Marbella GH18

by M/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited)

Lucknow, Uttar Pradesh · UPRERAPRJ460592/05/2024

Registered

Total units

528

Overview

Registration Date2024-05-30
RERA NumberUPRERAPRJ460592/05/2024
Promoter IDUPRERAPRM10813
Proposed Start2024-05-10
Proposed Completion2029-02-20

Location

DistrictLucknow
TehsilLucknow
VillageBaghamau
AddressPLOT NO:GH18, Baghamau, Int. Town. Shalimar One World, Lucknow
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Total Units528
Unit Types3
Blocks4
Floors34

Khasra records (1)

  • Part of Khasra no 162, 164, 165, 166, 167, 168, 169, 170, 172, 173· Khasra· 1654013

Inventory

Apartments (274 rows)
BlockFloorTypeCountCarpet (m²)BalconyGarage
Tower AGFOTHER000
Tower A13 BHK2128.155
Tower A13 BHK2102.773
Tower A23 BHK2128.155
Tower A23 BHK2102.773
Tower A33 BHK2128.155
Tower A43 BHK2128.155
Tower A43 BHK2102.773
Tower A53 BHK2128.155
Tower A53 BHK2102.773
Tower A63 BHK2128.155
Tower A63 BHK2102.773
Tower A73 BHK2128.155
Tower A73 BHK2102.773
Tower A83 BHK2128.155
Tower A83 BHK2102.773
Tower A93 BHK2128.155
Tower A93 BHK2102.773
Tower A103 BHK2128.155
Tower A103 BHK2102.773
Tower A113 BHK2128.155
Tower A113 BHK2102.773
Tower A123 BHK2128.155
Tower A123 BHK2102.773
Tower A133 BHK2128.155
Tower A133 BHK2102.773
Tower A143 BHK2128.155
Tower A143 BHK2102.773
Tower A153 BHK2128.155
Tower A153 BHK2102.773
Tower A163 BHK2128.155
Tower A163 BHK2102.773
Tower A173 BHK2127.275
Tower A173 BHK1102.563
Tower A172 BHK193.662
Tower A183 BHK2128.155
Tower A183 BHK2102.773
Tower A193 BHK2128.155
Tower A193 BHK2102.773
Tower A203 BHK2128.155
Tower A203 BHK2102.773
Tower A213 BHK2128.155
Tower A213 BHK2102.773
Tower A223 BHK2128.155
Tower A223 BHK2102.773
Tower A233 BHK2128.155
Tower A233 BHK2102.773
Tower A243 BHK2128.155
Tower A243 BHK2102.773
Tower A253 BHK2128.155
Tower A253 BHK2102.773
Tower A263 BHK2127.275
Tower A263 BHK1102.563
Tower A262 BHK193.662
Tower A273 BHK2128.155
Tower A273 BHK2102.773
Tower A283 BHK2128.155
Tower A283 BHK2102.773
Tower A293 BHK2128.155
Tower A293 BHK2102.773
Tower A303 BHK2128.155
Tower A303 BHK2102.773
Tower A313 BHK2128.155
Tower A313 BHK2102.773
Tower A323 BHK2128.155
Tower A323 BHK2102.773
Tower A333 BHK2128.155
Tower A333 BHK2102.773
TOWER BGFOTHER000
TOWER B13 BHK2128.155
TOWER B13 BHK2102.773
TOWER B23 BHK2128.155
TOWER B23 BHK2102.773
TOWER B33 BHK2128.155
TOWER B33 BHK2102.773
TOWER B43 BHK2128.155
TOWER B43 BHK2102.773
TOWER B53 BHK2128.155
TOWER B53 BHK2102.773
TOWER B63 BHK2128.155
TOWER B63 BHK2102.773
TOWER B73 BHK2128.155
TOWER B73 BHK2102.773
TOWER B83 BHK2128.155
TOWER B83 BHK2102.773
TOWER B93 BHK2128.155
TOWER B93 BHK2102.773
TOWER B103 BHK2128.155
TOWER B103 BHK2102.773
TOWER B113 BHK2128.155
TOWER B113 BHK2102.773
TOWER B123 BHK2128.155
TOWER B123 BHK2102.773
TOWER B133 BHK2128.155
TOWER B133 BHK2102.773
TOWER B143 BHK2128.155
TOWER B143 BHK2102.773
TOWER B153 BHK2128.155
TOWER B153 BHK2102.773
TOWER B163 BHK2128.155
TOWER B163 BHK2102.773
TOWER B173 BHK2127.275
TOWER B173 BHK1102.563
TOWER B172 BHK193.662
TOWER B183 BHK2128.155
TOWER B183 BHK2102.773
TOWER B193 BHK2128.155
TOWER B193 BHK2102.773
TOWER B203 BHK2128.155
TOWER B203 BHK2102.773
TOWER B213 BHK2128.155
TOWER B213 BHK2102.773
TOWER B223 BHK2128.155
TOWER B223 BHK2102.773
TOWER B233 BHK2128.155
TOWER B233 BHK2102.773
TOWER B243 BHK2128.155
TOWER B243 BHK2102.773
TOWER B253 BHK2128.155
TOWER B253 BHK2102.773
