Registered
Total units
193
Overview
Registration Date2022-07-09
RERA NumberUPRERAPRJ726971
Promoter IDUPRERAPRM171178
Proposed Start2022-04-01
Proposed Completion2028-03-31
Location
DistrictLucknow
TehsilMohanlalganj
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units193
Unit Types2
Blocks4
Floors14
Khasra records (1)
- GH-01, Sector-1, Pocket-2 in Pintail Park City at Village-Mastemau, Tehsil-Mohanlalganj, Distt. - Lucknow· Plot· 6461069 m²
Inventory
Apartments (67 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| Tower - A | 1 | 3 BHK | 4 | 80.01 | 12 | — |
| Tower - A | 2 | 3 BHK | 4 | 80.01 | 12 | — |
| Tower - A | 3 | 3 BHK | 4 | 80.01 | 12 | — |
| Tower - A | 4 | 3 BHK | 4 | 80.01 | 12 | — |
| Tower - A | 5 | 3 BHK | 4 | 80.01 | 12 | — |
| Tower - A | 6 | 3 BHK | 4 | 80.01 | 12 | — |
| Tower - A | 7 | 3 BHK | 4 | 80.01 | 12 | — |
| Tower - A | 8 | 3 BHK | 4 | 80.01 | 12 | — |
| Tower - A | 9 | 3 BHK | 4 | 80.01 | 12 | — |
| Tower - A | 10 | 3 BHK | 4 | 80.01 | 12 | — |
| Tower - A | 11 | 3 BHK | 4 | 80.01 | 12 | — |
| Tower - A | 12 | 3 BHK | 4 | 80.01 | 12 | — |
| Tower - A | 13 | 3 BHK | 4 | 80.01 | 12 | — |
| Tower - A | 14 | 3 BHK | 4 | 80.01 | 12 | — |
| Tower - B | 1 | 3 BHK | 4 | 77.75 | 12 | — |
| Tower - B | 2 | 3 BHK | 4 | 77.75 | 12 | — |
| Tower - B | 3 | 3 BHK | 4 | 77.75 | 12 | — |
| Tower - B | 4 | 3 BHK | 4 | 77.75 | 12 | — |
| Tower - B | 5 | 3 BHK | 4 | 77.75 | 12 | — |
| Tower - B | 6 | 3 BHK | 4 | 77.75 | 12 | — |
| Tower - B | 7 | 3 BHK | 4 | 77.75 | 12 | — |
| Tower - B | 8 | 3 BHK | 4 | 77.75 | 12 | — |
| Tower - B | 9 | 3 BHK | 4 | 77.75 | 12 | — |
| Tower - B | 10 | 3 BHK | 4 | 77.75 | 12 | — |
| Tower - B | 11 | 3 BHK | 4 | 77.75 | 12 | — |
| Tower - B | 12 | 3 BHK | 4 | 77.75 | 12 | — |
| Tower - B | 13 | 3 BHK | 4 | 77.75 | 12 | — |
| Tower - B | 14 | 3 BHK | 4 | 77.75 | 12 | — |
| Tower - C | 1 | 3 BHK | 3 | 77.75 | 9 | — |
| Tower - C | 2 | 3 BHK | 3 | 77.75 | 9 | — |
| Tower - C | 3 | 3 BHK | 3 | 77.75 | 9 | — |
| Tower - C | 4 | 3 BHK | 3 | 77.75 | 9 | — |
| Tower - C | 5 | 3 BHK | 3 | 77.75 | 9 | — |
| Tower - C | 6 | 3 BHK | 3 | 77.75 | 9 | — |
| Tower - C | 7 | 3 BHK | 3 | 77.75 | 9 | — |
| Tower - C | 8 | 3 BHK | 3 | 77.75 | 9 | — |
| Tower - C | 9 | 3 BHK | 3 | 77.75 | 9 | — |
| Tower - C | 10 | 3 BHK | 3 | 77.75 | 9 | — |
| Tower - C | 11 | 3 BHK | 3 | 77.75 | 9 | — |
| Tower - C | 12 | 3 BHK | 3 | 77.75 | 9 | — |
| Tower - C | 13 | 3 BHK | 3 | 77.75 | 9 | — |
| Tower - C | 14 | 3 BHK | 3 | 77.75 | 9 | — |
| Tower - C | 1 | 2 BHK | 1 | 63.33 | 3 | — |
| Tower - C | 2 | 2 BHK | 1 | 63.33 | 3 | — |
| Tower - C | 3 | 2 BHK | 1 | 63.33 | 3 | — |
| Tower - C | 4 | 2 BHK | 1 | 63.33 | 3 | — |
| Tower - C | 5 | 2 BHK | 1 | 63.33 | 3 | — |
| Tower - C | 6 | 2 BHK | 1 | 63.33 | 3 | — |
| Tower - C | 7 | 2 BHK | 1 | 63.33 | 3 | — |
| Tower - C | 8 | 2 BHK | 1 | 63.33 | 3 | — |
| Tower - C | 9 | 2 BHK | 1 | 63.33 | 3 | — |
| Tower - C | 10 | 2 BHK | 1 | 63.33 | 3 | — |
| Tower - C | 11 | 2 BHK | 1 | 63.33 | 3 | — |
