Kings Crest
by Elite Infra Developers and Interiors Private Limited
Bareilly, Uttar Pradesh · UPRERAPRJ718743/10/2025
Overview
Registration Date2025-10-17
RERA NumberUPRERAPRJ718743/10/2025
Promoter IDUPRERAPRM383164
Proposed Start2025-10-01
Proposed Completion2029-03-31
Location
DistrictBareilly
TehsilBareilly
VillageItaua Beniram
AddressPlot No. 116 (P), Village Itaua Beniram, Teh. & distt. Bareilly UP
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Plots46
Khasra records (1)
- 116P· Khasra· 942375 m²
Inventory
Plots
| Type | Size range | Count |
|---|---|---|
| Plot | UPTO 100 sqm | 21 |
| Plot | 100 to 150 sqm | 20 |
| Plot | 100 to 150 sqm | 2 |
| Plot | UPTO 100 sqm | 3 |
Permits & Approvals
Permit NoPRD/PH/02887/BDA/LD/24-25/0346/11022025
Permit Date2025-07-01
Valid Until2030-06-30
Extendable Until2033-06-29
Documents
Filing documents
- Other Plan(If Any)
- Proforma of Completion Certificate(Occupancy)
- Details of Encumbrances#New(2025-09-22)View
- Commencement Certificate#New(2025-09-22)View
- Proforma of Application Form#New(2025-09-22)View
- Proforma of Allotment Letter#New(2025-09-22)View
- Proforma of Conveyance Deed#New(2025-09-22)View
- Waste Disposal Plan#New(2025-09-22)View
- Water Supply Plan#New(2025-09-22)View
- Electricity Supply Plan#New(2025-09-22)View
- Development Work Plan#New(2025-09-22)View
- Affidavit (Form-B)#New(2025-09-23)View
- CA CERTIFICATE#New(2025-09-22)View
- ARCHITECT CERTIFICATE#New(2025-10-10)View
- ENGINEERS CERTIFICATE#New(2025-10-09)View
- Other#New(2025-09-22)View
- Proforma of Agreement for Sale#New(2025-09-22)View
Project Team
Architect AddressStudio design view, 1A Design complex, Pilibhit Road,bareilly UP 243122
Engineer AddressSurajMukhi Complex, madhinath, Bareilly UP 243001
Developer & Contact
Developer
Promoter NameElite Infra Developers and Interiors Private Limited
Promoter Address255 JANAKPURI, BAREILLY up 243122
Company TypeCompany
Mobile8630189958
Emaileidipl0001@gmail.com
Registered Address255 JANAKPURI, BAREILLY up 243122
Contractor AddressPashupati Vihar Bareilly
Bank Accounts
Account Typecollection
Account Number120036163884
Account NameElite Infra Developers and Interiors Pvt. Ltd. Collection Account For Kings Crest
Bank NameCanara Bank
BranchRajendra Nagar
Branch AddressRajendra Nagar Bareilly
Branch DistrictBareilly
Branch StateSelect
IFSCCNRB0002838
Branch Emailcb2838@canarabank.com
Account Typeseparate
Account Number120035710573
Account NameElite Infra Developers and Interiors Pvt. Ltd. Separate Account For Kings Crest
Bank NameCanara Bank
BranchRajendra Nagar
Branch AddressRajendra Nagar Bareilly
Branch DistrictBareilly
Branch StateUttar Pradesh
IFSCcb2838canarabank.com
Account Typetransaction
Account Number120036163815
Account NameElite infra Developers and Interiors Pvt. Ltd. Rera Transaction account for Kings Crest
Bank NameCanara Bank
BranchRajendra Nagar
Branch AddressRajendra Nagar Bareilly
Branch DistrictBareilly
Branch StateUttar Pradesh
IFSCcb2838canarabank.com
Development & Facilities
Development works
Demarcation Of PlotsNo. of residential plots under 100 sqmt area is 21 , between 100-150 sqmt area is 20, No. of commercial plots is 5.
Boundary Wall0.23 m thick Boundary wall upto 3.00m high with 1;6 Ratio and both side plaster with 1;5 ratio will be constructed.
Road Workstone ballast with compaction soiling coat 40 mm to 63 mm, 6mm to 10mm thick coat of stone grit and sand including compaction and laying concrete slab 10 cm thick with 1;2;4 ratio.
Footpathsfootpaths will be provided in park concrete paver block will be used for pavement. Ballard lights will be provided along the footpath in park.
Water Supply Including Drinking Water Facilitiesunder ground water tank of capacity 30 KLD will be provided. Pump house will be provided for efficient supply of water to overhead water tank situated on terrace top of each residence.
Sewer Systemunder ground sewarage system will be provided to connect each residence towards the STP located in Park. STP of 25 KLD will be provided and an outflow line will be connected to external sewer lineon the front road.
Draincovered drain along the roads will be provided, concrete cover blocks will be used to cover drain.
Parksconcrete blocks will be used for external boundary . park level will be 0.3 m high from internal road level and various amenities will be provided such as children play area and Gazebo.
Tree Plantingpalm tree will be provided along the road. Box hedges will be provided along the footpath in park. Hibiscus tree and trabulars Palms will be provided at various locations in Park. Carpet grass of type-4 will be planted along with Marigold and Petunia flower bed
Design For Electric Supply Including Street Lightingwe will provide underground electric supply for houses. Street lights will be provided along with road 1 street light placed between 2 correponding units. Transformer of 500 KVA will be provided.
Community BuildingsNA
Treatment And Disposal System Of Sewage And Sullage WaterSTP of capacity 25 KLD will be provided inside park. Drain outlet from the STP will be connected to the external sewer line on the front road. treated water will also be used for landscaping
Solid Waste Management And Disposal Systemwe will provide garbage collection area separately in Park.
Water Conservation SystemRain water harvesting pit will be provided in park . underground recharge pits will be provided to conserve collected water.
Energy Management System Including Use Of Renewable EnergyNA
Fire Protection And Fire Safety SystemNA
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesNA
Other Miscellaneous WorkNA
Financials
Registration Fee (₹)47500
Project Duration (months)42