TOWER B263 BHK2127.275
TOWER B263 BHK1102.563
TOWER B262 BHK193.662
TOWER B273 BHK2128.155
TOWER B273 BHK2102.773
TOWER B283 BHK2128.155
TOWER B283 BHK2102.773
TOWER B293 BHK2128.155
TOWER B293 BHK2102.773
TOWER B303 BHK2128.155
TOWER B303 BHK2102.773
TOWER B313 BHK2128.155
TOWER B313 BHK2102.773
TOWER B323 BHK2128.155
TOWER B323 BHK2102.773
TOWER B333 BHK2128.155
TOWER B333 BHK2102.773
TOWER CGFOTHER000
TOWER C13 BHK2109.054
TOWER C12 BHK289.852
TOWER C23 BHK2109.054
TOWER C22 BHK289.852
TOWER C33 BHK2109.054
TOWER C32 BHK289.852
TOWER C43 BHK2109.054
TOWER C42 BHK289.852
TOWER C53 BHK2109.054
TOWER C52 BHK289.852
TOWER C63 BHK2109.054
Tower A33 BHK2102.773
TOWER C62 BHK289.852
TOWER C73 BHK2109.054
TOWER C72 BHK289.852
TOWER C83 BHK2109.054
TOWER C82 BHK289.852
TOWER C93 BHK2109.054
TOWER C92 BHK289.852
TOWER C103 BHK2109.054
TOWER C102 BHK289.852
TOWER C113 BHK2109.054
TOWER C112 BHK289.852
TOWER C123 BHK2109.054
TOWER C122 BHK289.852
TOWER C133 BHK2109.054
TOWER C132 BHK289.852
TOWER C143 BHK2109.054
TOWER C142 BHK289.852
TOWER C153 BHK2109.054
TOWER C152 BHK289.852
TOWER C163 BHK2109.054
TOWER C162 BHK289.852
TOWER C173 BHK2109.054
TOWER C172 BHK283.672
TOWER C183 BHK2109.054
TOWER C182 BHK289.852
TOWER C193 BHK2109.054
TOWER C192 BHK289.852
TOWER C203 BHK2109.054
TOWER C202 BHK289.852
TOWER C213 BHK2109.054
TOWER C212 BHK289.852
TOWER C223 BHK2109.054
TOWER C222 BHK289.852
TOWER C233 BHK2109.054
TOWER C232 BHK289.852
TOWER C243 BHK2109.054
TOWER C242 BHK289.852
TOWER C253 BHK2109.054
TOWER C252 BHK289.852
TOWER C263 BHK2109.054
TOWER C262 BHK283.672
TOWER C273 BHK2109.054
TOWER C272 BHK289.852
TOWER C283 BHK2109.054
TOWER C282 BHK289.852
TOWER C293 BHK2109.054
TOWER C292 BHK289.852
TOWER C303 BHK2109.054
TOWER C302 BHK289.852
TOWER C312 BHK289.852
TOWER C323 BHK2109.054
TOWER C322 BHK289.852
TOWER C333 BHK2109.054
TOWER C332 BHK289.852
TOWER DGFOTHER000
TOWER D13 BHK2128.155
TOWER D13 BHK2102.773
TOWER D23 BHK2128.155
TOWER D23 BHK2102.773
TOWER D33 BHK2128.155
TOWER D43 BHK2128.155
TOWER D43 BHK2102.773
TOWER D53 BHK2128.155
TOWER D53 BHK2102.773
TOWER D63 BHK2128.155
TOWER D63 BHK2102.773
TOWER D73 BHK2128.155
TOWER D73 BHK2102.773
TOWER D83 BHK2128.155
TOWER D83 BHK2102.773
TOWER D93 BHK2128.155
TOWER D93 BHK2102.773
TOWER D103 BHK2128.155
TOWER D103 BHK2102.773
TOWER D113 BHK2128.155
TOWER D113 BHK2102.773
TOWER D123 BHK2128.155
TOWER D123 BHK2102.773
TOWER D133 BHK2128.155
TOWER D133 BHK2102.773
TOWER D143 BHK2128.155
TOWER D143 BHK2102.773
TOWER D153 BHK2128.155
TOWER D153 BHK2102.773
TOWER D163 BHK2128.155
TOWER D163 BHK2102.773
TOWER D173 BHK2127.275
TOWER D173 BHK1102.563
TOWER D172 BHK193.662
TOWER D183 BHK2128.155
TOWER D183 BHK2102.773
TOWER D193 BHK2128.155
TOWER D193 BHK2102.773
TOWER D203 BHK2128.155
TOWER D203 BHK2102.773
TOWER D213 BHK2128.155
TOWER D213 BHK2102.773
TOWER D223 BHK2128.155
TOWER D223 BHK2102.773
TOWER D233 BHK2128.155
TOWER D233 BHK2102.773
TOWER D243 BHK2128.155
TOWER D243 BHK2102.773
TOWER D253 BHK2128.155
TOWER D253 BHK2102.773
TOWER D263 BHK2127.275
TOWER D263 BHK1102.563
TOWER D262 BHK193.662
TOWER D273 BHK2128.155
TOWER D273 BHK2102.773
TOWER D283 BHK2128.155
TOWER D283 BHK2102.773
TOWER D293 BHK2128.155
TOWER D293 BHK2102.773
TOWER D303 BHK2128.155
TOWER D303 BHK2102.773
TOWER D313 BHK2128.155
TOWER D313 BHK2102.773
TOWER D323 BHK2128.155
TOWER D323 BHK2102.773
TOWER D333 BHK2128.155
TOWER D333 BHK2102.773
TOWER C313 BHK2109.054
TOWER D33 BHK2102.773

