Imperial Estates by Sapphire
by Sapphire Infraventures Pvt. Ltd.
Lucknow, Uttar Pradesh · UPRERAPRJ263165/10/2024
Total units
94
Overview
Registration Date2024-10-11
RERA NumberUPRERAPRJ263165/10/2024
Promoter IDUPRERAPRM64792
Proposed Start2024-09-01
Proposed Completion2029-03-31
Location
DistrictLucknow
TehsilMohanlalganj
VillageKasimpur Biruha and Kabirpur
AddressKhasra No.- 783,804,805,806,807,824,834,836,837,838,843, Village - Kasimpur Biruha and Khasra No - 267, Village- Kabirpur
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units94
Unit Types3
Blocks2
Floors13
Khasra records (1)
- 804 and 806· Khasra· 6028 m²
Inventory
Apartments (37 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| Tower B | GF | OTHER | 0 | 0 | 0 | — |
| Tower C | GF | OTHER | 0 | 0 | 0 | — |
| Tower C | 1 | 4 BHK | 2 | 173.12 | 3 | — |
| Tower C | 2 | 4 BHK | 2 | 173.12 | 3 | — |
| Tower C | 3 | 4 BHK | 2 | 173.12 | 3 | — |
| Tower C | 4 | 4 BHK | 2 | 173.12 | 3 | — |
| Tower C | 5 | 4 BHK | 2 | 173.12 | 3 | — |
| Tower C | 6 | 4 BHK | 2 | 173.12 | 3 | — |
| Tower C | 7 | 4 BHK | 2 | 173.12 | 3 | — |
| Tower C | 8 | 4 BHK | 2 | 173.12 | 3 | — |
| Tower C | 9 | 4 BHK | 2 | 173.12 | 3 | — |
| Tower C | 10 | 4 BHK | 2 | 173.12 | 3 | — |
| Tower C | 11 | 4 BHK | 2 | 173.12 | 3 | — |
| Tower C | 12 | 4 BHK | 2 | 173.12 | 3 | — |
| Tower B | 1 | 3 BHK | 4 | 109.22 | 4 | — |
| Tower B | 2 | 3 BHK | 2 | 96.39 | 4 | — |
| Tower B | 2 | 3 BHK | 4 | 109.22 | 4 | — |
| Tower B | 3 | 3 BHK | 2 | 96.39 | 4 | — |
| Tower B | 3 | 3 BHK | 4 | 109.22 | 4 | — |
| Tower B | 4 | 3 BHK | 2 | 96.39 | 4 | — |
| Tower B | 4 | 3 BHK | 4 | 109.22 | 4 | — |
| Tower B | 5 | 3 BHK | 2 | 96.39 | 4 | — |
| Tower B | 5 | 3 BHK | 4 | 109.22 | 4 | — |
| Tower B | 6 | 3 BHK | 2 | 96.39 | 4 | — |
| Tower B | 6 | 3 BHK | 4 | 109.22 | 4 | — |
| Tower B | 7 | 3 BHK | 2 | 96.39 | 4 | — |
| Tower B | 7 | 3 BHK | 4 | 109.22 | 4 | — |
| Tower B | 8 | 3 BHK | 2 | 96.39 | 4 | — |
| Tower B | 8 | 3 BHK | 4 | 109.22 | 4 | — |
| Tower B | 9 | 3 BHK | 2 | 96.39 | 4 | — |
| Tower B | 9 | 3 BHK | 4 | 109.22 | 4 | — |
| Tower B | 10 | 3 BHK | 2 | 96.39 | 4 | — |
| Tower B | 10 | 3 BHK | 4 | 109.22 | 4 | — |
| Tower B | 11 | 3 BHK | 2 | 96.39 | 4 | — |
| Tower B | 11 | 3 BHK | 4 | 109.22 | 4 | — |
| Tower B | 12 | 3 BHK | 2 | 96.39 | 4 | — |
| Tower B | 12 | 3 BHK | 4 | 109.22 | 4 | — |
Permits & Approvals
Permit NoGroup Housing/11576/LDA/BP/22-23/3471/26032024
Permit Date2024-06-12
Valid Until2029-06-11
Extendable Until2032-06-11
Documents
Filing documents
- Details of Encumbrances
- Other Plan(If Any)
- Proforma of Allotment Letter
- Proforma of Completion Certificate(Occupancy)
- CA CERTIFICATE
- ARCHITECT CERTIFICATE
- ENGINEERS CERTIFICATE
- Details of Encumbrances#New(2024-09-22)View
- Commencement Certificate#New(2024-09-07)View
- Proforma of Application Form#New(2024-09-07)View
- Proforma of Allotment Letter#New(2024-09-07)View
- Proforma of Conveyance Deed#New(2024-09-07)View
- Waste Disposal Plan#New(2024-10-03)View
- Water Supply Plan#New(2024-10-03)View
- Electricity Supply Plan#New(2024-10-03)View
- Development Work Plan#New(2024-09-07)View
- Affidavit (Form-B)#New(2024-09-22)View
- CA CERTIFICATE#New(2024-09-24)View
- ARCHITECT CERTIFICATE#New(2024-09-22)View
- ENGINEERS CERTIFICATE#New(2024-09-22)View
- Other#New(2024-09-07)View
- Proforma of Agreement for Sale#New(2024-09-07)View
Project Team
Architect AddressC-67, Defence Colony, New Delhi-110024
Engineer Address20, Central Lane, Babar Road, New Delhi- 110001
Developer & Contact
Developer
Promoter NameSapphire Infraventures Pvt. Ltd.
