Registered
Total units
64
Overview
Registration Date2025-10-13
RERA NumberUPRERAPRJ327121/10/2025
Promoter IDUPRERAPRM95181
Proposed Start2025-01-01
Proposed Completion2029-03-31
Location
DistrictBarabanki
TehsilNawabganj
VillageVillage- Mothari
LocalityPargana- Nawabganj,
AddressGata No. 31,
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units64
Unit Types1
Blocks16
Floors4
Khasra records (1)
- 31· Khasra· 2945 m²
Inventory
Apartments (64 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| 17 | GF | 3 BHK | 1 | 59.61 | 2 | — |
| 17 | 1 | 3 BHK | 1 | 59.61 | 2 | — |
| 17 | 2 | 3 BHK | 1 | 59.61 | 2 | — |
| 17 | 3 | 3 BHK | 1 | 59.61 | 2 | — |
| 18 | GF | 3 BHK | 1 | 59.61 | 2 | — |
| 18 | 1 | 3 BHK | 1 | 59.61 | 2 | — |
| 18 | 2 | 3 BHK | 1 | 59.61 | 2 | — |
| 18 | 3 | 3 BHK | 1 | 59.61 | 2 | — |
| 19 | GF | 3 BHK | 1 | 59.61 | 2 | — |
| 19 | 1 | 3 BHK | 1 | 59.61 | 2 | — |
| 19 | 2 | 3 BHK | 1 | 59.61 | 2 | — |
| 19 | 3 | 3 BHK | 1 | 59.61 | 2 | — |
| 20 | GF | 3 BHK | 1 | 59.61 | 2 | — |
| 20 | 1 | 3 BHK | 1 | 59.61 | 2 | — |
| 20 | 2 | 3 BHK | 1 | 59.61 | 2 | — |
| 20 | 3 | 3 BHK | 1 | 59.61 | 2 | — |
| 45 | GF | 3 BHK | 1 | 59.61 | 2 | — |
| 45 | 1 | 3 BHK | 1 | 59.61 | 2 | — |
| 45 | 2 | 3 BHK | 1 | 59.61 | 2 | — |
| 45 | 3 | 3 BHK | 1 | 59.61 | 2 | — |
| 46 | GF | 3 BHK | 1 | 59.61 | 2 | — |
| 46 | 1 | 3 BHK | 1 | 59.61 | 2 | — |
| 46 | 2 | 3 BHK | 1 | 59.61 | 2 | — |
| 46 | 3 | 3 BHK | 1 | 59.61 | 2 | — |
| 47 | GF | 3 BHK | 1 | 59.61 | 2 | — |
| 47 | 1 | 3 BHK | 1 | 59.61 | 2 | — |
| 47 | 2 | 3 BHK | 1 | 59.61 | 2 | — |
| 47 | 3 | 3 BHK | 1 | 59.61 | 2 | — |
| 48 | GF | 3 BHK | 1 | 59.61 | 2 | — |
| 48 | 1 | 3 BHK | 1 | 59.61 | 2 | — |
| 48 | 2 | 3 BHK | 1 | 59.61 | 2 | — |
| 48 | 3 | 3 BHK | 1 | 59.61 | 2 | — |
| 49 | GF | 3 BHK | 1 | 59.61 | 2 | — |
| 49 | 1 | 3 BHK | 1 | 59.61 | 2 | — |
| 49 | 2 | 3 BHK | 1 | 59.61 | 2 | — |
| 49 | 3 | 3 BHK | 1 | 59.61 | 2 | — |
| 50 | GF | 3 BHK | 1 | 59.61 | 2 | — |
| 50 | 1 | 3 BHK | 1 | 59.61 | 2 | — |
| 50 | 2 | 3 BHK | 1 | 59.61 | 2 | — |
| 50 | 3 | 3 BHK | 1 | 59.61 | 2 | — |
| 51 | GF | 3 BHK | 1 | 59.61 | 2 | — |
| 51 | 1 | 3 BHK | 1 | 59.61 | 2 | — |
| 51 | 2 | 3 BHK | 1 | 59.61 | 2 | — |
| 51 | 3 | 3 BHK | 1 | 59.61 | 2 | — |
| 52 | GF | 3 BHK | 1 | 59.61 | 2 | — |
| 52 | 1 | 3 BHK | 1 | 59.61 | 2 | — |
| 52 | 2 | 3 BHK | 1 | 59.61 | 2 | — |
| 52 | 3 | 3 BHK | 1 | 59.61 | 2 | — |
| 53 | GF | 3 BHK | 1 | 59.61 | 2 | — |
| 53 | 1 | 3 BHK | 1 | 59.61 | 2 | — |
| 53 | 2 | 3 BHK | 1 | 59.61 | 2 | — |
| 53 | 3 | 3 BHK | 1 | 59.61 | 2 | — |
| 54 | GF | 3 BHK | 1 | 59.61 | 2 | — |
| 54 | 1 | 3 BHK | 1 | 59.61 | 2 | — |
| 54 | 2 | 3 BHK | 1 | 59.61 | 2 | — |
| 54 | 3 | 3 BHK | 1 | 59.61 | 2 | — |
| 55 | GF | 3 BHK | 1 | 59.61 | 2 | — |
| 55 | 1 | 3 BHK | 1 | 59.61 | 2 | — |
| 55 | 2 | 3 BHK | 1 | 59.61 | 2 | — |
| 55 | 3 | 3 BHK | 1 | 59.61 | 2 | — |
| 56 | GF | 3 BHK | 1 | 59.61 | 2 | — |
| 56 | 1 | 3 BHK | 1 | 59.61 | 2 | — |
| 56 | 2 | 3 BHK | 1 | 59.61 | 2 | — |
| 56 | 3 | 3 BHK | 1 | 59.61 | 2 | — |
Permits & Approvals
Permit No63,64/MAP/Jila Panchyat/2024-25
Permit Date2024-04-22
Valid Until2027-04-21
Extendable Until2029-04-21
Documents
Filing documents
- Details of Encumbrances
- Other Plan(If Any)
- Proforma of Completion Certificate(Occupancy)
- CA CERTIFICATE
- CA CERTIFICATE
- CA CERTIFICATE
- CA CERTIFICATE
- ARCHITECT CERTIFICATE
- ARCHITECT CERTIFICATE
- ENGINEERS CERTIFICATE
- Details of Encumbrances#New(2025-09-10)View
- Commencement Certificate#New(2025-07-07)View
- Proforma of Application Form#New(2025-07-07)View
- Proforma of Allotment Letter#New(2025-07-07)View
- Proforma of Conveyance Deed#New(2025-07-07)View
