Registered
Total units
72
Overview
Registration Date2025-06-04
RERA NumberUPRERAPRJ675938/06/2025
Promoter IDUPRERAPRM357638
Proposed Start2025-04-01
Proposed Completion2031-03-04
Location
DistrictAgra
TehsilAgra
VillageMauja Karketha Mustakil
AddressKh. No. 195, 196, 197(p), 198
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units72
Unit Types3
Blocks1
Floors15
Khasra records (3)
- 195(p), 1969(p), Mauja Karketha, Agra· Khasra· 104052 m²
- Kh. No. 197 , Mauja Karketha, Agra· Khasra· 50835 m²
- Kh. No. 198, Mauja Karketa, Agra· Khasra· 5190 m²
Inventory
Apartments (37 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| KAVERI | BSMNT | OTHER | 0 | 0 | 0 | — |
| KAVERI | BSMNT2 | OTHER | 0 | 0 | 0 | — |
| KAVERI | BSMNT3 | OTHER | 0 | 0 | 0 | — |
| KAVERI | GF | OTHER | 0 | 0 | 0 | — |
| KAVERI | 1 | 3 BHK | 3 | 175.97 | 2 | — |
| KAVERI | 1 | 4 BHK | 3 | 233.53 | 3 | — |
| KAVERI | 1 | 4 BHK | 1 | 224.02 | 4 | — |
| KAVERI | 2 | 3 BHK | 3 | 175.97 | 2 | — |
| KAVERI | 2 | 4 BHK | 3 | 233.53 | 3 | — |
| KAVERI | 2 | 4 BHK | 1 | 224.02 | 4 | — |
| KAVERI | 3 | 3 BHK | 3 | 175.97 | 2 | — |
| KAVERI | 3 | 4 BHK | 3 | 233.53 | 3 | — |
| KAVERI | 3 | 4 BHK | 1 | 224.02 | 4 | — |
| KAVERI | 4 | 3 BHK | 3 | 175.97 | 2 | — |
| KAVERI | 4 | 4 BHK | 3 | 233.53 | 3 | — |
| KAVERI | 4 | 4 BHK | 1 | 224.02 | 4 | — |
| KAVERI | 5 | 3 BHK | 3 | 175.97 | 2 | — |
| KAVERI | 5 | 4 BHK | 3 | 233.53 | 3 | — |
| KAVERI | 5 | 4 BHK | 1 | 224.02 | 4 | — |
| KAVERI | 6 | 3 BHK | 3 | 175.97 | 2 | — |
| KAVERI | 6 | 4 BHK | 3 | 233.53 | 3 | — |
| KAVERI | 6 | 4 BHK | 1 | 224.02 | 4 | — |
| KAVERI | 7 | 3 BHK | 3 | 175.97 | 2 | — |
| KAVERI | 7 | 4 BHK | 3 | 233.53 | 3 | — |
| KAVERI | 7 | 4 BHK | 1 | 224.02 | 4 | — |
| KAVERI | 8 | 3 BHK | 3 | 175.95 | 2 | — |
| KAVERI | 8 | 4 BHK | 3 | 233.53 | 3 | — |
| KAVERI | 8 | 4 BHK | 1 | 224.02 | 4 | — |
| KAVERI | 9 | 3 BHK | 3 | 175.97 | 2 | — |
| KAVERI | 9 | 4 BHK | 3 | 233.53 | 3 | — |
| KAVERI | 9 | 4 BHK | 1 | 224.02 | 4 | — |
| KAVERI | 10 | 3 BHK | 2 | 175.97 | 2 | — |
| KAVERI | 10 | 4 BHK | 2 | 233.53 | 3 | — |
| KAVERI | 10 | 4 BHK | 1 | 224.02 | 4 | — |
| KAVERI | 10 | 4 BHK | 1 | 345.1 | 6 | — |
| KAVERI | 11 | 4 BHK | 2 | 344.55 | 4 | — |
| KAVERI | 11 | 4 BHK | 1 | 350.55 | 4 | — |
Permits & Approvals
Permit NoGroup Housing/07146/ADA/BP/23-24/0471/28012025
Permit Date2025-04-09
Valid Until2031-03-04
Extendable Until2033-03-08
Documents
Filing documents
- Details of Encumbrances
- Other Plan(If Any)
- Proforma of Completion Certificate(Occupancy)
- Other
- Details of Encumbrances#New(2025-05-24)View
- Commencement Certificate#New(2025-04-20)View
- Proforma of Application Form#New(2025-04-20)View
- Proforma of Allotment Letter#New(2025-04-20)View
- Proforma of Conveyance Deed#New(2025-04-20)View
- Waste Disposal Plan#New(2025-04-20)View
- Water Supply Plan#New(2025-04-20)View
- Electricity Supply Plan#New(2025-04-20)View
- Development Work Plan#New(2025-04-20)View
- Affidavit (Form-B)#New(2025-04-22)View
- CA CERTIFICATE#New(2025-04-22)View
- ARCHITECT CERTIFICATE#New(2025-04-22)View
- ENGINEERS CERTIFICATE#New(2025-04-22)View
- Other#New(2025-05-20)View
- Proforma of Agreement for Sale#New(2025-04-20)View
Project Team
Architect AddressA-302, ADITYA CELEBRITY HOMES, SEC-76, NOIDA-202301
Engineer Address25, VAIBHAV NAGAR, PHASE 1, DAYAL BAGH AGRA
Developer & Contact
Developer
Promoter NameKAVERI HOUSING LLP
Promoter Address57/2 KAVERI CENTRE SANJAY PLACE ,HARI PARWAT POLICE STATION,Agra-282002,Uttar Pradesh,lndia
Company TypeLimited Liability Partnership (LLP)
Mobile8791340299
Emailkaverihousingllp@gmail.com
Registered Address57/2 KAVERI CENTRE SANJAY PLACE ,HARI PARWAT POLICE STATION,Agra-282002,Uttar Pradesh,lndia
Contractor Address57/2, KAVERI CENTER, SANJAY PLACE, AGRA
Bank Accounts
Account Typecollection
Account Number005072500000043
Account NameKAVERI HOUSING LLP - KAVERI SWARNI- COLLECTION A/C
Bank NameYES BANK
BranchAGRA, UTTAR PRADESH
Branch AddressGROUND AND FIRST FLOOR 116/18, SANJAY PLACE AGRA 282002
Branch DistrictAgra
Branch StateSelect
IFSCYESB0000050
Branch Emaildlteambsd_agra@yesbank.in
Account Typeseparate
Account Number005072500000063
Account NameKAVERI HOUSING LLP- KAVERI SWARNIM- SEPARATE A/C
Bank NameYES BANK