| Tower - D | 1 | 3 BHK | 2 | 76.54 | 6 | — |
| Tower - D | 2 | 3 BHK | 2 | 76.54 | 6 | — |
| Tower - D | 3 | 3 BHK | 2 | 76.54 | 6 | — |
| Tower - D | 4 | 3 BHK | 2 | 76.54 | 6 | — |
| Tower - D | 5 | 3 BHK | 2 | 76.54 | 6 | — |
| Tower - D | 6 | 3 BHK | 2 | 76.54 | 6 | — |
| Tower - D | 7 | 3 BHK | 2 | 76.54 | 6 | — |
| Tower - D | 8 | 3 BHK | 2 | 76.54 | 6 | — |
| Tower - D | 9 | 3 BHK | 2 | 76.54 | 6 | — |
| Tower - D | 10 | 3 BHK | 2 | 76.54 | 6 | — |
| Tower - D | 11 | 3 BHK | 2 | 76.54 | 6 | — |
| Tower - D | 12 | 3 BHK | 2 | 76.54 | 6 | — |
| Tower - D | 13 | 3 BHK | 2 | 76.54 | 6 | — |
| Tower - D | 14 | 3 BHK | 2 | 76.54 | 6 | — |
Permits & Approvals
Permit NoGroup Housing/03808/LDA/BP/21-22/0176/17122021
Permit Date2022-02-18
Valid Until2027-02-17
Extendable Until2030-02-17
Documents
Filing documents
- Details of Encumbrances#New(2022-03-31)View
- Commencement Certificate#New(2022-03-30)View
- Other Plan(If Any)#New(2022-03-30)View
- Proforma of Application Form#New(2022-03-31)View
- Proforma of Allotment Letter#New(2022-03-31)View
- Proforma of Conveyance Deed#New(2022-03-31)View
- Waste Disposal Plan#New(2022-03-30)View
- Water Supply Plan#New(2022-03-30)View
- Electricity Supply Plan#New(2022-03-30)View
- Development Work Plan#New(2022-03-30)View
- Affidavit (Form-B)#New(2022-03-30)View
- CA CERTIFICATE#New(2022-03-31)View
- ARCHITECT CERTIFICATE#New(2022-03-31)View
- ENGINEERS CERTIFICATE#New(2022-03-31)View
- Other#New(2022-05-13)View
Land documents
- Sale Deed#10138(2021-04-12)View4172204921SALE-DEED_compressed.pdf
- Extract of Khatauni#Query Reply(1900-01-01)View4172203156Query Reply.pdf
- Extract of Khatauni#2nd Query Reply(1900-01-01)View41722094202nd Objection Reply.pdf
- Extract of Khatauni#Additional reply dated 30.05.2022(1900-01-01)View4172207931Additional Reply.pdf
- Extract of Khatauni#Life and Joy - Representation on Registration of Group Housing Project in an Integrated Township(1900-01-01)View4172202512Life and Joy - Agra Representation for Registration UP RERA.pdf
- Extract of Khatauni#Affidavit for Common Area and Facilities with Annexures - Life and Joy(1900-01-01)View4172202803Affidavit for common facilities with annexures - Life and Joy.pdf
- Extract of Khatauni#Reply to advertisement notice dated 27 June 2022(1900-01-01)View4172201603Advertisement Notice Reply to RERA 27.06.2022.pdf
- Extract of Khatauni#Affdavit from pintail for no lien(1900-01-01)View4172208229Affdavit - Life and Joy.pdf
Project Team
Architect AddressJ-59, Gfl, Sector-84, Faridabad
Engineer AddressH-17, Gautam Marg, Shyam Nagar, Jaipur-19
Developer & Contact
Developer
Promoter NameAakansha Infratech
Promoter Address83, Nehru Nagar, Agra-282002
Company TypePartnership Firm
Mobile9897434797
Emailexec.dir@yttgroup.co.in
Registered Address83, Nehru Nagar, Agra-282002
Contractor AddressSelf
Bank Accounts
Account Typecollection
Account Number50200066818332
Account NameM/S. AAKANSHA INFRA COLL ACC LIFE AND JOY
Bank NameHDFC Bank
BranchGomti Nagar II