Promoter AddressGF-1, Sapphire Homes, 2 Fawn Brake Avenue, Sarojini Naidu Marg, Lucknow-226001.
Company TypeCompany
Mobile8009002222
Emailsapphiredeveloperslko@gmail.com
Registered AddressGF-1, Sapphire Homes, 2 Fawn Brake Avenue, Sarojini Naidu Marg, Lucknow-226001.
Contractor AddressSecond Floor- 20, Cross River Mall, Plot No 9-B, 9-C, Shahdara, Delhi
Bank Accounts
Account Typecollection
Account Number43319197189
Account NameSAPPHIRE INFRAVENTURES PRIVATE LIMITED - COLLECTION ACCOUNT- IMPERIAL ESTATES BY SAPPHIRE
Bank NameState Bank of India
BranchS.M.E Hazratganj Branch
Branch AddressHazratganj Branch, Lucknow
Branch DistrictLucknow
Branch StateSelect
IFSCSBIN0063629
Branch EmailSbi.16882@sbi.co.in
Account Typeseparate
Account Number43319246071
Account NameSAPPHIRE INFRAVENTURES PRIVATE LIMITED - SEPERATE ACCOUNT- IMPERIAL ESTATES BY SAPPHIRE
Bank NameState Bank of India
BranchS.M.E Hazratganj Branch
Branch AddressHazratganj Branch, Lucknow
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCSBIN0063629
Account Typetransaction
Account Number43319324958
Account NameSAPPHIRE INFRAVENTURES PRIVATE LIMITED - TRANSACTION ACCOUNT- IMPERIAL ESTATES BY SAPPHIRE
Bank NameState Bank of India
BranchS.M.E Hazratganj Branch
Branch AddressHazratganj Branch, Lucknow
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCSBIN0063629
Development & Facilities
Development works
Demarcation Of PlotsAs per sanction plan this is Irregular shaped plot. Having total 1 no. of entry gate and exit gate, from the 12m wide road, Site is surrounded by other plots on one side and another side proposed 60 mtr wide master plan road (master plan 2031)
Boundary Wall1.8 - 2.1m high and 200 mm thick brick work and rcc work in column and beam. MS Board enterance and exit gates are developed with boundary.
Road Work12m wide road on entrance and 6m wide road inside the project with Trimix / asphalt/interlocking Brick/RCC road will be used as per design suggested by the Architect for internal road.
FootpathsNot Applicable
Water Supply Including Drinking Water FacilitiesAll apartments shall be provided with potable water for household activities and STP treated water for flushing. Clear water may also be used, and user can have their individual RO system as per their requirements.
Sewer SystemCentralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for treatment. after treatment, water shall be recycled, and it will use in gardening. overflow from the STP shall be connected with the Municiple sewerage system when come into force.
DrainStorm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line when come into force.
ParksWe will provide green area with the different activities and the green area will have gaming facilities for kids.
Tree PlantingWe will provide many type of trees all along the boundary wall & green area
Design For Electric Supply Including Street LightingWe will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, Fountain, STP, Pump room etc.
Community BuildingsNot Applicable
Treatment And Disposal System Of Sewage And Sullage WaterModular Sewerage system shall be Provided. All Sewerage water shall be going to the STP and overflow from the STP shall be connect with the Municipal sewerage system.,when come into force.
Solid Waste Management And Disposal SystemThere are a proper garbage collection area provided for the solid waste management.
Water Conservation SystemWe will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.
Energy Management System Including Use Of Renewable EnergyWe will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.
Fire Protection And Fire Safety SystemWe will provide Fire Fighting facility in common areas while Individual owner can install their own system as per their and local authoritys requirement.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicable
Emergency Evacuation ServicesWe will have staircases which will be provided with emergency exit doors and emergency exit gates
Other Miscellaneous WorkNot Applicable
Financials
Registration Fee (₹)35500
Project Duration (months)55