BranchAGRA , UTTAR PRADESH
Branch AddressGRAOUND AND FIRST FLOOR 116/18, SANJAY PLACE AGRA 282002
Branch DistrictAgra
Branch StateUttar Pradesh
IFSCYESB0000050
Account Typetransaction
Account Number005063700004821
Account NameKAVERI HOUSING LLP- KAVERI SWARNIM- TRANSACTION A/C
Bank NameYES BANK
BranchAGRA, UTTAR PRADESH
Branch AddressGROUND AND FIRST FLOOR 116/18 , SANJAY PLACE AGRA 282002
Branch DistrictAgra
Branch StateUttar Pradesh
IFSCYESB0000050
Development & Facilities
Development works
Demarcation Of PlotsThe project land will be demarcated on ground with boundary wall. The setbacks from the boundary to the building line will be maintained as per the by laws and the approvals from the sanctioning authority
Boundary WallAn 6 to 8 feet high boundary wall will be constructed for the project periphery. The foundation of the wall will be 3 to 4 feet deep and will the earth quake resistant. The wall will be constructed in brickwork or concrete. The boundary wall will be painted with all weather paint.
Road WorkThe peripheral road of the project will be constructed in cement concrete. The depth of PQC layer will be as per the design and minimum of 200 mm thick. The concrete will be laid over DLC/ compacted granular layer of minimum 150mm thickness. The subgrade will be compacted to the required density.
FootpathsThe footpaths will be constructed with 60-80 mm thick paver blocks. The interlocking paver blocks will be laid over the sand bed and the compacted subgrade.
Water Supply Including Drinking Water FacilitiesThe ground water will be supplied through an submersible set up to the underground/ terrace tanks. The water will be supplied through 2 inch PVC pipes.
Sewer SystemThe sewer system will be installed leading to the STP. The 100 to 150 mm dia soil pipes with the required bends will be fixed in the bulding. The sewer will be collected in the manholes at the ground level. The 300 mm dia pipes connected to the man hole chambers will lead the sewer to STP
DrainThe surface and subsurface drainage arrangement including the terrace drain will be onstructed in the project. The slpes of rectangular/ trapezoidal drains will be as per the plubming and drainage design.
Parks1 number of park will be developed in the project as per the landscape plan. The facilities for elderly and children will be provided in the park
Tree PlantingTrees that suit the local soil will be planted in the project along the boundary wall and the periphery of the park.
Design For Electric Supply Including Street LightingSeparate transformer will be installed as per UPSEB norms. The electricity connection and the distribution boxes will be installed for each unit and common areas of the project.
Community BuildingsNot Applicable
Treatment And Disposal System Of Sewage And Sullage WaterThe multi stage filtration system will be installed in the project. The size will be as per the sewer load and treatment design by the designer. The selected sewate treatement plant will treat the sewer to the required and permitted levels before disposal
Solid Waste Management And Disposal SystemThe Garbage Chutes/ Dustbins will be placed on each floor.
Water Conservation SystemRain water harevesting pit will be constructed in the project. The perforated 150mm dia will be insrted to the water table. The rain water will be collected in the multistage filtreation chamber. The treated clean water will move to the ground
Energy Management System Including Use Of Renewable EnergyNot Appliable, but the project will adopt the green technologies.
Fire Protection And Fire Safety SystemThe wet riser system along with dedicated water tank for fire fighting will be installed for the project. The fire extingushers will also be placed at all required locations as per fire deprtment norms.
Social Infrastructure And Other Public Amenities Including Public Health ServicesSwimming pool will be constructed in the project
Emergency Evacuation ServicesThe stairs will be designed as per the fire department norms with clear signage installed in the building to assist the egress of residents in case of fire.
Other Miscellaneous WorkAs per the requirements of project.
Financials
Registration Fee (₹)39000
Project Duration (months)72