Imperial Heights (Phase 1)

by RAMPRASTHA URBAN DEVELOPMENT PVT. LTD.

Gautam Buddha Nagar, Uttar Pradesh · UPRERAPRJ504323

Registered

Total units

600

Overview

Registration Date2019-08-31
RERA NumberUPRERAPRJ504323
Promoter IDUPRERAPRM8884
Proposed Start2019-08-01
Proposed Completion2024-08-01

Location

DistrictGautam Buddha Nagar
TehsilDadri
AddressGata ARAZI No.: 69m, 70m, 70mi, 71m, 71mi, 72m, 72mi, 73m, 73mi, 76m, 76mi, 77/2, 79mi at VILL-CHAJARSI Tehsil: Dadari District: Gautam Buddh Nagar U.P.
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Total Units600
Unit Types2
Blocks4
Floors30

Khasra records (14)

Show all 14 khasra rows
  • 73mi/00316· Khasra· 2460
  • 73mi/00169· Khasra· 1405
  • 73m/00052· Khasra· 2780
  • 72mi/00316· Khasra· 2480
  • 72m/00005· Khasra· 1390
  • 71mi/00316· Khasra· 2400
  • 71m/00169· Khasra· 3370
  • 76m/00316· Khasra· 1260
  • 76mi/00182· Khasra· 1520
  • 79mi/00181· Khasra· 1340
  • 77/2/00264· Khasra· 1140
  • 70m/00316· Khasra· 820
  • 70mi/00189· Khasra· 870
  • 69m/00176· Khasra· 5462