Permits & Approvals

Permit NoGroup Housing/10709/LDA/BP/23-24/3709/11012024
Permit Date2024-03-06
Valid Until2029-03-05
Extendable Until2032-03-05

Documents

Filing documents

  • Details of Encumbrances
  • Other Plan(If Any)
  • Proforma of Completion Certificate(Occupancy)
  • CA CERTIFICATE
  • ARCHITECT CERTIFICATE
  • ENGINEERS CERTIFICATE
  • Details of Encumbrances#New(2024-03-19)
    View
  • Commencement Certificate#New(2024-03-09)
    View
  • Other Plan(If Any)#New(2024-04-10)
    View
  • Proforma of Application Form#New(2024-03-09)
    View
  • Proforma of Allotment Letter#New(2024-03-18)
    View
  • Proforma of Conveyance Deed#New(2024-03-09)
    View
  • Waste Disposal Plan#New(2024-03-09)
    View
  • Water Supply Plan#New(2024-03-09)
    View
  • Electricity Supply Plan#New(2024-03-09)
    View
  • Development Work Plan#New(2024-03-09)
    View
  • Affidavit (Form-B)#New(2024-03-09)
    View
  • CA CERTIFICATE#New(2024-03-18)
    View
  • ARCHITECT CERTIFICATE#New(2024-03-19)
    View
  • ENGINEERS CERTIFICATE#New(2024-03-19)
    View
  • Other#New(2024-04-10)
    View
  • Proforma of Agreement for Sale#New(2024-03-09)
    View

Land documents

  • Registry Document#5396(2015-04-18)
    10105958849.pdf
    View
  • Sale Deed#8785(2011-07-06)
    10105959348.pdf
    View
  • Registry Document#9652(2015-06-24)
    10105956205.pdf
    View
  • Sale Deed#4674(2024-05-06)
    10105954061.pdf
    View

Project Team

Architect AddressVibhuti Khand Gomti Nagar, Lucknow
Engineer AddressB-74, Sector-57, Noida-201301

Developer & Contact

Developer

Promoter NameM/s Shalimar Lakecity Private Limited (Formerly M/s ANS Developers Private Limited)
Promoter Address11th floor, Shalimar Titanium Vibhuti Khand Gomti Nagar Lucknow-226010 UP India
Company TypeCompany
Mobile8795427222
Emailhasnain.husain@shalimar.org
Registered Address11th floor, Shalimar Titanium Vibhuti Khand Gomti Nagar Lucknow-226010 UP India
Contractor AddressS-28, Greater Kailash-II, New Delhi-110048

