Imperial Heights (Phase 1)
by RAMPRASTHA URBAN DEVELOPMENT PVT. LTD.
Gautam Buddha Nagar, Uttar Pradesh · UPRERAPRJ504323
Total units
600
Overview
Registration Date2019-08-31
RERA NumberUPRERAPRJ504323
Promoter IDUPRERAPRM8884
Proposed Start2019-08-01
Proposed Completion2024-08-01
Location
DistrictGautam Buddha Nagar
TehsilDadri
AddressGata ARAZI No.: 69m, 70m, 70mi, 71m, 71mi, 72m, 72mi, 73m, 73mi, 76m, 76mi, 77/2, 79mi at VILL-CHAJARSI Tehsil: Dadari District: Gautam Buddh Nagar U.P.
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units600
Unit Types2
Blocks4
Floors30
Khasra records (14)
Show all 14 khasra rows
- 73mi/00316· Khasra· 2460 m²
- 73mi/00169· Khasra· 1405 m²
- 73m/00052· Khasra· 2780 m²
- 72mi/00316· Khasra· 2480 m²
- 72m/00005· Khasra· 1390 m²
- 71mi/00316· Khasra· 2400 m²
- 71m/00169· Khasra· 3370 m²
- 76m/00316· Khasra· 1260 m²
- 76mi/00182· Khasra· 1520 m²
- 79mi/00181· Khasra· 1340 m²
- 77/2/00264· Khasra· 1140 m²
- 70m/00316· Khasra· 820 m²
- 70mi/00189· Khasra· 870 m²
- 69m/00176· Khasra· 5462 m²
Inventory
Apartments (180 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| Tower G | 1 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 2 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 3 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 4 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 6 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 5 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 7 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 8 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 9 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 10 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 11 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 12 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 13 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 14 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 15 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 16 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 17 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 18 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 19 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 20 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 21 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 22 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 23 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 24 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 25 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 26 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 27 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 28 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 29 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower G | 30 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 1 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 2 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 3 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 4 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 5 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 6 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 7 | 3 BHK | 6 | 79.86 | 5 | 0 |
| Tower F | 8 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 9 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 10 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 11 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 12 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 13 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 14 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 15 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 16 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 17 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 18 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 19 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 20 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 21 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 22 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 23 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 24 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 25 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 26 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 27 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 28 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 29 | 3 BHK | 6 | 79.96 | 5 | 0 |
| Tower F | 30 | 3 BHK | 6 | 79.96 | 5 | 0 |
| TOWER E | 1 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 2 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 3 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 4 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 5 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 6 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 7 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 8 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 9 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 10 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 11 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 12 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 13 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 14 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 15 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 16 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 1 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 2 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 3 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 4 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 5 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 6 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 7 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 8 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 9 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 10 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 11 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 12 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 13 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 14 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 15 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 16 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER D | 1 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 2 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 1 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 2 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 17 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 18 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 19 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 20 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 21 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 22 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 23 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 24 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 25 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 26 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 27 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 28 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 29 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 30 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER E | 17 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 18 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 19 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 20 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 21 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 22 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 23 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 24 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 25 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 26 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 27 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 28 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 29 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER E | 30 | 3 BHK | 2 | 94.24 | 5 | 0 |
| TOWER D | 3 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 4 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 5 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 6 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 7 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 8 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 9 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 10 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 11 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 12 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 13 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 14 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 15 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 16 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 17 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 18 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 19 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 20 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 21 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 22 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 23 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 24 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 25 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 26 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 27 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 28 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 29 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 30 | 4 BHK | 2 | 130.81 | 6 | 0 |
| TOWER D | 3 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 4 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 5 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 6 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 7 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 8 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 9 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 10 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 11 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 12 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 13 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 14 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 15 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 16 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 17 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 18 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 19 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 20 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 21 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 22 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 23 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 24 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 25 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 26 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 27 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 28 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 29 | 3 BHK | 2 | 93.8 | 5 | 0 |
| TOWER D | 30 | 3 BHK | 2 | 93.8 | 5 | 0 |
Permits & Approvals
Permit NoMAP20190212172638183
Permit Date2019-07-06
Valid Until2024-07-05
Extendable Until2027-07-04
Documents
Filing documents
- Other Plan(If Any)
- Proforma of Conveyance Deed
- Proforma of Completion Certificate(Occupancy)
- CA CERTIFICATE
- ARCHITECT CERTIFICATE
- ENGINEERS CERTIFICATE
- Details of Encumbrances#New(2019-08-02)View
- Commencement Certificate#New(2019-07-24)View
- Other Plan(If Any)#New(2019-08-02)View
- Proforma of Application Form#New(2019-07-24)View
- Proforma of Allotment Letter#New(2019-07-24)View
- Proforma of Conveyance Deed#New(2019-08-02)View
- Waste Disposal Plan#New(2019-07-24)View
- Water Supply Plan#New(2019-07-24)View
- Electricity Supply Plan#New(2019-07-24)View
- Development Work Plan#New(2019-07-24)View
- Affidavit (Form-B)#New(2019-08-02)View
- ENGINEERS CERTIFICATE#New(2019-08-02)View
- Other#New(2022-12-23)View
Project Team
Architect AddressD-1, First Floor, Sector-7, Noida, U.P.-201301
Engineer Address202/203, Himliand House, commercial complex, Karampura, New Delhi
Developer & Contact
Developer
Promoter NameRAMPRASTHA URBAN DEVELOPMENT PVT. LTD.