Inventory

Apartments (180 rows)
BlockFloorTypeCountCarpet (m²)BalconyGarage
Tower G13 BHK679.9650
Tower G23 BHK679.9650
Tower G33 BHK679.9650
Tower G43 BHK679.9650
Tower G63 BHK679.9650
Tower G53 BHK679.9650
Tower G73 BHK679.9650
Tower G83 BHK679.9650
Tower G93 BHK679.9650
Tower G103 BHK679.9650
Tower G113 BHK679.9650
Tower G123 BHK679.9650
Tower G133 BHK679.9650
Tower G143 BHK679.9650
Tower G153 BHK679.9650
Tower G163 BHK679.9650
Tower G173 BHK679.9650
Tower G183 BHK679.9650
Tower G193 BHK679.9650
Tower G203 BHK679.9650
Tower G213 BHK679.9650
Tower G223 BHK679.9650
Tower G233 BHK679.9650
Tower G243 BHK679.9650
Tower G253 BHK679.9650
Tower G263 BHK679.9650
Tower G273 BHK679.9650
Tower G283 BHK679.9650
Tower G293 BHK679.9650
Tower G303 BHK679.9650
Tower F13 BHK679.9650
Tower F23 BHK679.9650
Tower F33 BHK679.9650
Tower F43 BHK679.9650
Tower F53 BHK679.9650
Tower F63 BHK679.9650
Tower F73 BHK679.8650
Tower F83 BHK679.9650
Tower F93 BHK679.9650
Tower F103 BHK679.9650
Tower F113 BHK679.9650
Tower F123 BHK679.9650
Tower F133 BHK679.9650
Tower F143 BHK679.9650
Tower F153 BHK679.9650
Tower F163 BHK679.9650
Tower F173 BHK679.9650
Tower F183 BHK679.9650
Tower F193 BHK679.9650
Tower F203 BHK679.9650
Tower F213 BHK679.9650
Tower F223 BHK679.9650
Tower F233 BHK679.9650
Tower F243 BHK679.9650
Tower F253 BHK679.9650
Tower F263 BHK679.9650
Tower F273 BHK679.9650
Tower F283 BHK679.9650
Tower F293 BHK679.9650
Tower F303 BHK679.9650
TOWER E13 BHK293.850
TOWER E23 BHK293.850
TOWER E33 BHK293.850
TOWER E43 BHK293.850
TOWER E53 BHK293.850
TOWER E63 BHK293.850
TOWER E73 BHK293.850
TOWER E83 BHK293.850
TOWER E93 BHK293.850
TOWER E103 BHK293.850
TOWER E113 BHK293.850
TOWER E123 BHK293.850
TOWER E133 BHK293.850
TOWER E143 BHK293.850
TOWER E153 BHK293.850
TOWER E163 BHK293.850
TOWER E13 BHK294.2450
TOWER E23 BHK294.2450
TOWER E33 BHK294.2450
TOWER E43 BHK294.2450
TOWER E53 BHK294.2450
TOWER E63 BHK294.2450
TOWER E73 BHK294.2450
TOWER E83 BHK294.2450
TOWER E93 BHK294.2450
TOWER E103 BHK294.2450
TOWER E113 BHK294.2450
TOWER E123 BHK294.2450
TOWER E133 BHK294.2450
TOWER E143 BHK294.2450
TOWER E153 BHK294.2450
TOWER E163 BHK294.2450
TOWER D14 BHK2130.8160
TOWER D24 BHK2130.8160
TOWER D13 BHK293.850
TOWER D23 BHK293.850
TOWER E173 BHK293.850
TOWER E183 BHK293.850
TOWER E193 BHK293.850
TOWER E203 BHK293.850
TOWER E213 BHK293.850
TOWER E223 BHK293.850
TOWER E233 BHK293.850
TOWER E243 BHK293.850
TOWER E253 BHK293.850
TOWER E263 BHK293.850
TOWER E273 BHK293.850
TOWER E283 BHK293.850
TOWER E293 BHK293.850
TOWER E303 BHK293.850
TOWER E173 BHK294.2450
TOWER E183 BHK294.2450
TOWER E193 BHK294.2450
TOWER E203 BHK294.2450
TOWER E213 BHK294.2450
TOWER E223 BHK294.2450
TOWER E233 BHK294.2450
TOWER E243 BHK294.2450
TOWER E253 BHK294.2450
TOWER E263 BHK294.2450
TOWER E273 BHK294.2450
TOWER E283 BHK294.2450
TOWER E293 BHK294.2450
TOWER E303 BHK294.2450
TOWER D34 BHK2130.8160
TOWER D44 BHK2130.8160
TOWER D54 BHK2130.8160
TOWER D64 BHK2130.8160
TOWER D74 BHK2130.8160
TOWER D84 BHK2130.8160
TOWER D94 BHK2130.8160
TOWER D104 BHK2130.8160
TOWER D114 BHK2130.8160
TOWER D124 BHK2130.8160
TOWER D134 BHK2130.8160
TOWER D144 BHK2130.8160
TOWER D154 BHK2130.8160
TOWER D164 BHK2130.8160
TOWER D174 BHK2130.8160
TOWER D184 BHK2130.8160
TOWER D194 BHK2130.8160
TOWER D204 BHK2130.8160
TOWER D214 BHK2130.8160
TOWER D224 BHK2130.8160
TOWER D234 BHK2130.8160
TOWER D244 BHK2130.8160
TOWER D254 BHK2130.8160
TOWER D264 BHK2130.8160
TOWER D274 BHK2130.8160
TOWER D284 BHK2130.8160
TOWER D294 BHK2130.8160
TOWER D304 BHK2130.8160
TOWER D33 BHK293.850
TOWER D43 BHK293.850
TOWER D53 BHK293.850
TOWER D63 BHK293.850
TOWER D73 BHK293.850
TOWER D83 BHK293.850
TOWER D93 BHK293.850
TOWER D103 BHK293.850
TOWER D113 BHK293.850
TOWER D123 BHK293.850
TOWER D133 BHK293.850
TOWER D143 BHK293.850
TOWER D153 BHK293.850
TOWER D163 BHK293.850
TOWER D173 BHK293.850
TOWER D183 BHK293.850
TOWER D193 BHK293.850
TOWER D203 BHK293.850
TOWER D213 BHK293.850
TOWER D223 BHK293.850
TOWER D233 BHK293.850
TOWER D243 BHK293.850
TOWER D253 BHK293.850
TOWER D263 BHK293.850
TOWER D273 BHK293.850
TOWER D283 BHK293.850
TOWER D293 BHK293.850
TOWER D303 BHK293.850

Permits & Approvals

Permit NoMAP20190212172638183
Permit Date2019-07-06
Valid Until2024-07-05
Extendable Until2027-07-04