- Waste Disposal Plan#New(2025-07-07)View
- Water Supply Plan#New(2025-07-07)View
- Electricity Supply Plan#New(2025-07-07)View
- Development Work Plan#New(2025-07-07)View
- Affidavit (Form-B)#New(2025-07-07)View
- CA CERTIFICATE#New(2025-09-26)View
- ARCHITECT CERTIFICATE#New(2025-10-09)View
- ENGINEERS CERTIFICATE#New(2025-09-22)View
- Other#New(2025-08-21)View
- Proforma of Agreement for Sale#New(2025-08-21)View
Project Team
Architect AddressBlock C-12, Shop No. F-12, Near Maxx Mall, Sanjay Place Agra-282002
Engineer AddressPreet Vihar, Dehradun - 248001
Developer & Contact
Developer
Promoter NameMAXMIRACLE BUILDCARE LLP
Promoter AddressFIRST FLOOR (1/2) , A.C.TOWER , 4 , SURENDRA NAGAR LUCKNOW Lucknow UP 226016 IN
Company TypePartnership Firm
Mobile9554958800
EmailFCAKANPUR@GMAIL.COM
Registered AddressFIRST FLOOR (1/2) , A.C.TOWER , 4 , SURENDRA NAGAR LUCKNOW Lucknow UP 226016 IN
Contractor Address192, New Colony, Chaugurgy, Etawah - 206001
Bank Accounts
Account Typecollection
Account Number051505003114
Account NameMAXMIRACLE BUILDCARE LLP COLLECTION ACCOUNT FOR MIRACLE HOMES PHASE II
Bank NameICICI BANK
BranchBARABANKI BRANCH
Branch AddressVERMA MARKET, AYODHYA ROAD, BARABANKI
Branch DistrictBarabanki
Branch StateSelect
IFSCICIC0000515
Branch Emailpradeep.singh8@icicibank.com
Account Typeseparate
Account Number051505003115
Account NameMAXMIRACLE BUILDCARE LLP- SEPARATE ACCOUNT FOR MIRACLE HOMES PHASE II
Bank NameICICI BANK
BranchBARABANKI BRANCH
Branch AddressVERMA MARKET, AYODHYA ROAD BARABANKI
Branch DistrictBarabanki
Branch StateUttar Pradesh
IFSCICICOOOO515
Account Typetransaction
Account Number051505501027
Account NameMAXMIRACLE BUILDCARE LLP-TRANSACTION ACCOUNT FOR MIRACLE HOMES PHASE II
Bank NameICICI BANK
BranchBARABANKI BRANCH
Branch AddressVERMA MARKET, AYODHYA ROAD, BARABANKI
Branch DistrictBarabanki
Branch StateUttar Pradesh
IFSCICIC0000515
Development & Facilities
Development works
Demarcation Of PlotsPlots will be demarcated as per MAP approved by Jila Panchayat Barabanki
Boundary Wall9" thick and 7" height boundary wall, the proper foundation and frame structure of RCC and constructed
Road Workinside the project- Trimix concrete flooring
FootpathsProvision of both side foothpath of the road construction with red heavy duty tiles
Water Supply Including Drinking Water Facilitiessubmersible pump system will be installed for individual tower, the ground water will be pumped through the pump with capacity to 2000 ltr water tank.
Sewer Systemsoil and waste from building is connected to external manhole and diverted to STP
DrainExternal drainage is connected via manhole and collected to rainwater harvesting
ParksPark consist a lawn and tree at periphery
Tree PlantingTrees with attractive flowering
Design For Electric Supply Including Street LightingProvision as per Project Approved, Provision Of Both Side Street Light
Community BuildingsNot Applicable
Treatment And Disposal System Of Sewage And Sullage WaterProvision of sewage treatment plant (STP)
Solid Waste Management And Disposal SystemThe Dustbins will be installed, Thereon the garbage will be Disposed off to the Specify location by the Jila Panchyat
Water Conservation SystemRain Water Harvesting is proposed to conserve rainwater and water efficient fixtures used
Energy Management System Including Use Of Renewable EnergyNot Applicable
Fire Protection And Fire Safety SystemNot Applicable
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicable
Emergency Evacuation ServicesHaving Staircase for Emergency Evacuation Service
Other Miscellaneous WorkNot Applicable
Financials
Registration Fee (₹)20000
Project Duration (months)51