Bank Accounts

Account Typecollection
Account Number42952561777
Account NameANSDPL - COLL A/c- MARBELLA GH 18
Bank NameState Bank of India
BranchCommercial Branch
Branch Address6A, Way Road, Gokhle Marg Lucknow, Uttar Pradesh 226001
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCSBIN0004166
Branch Emailsbi.04166@sbi.co.in
Account Typeseparate
Account Number42952562657
Account NameANSDPL - SEP A/c- MARBELLA GH 18
Bank NameState Bank of India
BranchCommercial Branch
Branch Address6A, Way Road, Gokhle Marg Lucknow, Uttar Pradesh 226001
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCSBIN0004166
Account Typetransaction
Account Number42952563060
Account NameM/S. ANS DPL TRANS A/C- MARBELLA GH18
Bank NameState Bank of India
BranchCommercial Branch
Branch Address6A, Way Road, Gokhle Marg Lucknow, Uttar Pradesh 226001
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCSBIN0004166

Development & Facilities

Development works

Demarcation Of PlotsAs per approved sanction plan.This is single plot rectangular shaped , having total 1 no. of entry gate and 1no. of exit gate from the 30 mtr wide front from South West Side. Site is surrounded by others plot by North East and green park area from South side.
Boundary Wall1.8 - 2.1m high and 200 mm thick Boundary wall designed or with MS Railing as per approved design. Brick Work of 9inches and rcc work in column and beam may be used as per design. Entrance and exit gates may of of MS Steel steel structure as per approved design are developed with boundary.
Road WorkTrimix / asphalt road will be used as per design suggested by the Architect for internal road.
FootpathsAll internal roads will have narrow footpath with tiles pavers or equivalent finishes as per landscape design.
Water Supply Including Drinking Water FacilitiesAll apartments shall be provided with domestic water for household activities and STP treated water for flushing. Ground water may also be used and user can have their individual RO system as per their requirement. The STP treated water shall also be used for irrigation purposes. For the same water tanks are getting created in underground and on terrace. Separate tanks are provided for fire water.
Sewer SystemCentralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for treatment. after treatment ,water shall be recycled and it will use in gardening, flush tanks and vehicle washing, overflow from the STP shall be connect with the Municipal sewerage system.
DrainStorm water system shall be Provided. Storm water from Roads and other landscape area shall be connected to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.
ParksThere is a significant green area beside building including green parks, play areas for childrens and different recreational activities.
Tree PlantingThe trees of category ornamental ,shady and native species shall be planted in the entire project as per the species recommended in the landscape in order to maintain greenery and natural view.
Design For Electric Supply Including Street LightingWe have designed the system as per local electricity Board and consider centralized Transformer panel,LT Panel,Feeder Pillar and DG back for common service like External lighting with timer control,Pump room etc.
Community BuildingsFully centralised AC Club House/community center is proposed on ground floor. Swimming pool and some temporary kiosks on the central atrium with sitting area of each building. Club comprises multiple facility, gym, indoor playing areas etc.
Treatment And Disposal System Of Sewage And Sullage WaterSeparate centralized sewerage system for entire project and all towers shall be connected to STP . All Sewerage water shall go to the STP for treatment. After treatment recycled water will be used in gardening, flush tanks and vehicle washing, overflow from the STP shall be connect with the Municipal sewerage system.
Solid Waste Management And Disposal SystemProject shall have waste segregation area. The solid waste shall be encouraged for segregation with in all apartments. The dustbins shall be provided for segregated waste in the common areas and other waste shall be handed over to the government vendors for further disposal.
Water Conservation SystemA well designed rain water harvesting system shall be provided for the whole building complex to conserve water by ensuring adequate nos. of recharge pits
Energy Management System Including Use Of Renewable EnergyWe will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor. 25 % of Terrace is covered with Solar Voltaic Panels to provide Renewable source of energy for common areas in building complex. Also timer control panels shall be used for efficient energy management.
Fire Protection And Fire Safety SystemAll Fire norms shall be followed as per NBC code and approval of fire department. fire sprinklers,FHC Shaft, smoke detectors with pumps are provided as per norms.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesFire Staircase is provided in the each building, with fire resistant doors, basements have 1 (one) access and exit in case of emergency. Dedicated assembly areas are also defined in the campus. Also adequate signage shall be provided.
Other Miscellaneous WorkNA

Financials

Registration Fee (₹)88000
Project Duration (months)58