Registered
Total units
80
Overview
Registration Date2026-01-22
RERA NumberUPRERAPRJ506549/01/2026
Promoter IDUPRERAPRM421719
Proposed Start2025-06-01
Proposed Completion2029-11-01
Location
DistrictVaranasi
TehsilVaranasi
VillageDafi
AddressArazi no. 376Ka, Village-Dafi, Tehsil -Sadar, District- Varanasi, Uttar Pradesh, 221011
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units80
Unit Types3
Blocks1
Floors10
Khasra records (1)
- 376K· Khasra· 3220 m²
Inventory
Apartments (80 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| A | 1 | SHOP | 1 | 756.22 | 0 | — |
| A | 2 | SHOP | 1 | 896.49 | 0 | — |
| A | 3 | 3 BHK | 1 | 79.67 | 2 | — |
| A | 3 | 2 BHK | 1 | 56.3 | 1 | — |
| A | 3 | 3 BHK | 1 | 74.09 | 1 | — |
| A | 3 | 2 BHK | 1 | 55.96 | 1 | — |
| A | 3 | 3 BHK | 1 | 81.17 | 2 | — |
| A | 3 | 3 BHK | 1 | 82.52 | 2 | — |
| A | 3 | 2 BHK | 1 | 55.96 | 1 | — |
| A | 3 | 3 BHK | 1 | 74.09 | 1 | — |
| A | 3 | 2 BHK | 1 | 56.3 | 1 | — |
| A | 3 | 3 BHK | 1 | 80.51 | 2 | — |
| A | 4 | 3 BHK | 1 | 79.67 | 2 | — |
| A | 4 | 2 BHK | 1 | 56.3 | 1 | — |
| A | 4 | 3 BHK | 1 | 74.09 | 1 | — |
| A | 4 | 2 BHK | 1 | 55.96 | 1 | — |
| A | 4 | 3 BHK | 1 | 81.17 | 2 | — |
| A | 4 | 3 BHK | 1 | 82.52 | 2 | — |
| A | 4 | 2 BHK | 1 | 55.96 | 1 | — |
| A | 4 | 2 BHK | 1 | 56.3 | 1 | — |
| A | 4 | 3 BHK | 1 | 80.51 | 2 | — |
| A | 5 | 3 BHK | 1 | 79.67 | 2 | — |
| A | 5 | 2 BHK | 1 | 56.3 | 1 | — |
| A | 5 | 2 BHK | 1 | 55.96 | 1 | — |
| A | 5 | 3 BHK | 1 | 81.17 | 2 | — |
| A | 5 | 3 BHK | 1 | 82.52 | 2 | — |
| A | 5 | 3 BHK | 1 | 74.09 | 1 | — |
| A | 5 | 2 BHK | 1 | 56.3 | 1 | — |
| A | 5 | 3 BHK | 1 | 80.51 | 2 | — |
| A | 6 | 3 BHK | 1 | 79.67 | 2 | — |
| A | 6 | 2 BHK | 1 | 56.3 | 1 | — |
| A | 6 | 3 BHK | 1 | 74.09 | 1 | — |
| A | 6 | 2 BHK | 1 | 55.96 | 1 | — |
| A | 6 | 3 BHK | 1 | 81.17 | 2 | — |
| A | 6 | 3 BHK | 1 | 82.52 | 2 | — |
| A | 6 | 2 BHK | 1 | 55.96 | 1 | — |
| A | 6 | 3 BHK | 1 | 74.09 | 1 | — |
| A | 6 | 2 BHK | 1 | 56.3 | 1 | — |
| A | 6 | 3 BHK | 1 | 80.51 | 2 | — |
| A | 7 | 3 BHK | 1 | 79.67 | 2 | — |
| A | 7 | 2 BHK | 1 | 56.3 | 1 | — |
| A | 7 | 3 BHK | 1 | 74.09 | 1 | — |
| A | 7 | 2 BHK | 1 | 55.96 | 1 | — |
| A | 7 | 3 BHK | 1 | 81.17 | 2 | — |
| A | 7 | 3 BHK | 1 | 82.52 | 2 | — |
| A | 7 | 2 BHK | 1 | 55.96 | 1 | — |
| A | 7 | 3 BHK | 1 | 74.09 | 1 | — |
| A | 7 | 2 BHK | 1 | 56.3 | 1 | — |
| A | 7 | 3 BHK | 1 | 80.51 | 2 | — |
| A | 8 | 3 BHK | 1 | 79.67 | 2 | — |
| A | 8 | 2 BHK | 1 | 56.3 | 1 | — |
| A | 8 | 3 BHK | 1 | 74.09 | 1 | — |
| A | 8 | 2 BHK | 1 | 55.96 | 1 | — |
| A | 8 | 3 BHK | 1 | 81.17 | 2 | — |
| A | 8 | 3 BHK | 1 | 82.52 | 2 | — |