Promoter AddressD-194, 1ST FLOOR, GATE NO.2 (BACK SIDE) OKHLA INDUSTRIAL AREA, PHASE - 1, NEW DELHI - 110020
Company TypeCompany
Mobile9811134242
Emailkunalarora@rudpl.com
Registered AddressD-194, 1ST FLOOR, GATE NO.2 (BACK SIDE) OKHLA INDUSTRIAL AREA, PHASE - 1, NEW DELHI - 110020
Contractor AddressNew Delhi
Bank Accounts
Account Typecollection
Account Number99990002008242
Account NameRUDPL MASTER COLL RERA A/C IH PH-1
Bank NameHDFC BANK LTD
BranchSECTOR 63 NOIDA
Branch AddressH 1A/12, SECTOR 63, NOIDA
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCHDFC0000975
Branch EmailTARU.GUPTA[at]HDFCBANK.COM
Account Typeseparate
Account Number99990002008244
Account NameRUDPL SEPRATE RERA A/C IH PH-1
Bank NameHDFC BANK LTD
BranchSECTOR-63 NOIDA
Branch AddressH 1 A/12, SECTOR 63, NOIDA
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCHDFC0000975
Branch EmailTARU.GUPTA[at]HDFCBANK.COM
Account Typetransaction
Account Number99990002008243
Account NameRUDPL TRANSACTION RERA A/C IH PH-1
Bank NameHDFC BANK LTD
BranchSECTOR 63 NOIDA
Branch AddressH 1A/12, SECTOR 63, NOIDA
Branch DistrictGautam Buddha Nagar
Branch StateUttar Pradesh
IFSCHDFC0000975
Branch EmailTARU.GUPTA[at]HDFCBANK.COM
Development & Facilities
Development works
Demarcation Of PlotsAs per Layout attached.
Boundary WallRCC COLUMN AND BEAM STR. WITH BRICK WORK & MS RAILING
Road WorkCement Concrete/ with Cement Concrete Pavers
FootpathsCement Concrete/ with Cement Concrete Pavers
Water Supply Including Drinking Water FacilitiesUnderground and overhead water tanks are provided
Sewer SystemWell – Laid interconnected sewer lines will be provided which are further connected to the municipal sewer.
DrainRain water harvesting system will be provided as per design, overflow water will be transferred to municipal drains.
ParksGreen areas planned as per norms.
Tree PlantingTree plantation as per norms.
Design For Electric Supply Including Street LightingElectrical Supply System will be provided according to requirement based on the calculations.
Community BuildingsBuilding will be provided.
Treatment And Disposal System Of Sewage And Sullage WaterSTP will be provided.
Solid Waste Management And Disposal SystemOWC will be provided.
Water Conservation SystemRain Water Harvesting will be provided.
Energy Management System Including Use Of Renewable EnergyProvision of V.F.D. ( Variable Frequency Drive) in pump room for pumping the domestic and flushing water to minimize the energy requirement.
Fire Protection And Fire Safety SystemFire fighting system and protection system will be provided as per NBC and NOC from UP fire service.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesFire tender road and fire escape staircase will be provided.
Other Miscellaneous WorkNA
Financials
Registration Fee (₹)148500
Project Duration (months)90