TOWER F | BSMNT | OTHER | 0 | 0 | 0 | — |
| TOWER F | GF | OTHER | 0 | 0 | 0 | — |
| TOWER F | 1 | 2 BHK | 6 | 68.58 | 3 | — |
| TOWER F | 1 | 3 BHK | 1 | 88.45 | 3 | — |
| TOWER F | 2 | 2 BHK | 6 | 68.58 | 3 | — |
| TOWER F | 2 | 3 BHK | 1 | 88.45 | 3 | — |
| TOWER F | 3 | 2 BHK | 6 | 68.58 | 3 | — |
| TOWER F | 3 | 3 BHK | 1 | 88.45 | 3 | — |
| TOWER F | 4 | 2 BHK | 6 | 68.58 | 3 | — |
| TOWER F | 4 | 3 BHK | 1 | 88.45 | 3 | — |
| TOWER F | 5 | 2 BHK | 6 | 68.58 | 3 | — |
| TOWER F | 5 | 3 BHK | 1 | 88.45 | 3 | — |
| TOWER F | 6 | 2 BHK | 6 | 68.58 | 3 | — |
| TOWER F | 6 | 3 BHK | 1 | 88.45 | 3 | — |
| TOWER F | 7 | 2 BHK | 6 | 68.58 | 3 | — |
| TOWER F | 7 | 3 BHK | 1 | 88.45 | 3 | — |
| TOWER B | 8 | 2 BHK | 3 | 68.58 | 3 | 0 |
| TOWER B | 1 | 3 BHK | 2 | 88.45 | 3 | 0 |
| TOWER B | 2 | 3 BHK | 2 | 88.45 | 3 | 0 |
| TOWER B | 3 | 3 BHK | 2 | 88.45 | 3 | 0 |
| TOWER B | 4 | 3 BHK | 2 | 88.45 | 3 | 0 |
| TOWER B | 5 | 3 BHK | 2 | 88.45 | 3 | 0 |
| TOWER B | 6 | 3 BHK | 2 | 88.45 | 3 | 0 |
| TOWER B | 7 | 3 BHK | 2 | 88.45 | 3 | 0 |
| TOWER A | 1 | 3 BHK | 1 | 88.45 | 3 | 0 |
| TOWER A | 2 | 3 BHK | 1 | 88.45 | 3 | 0 |
| TOWER A | 3 | 3 BHK | 1 | 88.45 | 3 | 0 |
| TOWER A | 4 | 3 BHK | 1 | 88.45 | 3 | 0 |
| TOWER A | 5 | 3 BHK | 1 | 88.45 | 3 | 0 |
| TOWER A | 6 | 3 BHK | 1 | 88.45 | 3 | 0 |
| TOWER A | 7 | 3 BHK | 1 | 88.45 | 3 | 0 |
| TOWER A | 8 | 3 BHK | 1 | 88.45 | 3 | 0 |
Permits & Approvals
Permit NoGroup Housing/05139/MVDA/BP/23-24/1230/31052024
Permit Date2024-09-13
Valid Until2029-09-12
Extendable Until2032-09-11
Documents
Filing documents
- Other Plan(If Any)
- Proforma of Completion Certificate(Occupancy)
- Other
- Details of Encumbrances#New(2024-10-17)View
- Commencement Certificate#New(2024-10-18)View
- Proforma of Application Form#New(2024-10-18)View
- Proforma of Allotment Letter#New(2024-10-18)View
- Proforma of Conveyance Deed#New(2024-10-18)View
- Waste Disposal Plan#New(2024-10-18)View
- Water Supply Plan#New(2024-10-18)View
- Electricity Supply Plan#New(2024-10-18)View
- Development Work Plan#New(2024-10-18)View
- Affidavit (Form-B)#New(2024-10-18)View
- CA CERTIFICATE#New(2024-11-07)View
- ARCHITECT CERTIFICATE#New(2024-10-18)View
- ENGINEERS CERTIFICATE#New(2024-10-18)View
- Other#New(2024-12-09)View
- Proforma of Agreement for Sale#New(2024-10-18)View
Land documents
- Registry Document#13673(2024-05-17)View13046126775.pdf
Project Team
Architect AddressH.No. 2, Jamuna Vihar Colony, Near Central Bank, Masani, Mathura
Engineer AddressS/o Vinod Shastri, Mawali, Post Panigaon, Mant, Mathura
Developer & Contact
Developer
Promoter NameMaa Dholagarh Constructions (Proprietor- Shyam Singhal)
Promoter AddressMayur Vihar, 68, Dholi Pyau, Mathura, Mathura, Uttar Pradesh, 281001
Company TypeProprietorship Firm
Mobile9760031311
Emailshysinghal88@gmail.com
Registered AddressMayur Vihar, 68, Dholi Pyau, Mathura, Mathura, Uttar Pradesh, 281001
Contractor AddressH.No. 364, Mathura Darwaza, Vrindavan Bangar, Vrindavan Mathura, 281121
Bank Accounts
Account Typecollection
Account Number924020032168087
Account NameMAA DHOLAGARH CONSTRUCTIONS-GURU KRIPA SKY - COLLECTION ACCOUNT
Bank NameAXIS BANK LIMITED
BranchMATHURA, UTTAR PRADESH
Branch AddressOJAL MALL MATHURA, U.P
Branch DistrictMathura
Branch StateSelect
IFSCUTIB0000359
Branch EmailMATHURA.BRANCHHEAD@AXISBANK.COM
Account Typeseparate
Account Number924020036322425
Account NameMAA DHOLAGARH CONSTRUCTIONS-GURU KRIPA SKY- SEPARATE ACCOUNT
Bank NameAXIS BANK LIMITED
BranchMATHURA, UTTAR PRADESH
Branch AddressOJAL MALL MATHURA-281001
Branch DistrictMathura
Branch StateUttar Pradesh
IFSCUTIB0000359
Account Typetransaction
Account Number924020049723783
Account NameMAA DHOLAGARH CONSTRUCTIONS- RERA TRANSACTION ACCOUNT FOR GURU KRIPA SKY
Bank NameAXIS BANK LIMITED
BranchMATHURA, UTTAR PRADESH
Branch AddressOJAL Mall , MATHURA 282001
Branch DistrictMathura
Branch StateUttar Pradesh
IFSCUTIB0000359
Development & Facilities
Development works
Demarcation Of PlotsThe project land will be clearly demarcted on land with the project boundary wall. The building lines and the setbacks from the periphery to the building line will be maintained as per the byelaws.
