Registered
Overview
Registration Date2021-03-31
RERA NumberUPRERAPRJ916732
Promoter IDUPRERAPRM66907
Proposed Start2021-01-01
Proposed Completion2025-10-13
Location
DistrictVaranasi
TehsilPindra **
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Khasra records (1)
- S.M Plot No. 64 and 65, Mauza- sehmallpur, Pargana- Athgawa, Tehsil- Pindra, District- Varanasi, 221006· Plot· 8500 m²
Permits & Approvals
Permit No38/18 Gro. Hou. Viyas
Permit Date2020-10-14
Valid Until2025-10-13
Extendable Until2028-10-13
Documents
Filing documents
- Proforma of Completion Certificate(Occupancy)
- Details of Encumbrances#New(2021-02-16)View
- Commencement Certificate#New(2021-02-16)View
- Other Plan(If Any)#New(2021-03-17)View
- Proforma of Application Form#New(2021-02-16)View
- Proforma of Allotment Letter#New(2021-03-08)View
- Proforma of Conveyance Deed#New(2021-02-16)View
- Waste Disposal Plan#New(2021-02-16)View
- Water Supply Plan#New(2021-02-16)View
- Electricity Supply Plan#New(2021-02-16)View
- Development Work Plan#New(2021-02-16)View
- Affidavit (Form-B)#New(2021-02-16)View
- CA CERTIFICATE#New(2021-02-18)View
- ARCHITECT CERTIFICATE#New(2021-02-16)View
- ENGINEERS CERTIFICATE#New(2021-02-18)View
Land documents
- Sale Deed#3970(2015-07-24)View2189258802Sale Deed - Plot No 64_compressed.pdf
- Sale Deed#3971(2015-07-24)View2189254618Sale Deed - Plot No 65_compressed.pdf
- Registry Document#6046(2020-12-14)View2189258605Developer Agreement_compressed.pdf
- Extract of Khatauni#Reply against query received along with layout plan showing area of towers(1900-01-01)View2189253804Reply along with annexures.pdf
- Extract of Khatauni#1425-1430(1900-01-01)View2189251157UP Bhulekh Khautauni - 03-03-2021.pdf
- Extract of Khatauni#Floor plans with carpet area(1900-01-01)View2189257448Floor Plans with Carpet Area.pdf
Project Team
Architect AddressQuintessence , D-21 , Sector- 27 , Noida-201301
Engineer Address302, Ansal Majestic Tower, Near Soina Pvr Complex , Vikaspuri, 110010, New Delhi
Developer & Contact
Developer
Promoter NameDreamland Holdings Ltd.
Promoter Address8/2, Kiran Shankar Roy Road, 3rd Floor, Room No. 1 and 2, Kolkata - 700001
Company TypeCompany
Mobile9415302443
Emailchairman@dreamlandholdings.in
Registered Address8/2, Kiran Shankar Roy Road, 3rd Floor, Room No. 1 and 2, Kolkata - 700001
Contractor AddressD-59/105, C-5, Vinay Kunj, Chandrika Nagar Colony, Sigra , Varanasi Uttar Pradesh221010
Development & Facilities
Development works
Demarcation Of PlotsThis is two plots connected in heptagon shaped , having a frontage of 30m with 1 entry and 1 exit gate from a 12m front wide road and a 9m internal roads . Site is bounded as follows ;East - Chak Road , West-Main Road (12m) , North - Nali , South -Others plot.
Boundary Wall3m high and 225 mm thick Boundary wall designed . RCC work in column and beam will be used as per design.
Road WorkPaver/ Trimix based road will be created for all internal road works with concrete pavers at certain junction points.
FootpathsAll internal roads will have 1.5m wide footpath on 40-60mm thick concrete pavers or equivalent finishes.
Water Supply Including Drinking Water FacilitiesPumps of 225 LPM at 100mtrs. overhead shall be provided with onw working and another on standby.
Sewer SystemSewage Treatment Plant (SLD) of 85 KLD Capacity with STP treated water usage in horticulture and one standby
DrainThe green area is designed to recharge its rainwater and the hard pavement / road is sloped gently towards the main road where it connects to the main storm water drain along the main road.
ParksOpen green area of 1690.47 sq. metres is provided as per the sanction plan .
Tree PlantingLagerstromeia indica (156) , Eugenia (15) , Sweetiana Mahogany (43), Michalia champaca (23) , Lagerstromia flos reginae (10) ,Canocarpus (11), Ficus Lyrata (11) , Buddha belly Bamboo (45) , Raphis Palm (24) , Pandanus bapyistii (25) , ficus safari (20) , Adenium (3) are being provided.
Design For Electric Supply Including Street LightingStreet /landscape lighting shall be provided
Community BuildingsCommunity area is included in Tower-1 (Ground and First Floor respectively as in the sanction map ), which shall be accessible to all residents.
Treatment And Disposal System Of Sewage And Sullage WaterSewage Treatment Plan (STP) of 85 KLD capacity shall be provided. The treated water shall be used in horticulture , flushing , carwash and excess water shall be discharged into the municipal sewer as per site
Solid Waste Management And Disposal SystemThere are a proper garbage collection area provided for the solid waste management .
Water Conservation SystemIn total 3 Rain Water Harvesting facilities and 2 borewalls shall be provided and sewage water shall be recycled to the extent feasible
Energy Management System Including Use Of Renewable EnergySolar panels shall be provided on terrace for renewal energy. Energy purchased from the grid/ power supply company and net metering will be done as per electricity supply authority guideline.
Fire Protection And Fire Safety SystemFire Tender path shall be provided as per NBC. Fire Fighting system along with pumps and water storage tanks shall be provided as per NBC and NOC from Fire Department.
Social Infrastructure And Other Public Amenities Including Public Health ServicesSewerage, Storm water and water supply shall be provided. We have proposed common Pump Room with Primary Filteration , Transfer pumps to fill the domestic overhead tank . Water for domestic use and flushing go down through gravity from domestic as well as flushing tanks . All sewage shall be go the STP for recycling the water. Strom water for roofs, roads and other area shall be connected to the Storm water drain channel and go to the Rainwater harvesting Pit for recharge the groundwater and overflow shall be connected with Municiple Drain
Emergency Evacuation ServicesBalcony will also be used for evacuation . Assembly points areas will be demarcated for earthquake and other possible disasters
Other Miscellaneous Work6m high, 12m of front with one entry , one exit gate of 5.5 m each and one 1.2 m gate for two wheeler entry . The gate is attached with a guard room
Financials
Registration Fee (₹)47000
Project Duration (months)67