KALINDI TOWER KALINDI KUNJ

by BULANDSHAHR DEVELOPMENT AUTHORITY

Bulandshahr, Uttar Pradesh · UPRERAPRJ368832/10/2025

Registered

Total units

70

Overview

Registration Date2025-10-28
RERA NumberUPRERAPRJ368832/10/2025
Promoter IDUPRERAPRM13457
Proposed Start2025-02-12
Proposed Completion2027-08-11

Location

DistrictBulandshahr
TehsilKhurja
VillageKalindi Kunj Scheme Khurja
AddressPlot No-4, Kalindi Kunj Scheme Khurja
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Total Units70
Unit Types3
Blocks1
Floors8

Khasra records (1)

  • 884,885· Khasra· 3249

Inventory

Apartments (29 rows)
BlockFloorTypeCountCarpet (m²)BalconyGarage
1GFOTHER000
113 BHK2104.262
113 BHK499.442
112 BHK279.552
112 BHK284.613
123 BHK2104.262
123 BHK499.442
122 BHK279.552
122 BHK284.613
133 BHK2104.262
133 BHK499.442
132 BHK279.552
132 BHK284.613
143 BHK2104.262
143 BHK499.442
142 BHK279.552
142 BHK284.613
153 BHK2104.262
153 BHK499.442
152 BHK279.552
152 BHK284.613
163 BHK2104.262
163 BHK499.442
162 BHK279.552
162 BHK284.613
173 BHK2104.262
173 BHK499.442
172 BHK279.552
172 BHK284.613

Permits & Approvals

Permit No23/23
Permit Date2025-05-07
Valid Until2029-05-06
Extendable Until2030-05-06

Documents

Filing documents

  • Other
  • Details of Encumbrances#New(2025-06-21)
    View
  • Commencement Certificate#New(2025-07-01)
    View
  • Other Plan(If Any)#New(2025-07-08)
    View
  • Proforma of Application Form#New(2025-07-08)
    View
  • Proforma of Allotment Letter#New(2025-07-08)
    View
  • Proforma of Conveyance Deed#New(2025-07-08)
    View
  • Proforma of Completion Certificate(Occupancy)#New(2025-07-08)
    View
  • Waste Disposal Plan#New(2025-07-08)
    View
  • Water Supply Plan#New(2025-06-21)
    View
  • Electricity Supply Plan#New(2025-07-08)
    View
  • Development Work Plan#New(2025-07-08)
    View
  • Affidavit (Form-B)#New(2025-07-01)
    View
  • CA CERTIFICATE#New(2025-10-24)
    View
  • ARCHITECT CERTIFICATE#New(2025-07-03)
    View
  • ENGINEERS CERTIFICATE#New(2025-08-08)
    View
  • Other#New(2025-07-28)
    View
  • Proforma of Agreement for Sale#New(2025-07-08)
    View

Land documents

  • Extract of Khatauni#1425-1430 (01 JULY ,2017 - 30 jUNE, 2023)(1900-01-01)
    15608384500.pdf
    View

Project Team

Architect AddressH.M COMPLEX, FIRST FLOOR, NEAR AXIS BANK, RAMGHAT ROAD, ALIGARH
Engineer Address1/38 UPPER GROUND FLOOR DLF DISHAD EXTENTION BHAUPURA GHAZIABAD

Developer & Contact

Developer

Promoter NameBULANDSHAHR DEVELOPMENT AUTHORITY
Promoter AddressM.G. ROAD, YAMUNA PURAM, BULANDSHAHR
Company TypeCompetent authority
Mobile9412784126
Emailbdabsr10@gmail.com
Registered AddressM.G. ROAD, YAMUNA PURAM, BULANDSHAHR
Contractor Address150, EAST MODEL TOWN GHAZIABAD