Boundary WallA 8 feet high boundary wall will be constructed for the project. The foundation of the boundary wall will be earthquake resistant. The wall will be constructed in brick and mortar with reinforced columns at specified intervals. The wall will be plastered and painted.
Road WorkThe concrete road will be constructed in the project. The 200 mm CC layer will be laid over DLC and GSB. The surface texturing will be done to ensure antiskid paving surface.
FootpathsThe interlocking paver blocks will be laid to the minimum width of 1m. The M-20 paver blocks of the depth 60-80 mm will be laid for the footpath. The footpsth will be on the periphery of the parks and at all suitable locations to encourage walking by the residents.
Water Supply Including Drinking Water FacilitiesThe ground water will be pumped to the underground water take of minimum 10000 kl. Thereon the water will be pumped to the terrace tanks. From treerace tanks the water will be supplied to each unit and common areas of the project. The pipe line will be rust free PVC pipes of sufficient diameter to cater the domestic requuirements of the project.
Sewer SystemThe sewer syster , vertical and horizontal will be installed in the project to cater for the domestic and common area sewer. The soil pipes will be installed along with the syphon and inspection chambers at all floor levels. The sewer line will be led to the chmambers at the ground level. Thereon the sewer will be lead to the STP
DrainThe sub surface dain and the storm water drains will be constructed in the project. The roof top water will be catered for the RWH. The wate for domestic drain will be separately catered and will be connected to ground drainage system leading to the outlet as per local norms and guidelines.
ParksThe parks will be constructed as per the landscape plan. The lush green parks will be developed in the project along with amenities for the kids and elders.
Tree PlantingThe trees suitable to the local soil will be planted in the project along the parks periphery and boundary wall. the tress will also be planted at all suitable locations.
Design For Electric Supply Including Street LightingSeparate transformer will be installed for the project as per the approved load / sanvtioned load by DVVNL. The ISI maerked electric llines (majorly concealed) will lead to all the individual units through distribution boxes. The street and common lighting will ensure that the common areas are always sufficiently lit.
Community BuildingsN.A
Treatment And Disposal System Of Sewage And Sullage WaterAn STP will be installed in the project. The multi chamber STP will be sufficient to cater for the neeeds of the project. The sewage will go through the stage treatements of screening , sedimentation and biological treatement. The watewater will be bought to the safe levels before being disposed.
Solid Waste Management And Disposal SystemThe wate chute along with multiple garbage bins will be installed at all floors and at all suitable location of the project. The domestic wate will be collected as per category and will be disosed at the pre defined location by the local administrative body.
Water Conservation SystemThe rain water harvestin pit will be constructed/ installed in the project to arrest the terrace water and the surfce water . The same will be lead to the collection chambe r and will move through the multi stage filteration system. The collected filtered water will be led though the perforated pipe of 100 dia. to the ground water. The part of this water will be used for the parks etc.
Energy Management System Including Use Of Renewable EnergyAlthough not specified in the project , the usage of green technologies along with the LED lights will be installed in the project.
Fire Protection And Fire Safety SystemThe intalations of the fire extinguishers will be done at all required loctions of the projecct. A separate water tank will be constructed for the purpose of fire fighting. The fire hydrants, sprinklers and alarm system will be put in place. The buiding will have the emergency exit to ensure safe egress of the residents from the building in case of fire.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicable
Emergency Evacuation ServicesThe Stairwell will be developed in a manner to create safe passage in case of emergency in the building. The riser will be constructed considering the old ge and yougs .
Other Miscellaneous WorkAs per the project requirements
Financials
Registration Fee (₹)82500
Project Duration (months)60