Documents

Filing documents

  • Other Plan(If Any)
  • Proforma of Conveyance Deed
  • Proforma of Completion Certificate(Occupancy)
  • CA CERTIFICATE
  • ARCHITECT CERTIFICATE
  • ENGINEERS CERTIFICATE
  • Details of Encumbrances#New(2019-08-02)
    View
  • Commencement Certificate#New(2019-07-24)
    View
  • Other Plan(If Any)#New(2019-08-02)
    View
  • Proforma of Application Form#New(2019-07-24)
    View
  • Proforma of Allotment Letter#New(2019-07-24)
    View
  • Proforma of Conveyance Deed#New(2019-08-02)
    View
  • Waste Disposal Plan#New(2019-07-24)
    View
  • Water Supply Plan#New(2019-07-24)
    View
  • Electricity Supply Plan#New(2019-07-24)
    View
  • Development Work Plan#New(2019-07-24)
    View
  • Affidavit (Form-B)#New(2019-08-02)
    View
  • ENGINEERS CERTIFICATE#New(2019-08-02)
    View
  • Other#New(2022-12-23)
    View

Land documents

  • Extract of Khatauni#1421-1426(1900-01-01)
    205165464EXTRACT OF KHASHRA KHATAUNI.pdf
    View
  • Registry Document#3780(2019-08-29)
    205162895Consortium Agreement & Gpa with Resolutions Registered.pdf
    View
  • Other
    RamPrashtha_AFfidavitAOA_07032026_sk.pdf
    View

Project Team

Architect AddressD-1, First Floor, Sector-7, Noida, U.P.-201301
Engineer Address202/203, Himliand House, commercial complex, Karampura, New Delhi

Developer & Contact

Developer

Promoter NameRAMPRASTHA URBAN DEVELOPMENT PVT. LTD.
Promoter AddressD-194, 1ST FLOOR, GATE NO.2 (BACK SIDE) OKHLA INDUSTRIAL AREA, PHASE - 1, NEW DELHI - 110020
Company TypeCompany
Mobile9811134242
Emailkunalarora@rudpl.com
Registered AddressD-194, 1ST FLOOR, GATE NO.2 (BACK SIDE) OKHLA INDUSTRIAL AREA, PHASE - 1, NEW DELHI - 110020
Contractor AddressNew Delhi

Bank Accounts

Account Typecollection
Account Number99990002008242
Account NameRUDPL MASTER COLL RERA A/C IH PH-1
Bank NameHDFC BANK LTD
BranchSECTOR 63 NOIDA
Branch AddressH 1A/12, SECTOR 63, NOIDA
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCHDFC0000975
Branch EmailTARU.GUPTA[at]HDFCBANK.COM
Account Typeseparate
Account Number99990002008244
Account NameRUDPL SEPRATE RERA A/C IH PH-1
Bank NameHDFC BANK LTD
BranchSECTOR-63 NOIDA
Branch AddressH 1 A/12, SECTOR 63, NOIDA
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCHDFC0000975
Branch EmailTARU.GUPTA[at]HDFCBANK.COM
Account Typetransaction
Account Number99990002008243
Account NameRUDPL TRANSACTION RERA A/C IH PH-1
Bank NameHDFC BANK LTD
BranchSECTOR 63 NOIDA
Branch AddressH 1A/12, SECTOR 63, NOIDA
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCHDFC0000975
Branch EmailTARU.GUPTA[at]HDFCBANK.COM

Development & Facilities

Development works

Demarcation Of PlotsAs per Layout attached.
Boundary WallRCC COLUMN AND BEAM STR. WITH BRICK WORK & MS RAILING
Road WorkCement Concrete/ with Cement Concrete Pavers
FootpathsCement Concrete/ with Cement Concrete Pavers
Water Supply Including Drinking Water FacilitiesUnderground and overhead water tanks are provided
Sewer SystemWell – Laid interconnected sewer lines will be provided which are further connected to the municipal sewer.
DrainRain water harvesting system will be provided as per design, overflow water will be transferred to municipal drains.
ParksGreen areas planned as per norms.
Tree PlantingTree plantation as per norms.
Design For Electric Supply Including Street LightingElectrical Supply System will be provided according to requirement based on the calculations.
Community BuildingsBuilding will be provided.
Treatment And Disposal System Of Sewage And Sullage WaterSTP will be provided.
Solid Waste Management And Disposal SystemOWC will be provided.
Water Conservation SystemRain Water Harvesting will be provided.
Energy Management System Including Use Of Renewable EnergyProvision of V.F.D. ( Variable Frequency Drive) in pump room for pumping the domestic and flushing water to minimize the energy requirement.
Fire Protection And Fire Safety SystemFire fighting system and protection system will be provided as per NBC and NOC from UP fire service.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesFire tender road and fire escape staircase will be provided.
Other Miscellaneous WorkNA

Financials

Registration Fee (₹)148500
Project Duration (months)90