| A | 8 | 2 BHK | 1 | 55.96 | 1 | — |
| A | 8 | 3 BHK | 1 | 74.09 | 1 | — |
| A | 8 | 2 BHK | 1 | 56.3 | 1 | — |
| A | 9 | 3 BHK | 1 | 79.67 | 2 | — |
| A | 9 | 2 BHK | 1 | 56.3 | 1 | — |
| A | 9 | 3 BHK | 1 | 74.09 | 1 | — |
| A | 9 | 2 BHK | 1 | 55.96 | 1 | — |
| A | 9 | 3 BHK | 1 | 81.17 | 2 | — |
| A | 9 | 3 BHK | 1 | 82.52 | 2 | — |
| A | 9 | 2 BHK | 1 | 55.96 | 1 | — |
| A | 9 | 3 BHK | 1 | 74.09 | 1 | — |
| A | 9 | 2 BHK | 1 | 56.3 | 1 | — |
| A | 9 | 3 BHK | 1 | 80.51 | 2 | — |
| A | 10 | 3 BHK | 1 | 79.67 | 2 | — |
| A | 10 | 2 BHK | 1 | 56.3 | 1 | — |
| A | 10 | 3 BHK | 1 | 74.09 | 1 | — |
| A | 10 | 2 BHK | 1 | 55.96 | 1 | — |
| A | 10 | 3 BHK | 1 | 81.17 | 2 | — |
| A | 10 | 3 BHK | 1 | 82.52 | 2 | — |
| A | 10 | 3 BHK | 1 | 80.51 | 1 | — |
| A | 10 | 2 BHK | 1 | 56.3 | 1 | — |
| A | 5 | 2 BHK | 1 | 55.96 | 1 | — |
| A | 5 | 3 BHK | 1 | 74.09 | 1 | — |
| A | 4 | 3 BHK | 1 | 74.09 | 1 | — |
| A | 8 | 3 BHK | 1 | 80.51 | 2 | — |
Permits & Approvals
Permit NoAffordable Housing/03813/VDA/BP/23-24/0966/12082024
Permit Date2024-12-04
Valid Until2029-12-03
Extendable Until2032-12-03
Documents
Filing documents
- Proforma of Completion Certificate(Occupancy)
- Other
- Details of Encumbrances#New(2025-11-24)View
- Commencement Certificate#New(2025-11-24)View
- Other Plan(If Any)#New(2025-11-24)View
- Proforma of Application Form#New(2025-11-25)View
- Proforma of Allotment Letter#New(2025-11-25)View
- Proforma of Conveyance Deed#New(2025-11-25)View
- Waste Disposal Plan#New(2025-12-27)View
- Water Supply Plan#New(2025-12-27)View
- Electricity Supply Plan#New(2025-12-27)View
- Development Work Plan#New(2025-11-25)View
- Affidavit (Form-B)#New(2025-11-25)View
- CA CERTIFICATE#New(2025-12-05)View
- ARCHITECT CERTIFICATE#New(2025-12-05)View
- ENGINEERS CERTIFICATE#New(2025-12-05)View
- Proforma of Agreement for Sale#New(2025-11-25)View
Project Team
Architect AddressL-6/59-Shastri Nagar Colony Sigra-Varanasi U.P-India
Engineer AddressStructure Design Studio, Shop no. 28, Sector-11D, DLF Market, Faridabad-121006
Developer & Contact
Developer
Promoter NameONKAR ATS INFRACITY
Promoter AddressArazi no. 367KA, Ashokpuram Colony, Bypass , Varanasi, UP 221011
Company TypePartnership Firm
Mobile7005726654
EmailOnkaratsinfracity23@gmail.com
Registered AddressArazi no. 367KA, Ashokpuram Colony, Bypass , Varanasi, UP 221011
Contractor Address158/SF-1, Gyan Khnad-1, Indirapuram, Ghaziabad-201014
Bank Accounts
Account Typecollection
Account Number386905002617
Account NameOnkar ATS Infracity Collection Account For Maya Regal Height
Bank NameICICI Bank Ltd.
