Life and Joy

by Aakansha Infratech

Lucknow, Uttar Pradesh · UPRERAPRJ726971

Registered

Total units

193

Overview

Registration Date2022-07-09
RERA NumberUPRERAPRJ726971
Promoter IDUPRERAPRM171178
Proposed Start2022-04-01
Proposed Completion2028-03-31

Location

DistrictLucknow
TehsilMohanlalganj
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Total Units193
Unit Types2
Blocks4
Floors14

Khasra records (1)

  • GH-01, Sector-1, Pocket-2 in Pintail Park City at Village-Mastemau, Tehsil-Mohanlalganj, Distt. - Lucknow· Plot· 6461069

Inventory

Apartments (67 rows)
BlockFloorTypeCountCarpet (m²)BalconyGarage
Tower - A13 BHK480.0112
Tower - A23 BHK480.0112
Tower - A33 BHK480.0112
Tower - A43 BHK480.0112
Tower - A53 BHK480.0112
Tower - A63 BHK480.0112
Tower - A73 BHK480.0112
Tower - A83 BHK480.0112
Tower - A93 BHK480.0112
Tower - A103 BHK480.0112
Tower - A113 BHK480.0112
Tower - A123 BHK480.0112
Tower - A133 BHK480.0112
Tower - A143 BHK480.0112
Tower - B13 BHK477.7512
Tower - B23 BHK477.7512
Tower - B33 BHK477.7512
Tower - B43 BHK477.7512
Tower - B53 BHK477.7512
Tower - B63 BHK477.7512
Tower - B73 BHK477.7512
Tower - B83 BHK477.7512
Tower - B93 BHK477.7512
Tower - B103 BHK477.7512
Tower - B113 BHK477.7512
Tower - B123 BHK477.7512
Tower - B133 BHK477.7512
Tower - B143 BHK477.7512
Tower - C13 BHK377.759
Tower - C23 BHK377.759
Tower - C33 BHK377.759
Tower - C43 BHK377.759
Tower - C53 BHK377.759
Tower - C63 BHK377.759
Tower - C73 BHK377.759
Tower - C83 BHK377.759
Tower - C93 BHK377.759
Tower - C103 BHK377.759
Tower - C113 BHK377.759
Tower - C123 BHK377.759
Tower - C133 BHK377.759
Tower - C143 BHK377.759
Tower - C12 BHK163.333
Tower - C22 BHK163.333
Tower - C32 BHK163.333
Tower - C42 BHK163.333
Tower - C52 BHK163.333
Tower - C62 BHK163.333
Tower - C72 BHK163.333
Tower - C82 BHK163.333
Tower - C92 BHK163.333
Tower - C102 BHK163.333
Tower - C112 BHK163.333
Tower - D13 BHK276.546
Tower - D23 BHK276.546
Tower - D33 BHK276.546
Tower - D43 BHK276.546
Tower - D53 BHK276.546
Tower - D63 BHK276.546
Tower - D73 BHK276.546
Tower - D83 BHK276.546
Tower - D93 BHK276.546
Tower - D103 BHK276.546
Tower - D113 BHK276.546
Tower - D123 BHK276.546
Tower - D133 BHK276.546
Tower - D143 BHK276.546

Permits & Approvals

Permit NoGroup Housing/03808/LDA/BP/21-22/0176/17122021
Permit Date2022-02-18
Valid Until2027-02-17
Extendable Until2030-02-17

Documents

Filing documents

  • Details of Encumbrances#New(2022-03-31)
    View
  • Commencement Certificate#New(2022-03-30)
    View
  • Other Plan(If Any)#New(2022-03-30)
    View
  • Proforma of Application Form#New(2022-03-31)
    View
  • Proforma of Allotment Letter#New(2022-03-31)
    View
  • Proforma of Conveyance Deed#New(2022-03-31)
    View
  • Waste Disposal Plan#New(2022-03-30)
    View
  • Water Supply Plan#New(2022-03-30)
    View
  • Electricity Supply Plan#New(2022-03-30)
    View
  • Development Work Plan#New(2022-03-30)
    View
  • Affidavit (Form-B)#New(2022-03-30)
    View
  • CA CERTIFICATE#New(2022-03-31)
    View
  • ARCHITECT CERTIFICATE#New(2022-03-31)
    View
  • ENGINEERS CERTIFICATE#New(2022-03-31)
    View
  • Other#New(2022-05-13)
    View