Branch AddressB-3/178, VIBHAV KHAND, GOMTI NAGAR, LUCKNOW
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCHDFC0002623
Account Typeseparate
Account Number50200066816451
Account NameM/S. AAKANSHA INFRA RERA ACC LIFE AND JOY
Bank NameHDFC Bank
BranchGomti Nagar II
Branch AddressB-3/178, VIBHAV KHAND, GOMTI NAGAR, LUCKNOW
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCHDFC0002623
Account Typetransaction
Account Number50200066816362
Account NameAAKANSHA INFRA TRANS ACC LIFE AND JOY
Bank NameHDFC Bank
BranchGomti Nagar II
Branch AddressB-13/178 Vibhav Khand, Gomti Nagar Lucknow 226010
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCHDFC0002623
Development & Facilities
Development works
Demarcation Of PlotsWe have one plot of size 6461.069 sq. mtr.having 1 main entrance gate from the 30 m wide front road.
Boundary Wall2 m high and 230 mm thick Brick work and rcc work in column and beam. At the center face of boundary wall there would be a Logo of the project which give a beautiful iconic design to boundary wall.
Road WorkFrom the main entrance gate we have 80 mm thick interlocking brick road through out the project. Whose wideness starts from 10 mtr.
FootpathsWe would not provide any footpath
Water Supply Including Drinking Water FacilitiesWe will provide water supply for the requirement of blocks through underground tank which will get water supply from water supply line given to us by Pintail Infracon.
Sewer SystemModular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.when come into force.
DrainStorm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.
ParksNo parks as our group housing is inside an Integrated Township (Pintail Park City) and the parks are provided inside this integrated township
Tree PlantingWe will provide many type of trees all along the boundary wall & green area
Design For Electric Supply Including Street LightingWe will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, Fountain, STP, Pump room etc.
Community BuildingsNA
Treatment And Disposal System Of Sewage And Sullage WaterModular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.,when come into force.
Solid Waste Management And Disposal SystemThere are a proper garbage collection area provided for the solid waste management.
Water Conservation SystemWe will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.
Energy Management System Including Use Of Renewable EnergyWe will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.
Fire Protection And Fire Safety SystemThis Project has only Residential flats. Hence we will provide Fire Fighting facility in common areas while Individual owner can install their own system as per their and local authorities requirement.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesWe have Proposed common pump room. All Sewerage shall be go to the STP. Road sand other area shall be connect to the storm water drain channel and go to the rain water
Other Miscellaneous WorkNA
Financials
Registration Fee (₹)37500
Project Duration (months)72