BranchVaranasi
Branch AddressS-2/326 E, Mohalla/Ward Sikraul, Varanasi, Uttar Pradesh, 221002
Branch DistrictVaranasi
Branch StateUttar Pradesh
IFSCICIC0003869
Branch Emailgaurav.kumarsrivastava@icicibank.com
Account Typeseparate
Account Number386905002618
Account NameOnkar ATS Infracity Separate Account For Maya Regal Height
Bank NameICICI Bank Ltd.
BranchVaranasi
Branch AddressS-2/326 E, Mohalla/Ward Sikraul, Varanasi, Uttar Pradesh, 221002
Branch DistrictVaranasi
Branch StateUttar Pradesh
IFSCICIC0003869
Account Typetransaction
Account Number386905002619
Account NameOnkar ATS Infracity Rera Transaction Account For Maya Regal Height
Bank NameICICI Bank Ltd.
BranchVaranasi
Branch AddressS-2/326 E, Mohalla/Ward Sikraul, Varanasi, Uttar Pradesh, 221002
Branch DistrictVaranasi
Branch StateUttar Pradesh
IFSCICIC0003869
Development & Facilities
Development works
Demarcation Of PlotsWe have one plot of size 3220 sq. mtr.having 1 main entrance gate from the 75 m wide front road.
Boundary Wall2 m high and 230 mm thick Brick work and rcc work in column and beam. At the center face of boundary wall there would be a Logo of the project which give a beautiful iconic design to boundary wall.
Road WorkFrom the main entrance gate we have 80 mm thick interlocking brick /RCC road through out the project. Whose wideness starts from 6 mtr.
FootpathsWe would not provide any footpath
Water Supply Including Drinking Water FacilitiesWe will provide Two nos. of pump for the requirement of blocks through underground pipelines. Capacity of pumps -20 HP and water storage tank -35000 LTR *2 water tank
Sewer SystemModular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.when come into force. STP Capacity will be 35 KLD.
DrainStorm water shall be Provided. Storm water from Roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.
ParksWe will provide green area with the different activities and the green area will have gaming facilities for kids.
Tree PlantingWe will provide many type of trees all along the boundary wall & green area
Design For Electric Supply Including Street LightingWe will design & implement the system as per local electricity Board and will consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, Fountain, STP, Pump room etc. Capacity of Transformer -250 kva *2 . Generator- 40 kva DG Set
Community BuildingsNA
Treatment And Disposal System Of Sewage And Sullage WaterModular Sewerage system shall be Provided. All Sewerage water shall be go to the STP and overflow from the STP shall be connect with the Municipal sewerage system.,when come into force. STP Capacity will be 35 KLD.
Solid Waste Management And Disposal SystemThere are a proper garbage collection area provided for the solid waste management.
Water Conservation SystemWe will suggest to individual to use low flow fixtures as well dual flush cistern and raw water harvesting system to reduce the water consumption and improve the ground water level.
Energy Management System Including Use Of Renewable EnergyWe will use LED lights fitting in external area as well as solar lights. In Pump room also all the equipment shall have energy efficient motor. And we will suggest to individual also to use.
Fire Protection And Fire Safety SystemWe will provide Fire Fighting facility in common areas while Individual owner can install their own system as per their and local authorities requirement.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesWe will have staircases which will be provided with emergency exit doors and emergency exit gates
Other Miscellaneous WorkNA
Financials
Registration Fee (₹)21500
Project Duration (months)54