Bank Accounts

Account Typecollection
Account Number581505000007
Account NameVC BKDA COLLECTION ACCOUNT FOR KALINDI TOWER KALINDI KUNJ
Bank NameICICI BANK
BranchYAMUNAPURAM
Branch AddressFORTUNE COURT, CP 11, YAMUNAPURAM COMMERCIAL BULANDSHAHR
Branch DistrictBulandshahr
Branch StateUttar Pradesh
IFSCICIC0005815
Branch EmailRAJAT.GOYAL2@ICICIBANK.COM
Account Typeseparate
Account Number581505000008
Account NameVC BKDA SEPARATE ACCOUNT FOR KALINDI TOWER KALINDI KUNJ
Bank NameICICI BANK
BranchYAMUNAPURAM
Branch AddressFORTUNE COURT, CP11, YAMUNAPURAM COMMERCIAL BULANDSHAHR
Branch DistrictBulandshahr
Branch StateUttar Pradesh
IFSCICIC0005815
Account Typetransaction
Account Number581505000006
Account NameVC BKDA TRANSACTION ACCOUNT FOR KANLINDI TOWER KALINDI KUNJ
Bank NameICICI BANK
BranchYAMUNAPURAM
Branch AddressFORTUNE COURT, CP11, YAMUNAPURAM COMMERCIAL BULANDSHAHR
Branch DistrictBulandshahr
Branch StateUttar Pradesh
IFSCICIC0005815

Development & Facilities

Development works

Demarcation Of PlotsON SITE DEMARCATION OF PLOT BOUNDARIES AND BLOCK CONSTRUCTION BOUNDARIES ARE MARKED AS PER DRAWING PROVIDED BY THE CONSULTANT.
Boundary WallSTRUCTURAL BOUNDARY WALL CONSTRUCTING THE COLUMN AND BEAM ARRANGEMENTS, FOR AESTHETICS USING THE ADDITIONAL LIGHTING THE GRILL ELEMENTS WITH DECORATIVE FLOOR FINISH
Road WorkIN THE SETBACKS USING CEMENT CONCRETE ROAD.
FootpathsNA
Water Supply Including Drinking Water FacilitiesUNDERGROUND WATER SUPPLY TANK USING FOR WATER SUPPLY IN THE BUILDING ALSO THIS WATER SUPPLY LINE USE FOR DRINKING WATER FOR EVERY HOUSE HOLD AN D COMMON DRINKING WATER FACILITY.
Sewer SystemSEWERAGE SYSTEM IS DIRECT CONNECTED WITH COMMON SEWER LINE , EVERY HOUSE HOLD SEWER SYSTEM IS CONNECTED WITH MULTI PIPING SEWER SYSTEM.
DrainDRAIN PIPELINE IS CONNECTED WITH SCHEME DRAIN SYSTEM, EVERY HOUSEHOLD DRAIN HAS MUTI TRACK SYSTEM FOR REDUCE THE CHOKING.
ParksNA
Tree PlantingAS PER GREEN AREA MARKED IN LAYOUT PLANTATION TOBE DONE.
Design For Electric Supply Including Street LightingAS PER ELECTRICAL LAYOUT, ELECTRICAL POINTS IN HOUSING UNITS AND COMMON AREA IS PROVIDED, STREET LIGHTS ARE PLACED ON BOUNDARY WALLS AS PER CONSULTANT DRAWING.
Community BuildingsNOT APPLICABLE
Treatment And Disposal System Of Sewage And Sullage WaterNOT APPLICABLE, DIRECTLY CONNECTED WITH CENTRALIZED SEWER SYSTEM.
Solid Waste Management And Disposal SystemGARBAGE DUCT IS PROVIDED ON EACH FLOOR, WHICH IS COLLECTING ALL THE GARBAGE IN BASEMENT AND TRANSPORTED BY MUNICIPAL GARBAGE CAR.
Water Conservation SystemRAIN WATER HARVESTING SYSTEM IS PROVIDING.
Energy Management System Including Use Of Renewable EnergyNOT APPLICABLE
Fire Protection And Fire Safety SystemFIRE FIGHTING SYSTEM IS INSTALLING AS PER FIRE FIGHTING NORMS, PROVISIONAL NOC ALSO OBTAINED FROM FIRE DEPARTMENT.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNOT APPLICABLE
Emergency Evacuation ServicesFIRE STARE IS PROVIDED AS PER FIRE SAFETY NORMS
Other Miscellaneous WorkLEVELS OF STILT AND SETBACKS ARE MAINTAINED FOR EASY VEHICULAR CIRCULATION.

Financials

Registration Fee (₹)20500
Project Duration (months)30