Land documents

  • Sale Deed#10138(2021-04-12)
    4172204921SALE-DEED_compressed.pdf
    View
  • Extract of Khatauni#Query Reply(1900-01-01)
    4172203156Query Reply.pdf
    View
  • Extract of Khatauni#2nd Query Reply(1900-01-01)
    41722094202nd Objection Reply.pdf
    View
  • Extract of Khatauni#Additional reply dated 30.05.2022(1900-01-01)
    4172207931Additional Reply.pdf
    View
  • Extract of Khatauni#Life and Joy - Representation on Registration of Group Housing Project in an Integrated Township(1900-01-01)
    4172202512Life and Joy - Agra Representation for Registration UP RERA.pdf
    View
  • Extract of Khatauni#Affidavit for Common Area and Facilities with Annexures - Life and Joy(1900-01-01)
    4172202803Affidavit for common facilities with annexures - Life and Joy.pdf
    View
  • Extract of Khatauni#Reply to advertisement notice dated 27 June 2022(1900-01-01)
    4172201603Advertisement Notice Reply to RERA 27.06.2022.pdf
    View
  • Extract of Khatauni#Affdavit from pintail for no lien(1900-01-01)
    4172208229Affdavit - Life and Joy.pdf
    View

Project Team

Architect AddressJ-59, Gfl, Sector-84, Faridabad
Engineer AddressH-17, Gautam Marg, Shyam Nagar, Jaipur-19

Developer & Contact

Developer

Promoter NameAakansha Infratech
Promoter Address83, Nehru Nagar, Agra-282002
Company TypePartnership Firm
Mobile9897434797
Emailexec.dir@yttgroup.co.in
Registered Address83, Nehru Nagar, Agra-282002
Contractor AddressSelf

Bank Accounts

Account Typecollection
Account Number50200066818332
Account NameM/S. AAKANSHA INFRA COLL ACC LIFE AND JOY
Bank NameHDFC Bank
BranchGomti Nagar II
Branch AddressB-3/178, VIBHAV KHAND, GOMTI NAGAR, LUCKNOW
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCHDFC0002623
Account Typeseparate
Account Number50200066816451
Account NameM/S. AAKANSHA INFRA RERA ACC LIFE AND JOY
Bank NameHDFC Bank
BranchGomti Nagar II
Branch AddressB-3/178, VIBHAV KHAND, GOMTI NAGAR, LUCKNOW
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCHDFC0002623
Account Typetransaction
Account Number50200066816362
Account NameAAKANSHA INFRA TRANS ACC LIFE AND JOY
Bank NameHDFC Bank
BranchGomti Nagar II
Branch AddressB-13/178 Vibhav Khand, Gomti Nagar Lucknow 226010
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCHDFC0002623

Development & Facilities

Development works

Demarcation Of PlotsWe have one plot of size 6461.069 sq. mtr.having 1 main entrance gate from the 30 m wide front road.
Boundary Wall2 m high and 230 mm thick Brick work and rcc work in column and beam. At the center face of boundary wall there would be a Logo of the project which give a beautiful iconic design to boundary wall.
Road WorkFrom the main entrance gate we have 80 mm thick interlocking brick road through out the project. Whose wideness starts from 10 mtr.
FootpathsWe would not provide any footpath
Water Supply Including Drinking Water FacilitiesWe will provide water supply for the requirement of blocks through underground tank which will get water supply from water supply line given to us by Pintail Infracon.
Sewer SystemModular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.when come into force.
DrainStorm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.
ParksNo parks as our group housing is inside an Integrated Township (Pintail Park City) and the parks are provided inside this integrated township
Tree PlantingWe will provide many type of trees all along the boundary wall & green area
Design For Electric Supply Including Street LightingWe will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, Fountain, STP, Pump room etc.
Community BuildingsNA
Treatment And Disposal System Of Sewage And Sullage WaterModular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.,when come into force.
Solid Waste Management And Disposal SystemThere are a proper garbage collection area provided for the solid waste management.
Water Conservation SystemWe will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.
Energy Management System Including Use Of Renewable EnergyWe will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.
Fire Protection And Fire Safety SystemThis Project has only Residential flats. Hence we will provide Fire Fighting facility in common areas while Individual owner can install their own system as per their and local authorities requirement.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesWe have Proposed common pump room. All Sewerage shall be go to the STP. Road sand other area shall be connect to the storm water drain channel and go to the rain water
Other Miscellaneous WorkNA

Financials

Registration Fee (₹)37500
Project Duration (months)72