Registered
Total units
56
Overview
Registration Date2026-01-19
RERA NumberUPRERAPRJ646433/01/2026
Promoter IDUPRERAPRM392930
Proposed Start2026-02-01
Proposed Completion2029-07-25
Location
DistrictLucknow
TehsilSarojini Nagar
VillageKANOSI
AddressGATA NO-2137/2 AND 2146 AT PARGANA
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units56
Unit Types2
Blocks1
Floors6
Khasra records (1)
- 2137/2 AND 2146· Khasra· 2812 m²
Inventory
Apartments (56 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| NARAYANA ESTATE | 1 | 2 BHK | 1 | 89.7 | 3 | — |
| NARAYANA ESTATE | 1 | 2 BHK | 1 | 77.97 | 2 | — |
| NARAYANA ESTATE | 1 | 2 BHK | 1 | 71.52 | 1 | — |
| NARAYANA ESTATE | 1 | 2 BHK | 1 | 71.51 | 1 | — |
| NARAYANA ESTATE | 1 | 2 BHK | 1 | 78.07 | 3 | — |
| NARAYANA ESTATE | 1 | 2 BHK | 1 | 75.45 | 2 | — |
| NARAYANA ESTATE | 1 | 2 BHK | 1 | 73.33 | 2 | — |
| NARAYANA ESTATE | 1 | 2 BHK | 1 | 70.15 | 3 | — |
| NARAYANA ESTATE | 1 | 2 BHK | 1 | 59.91 | 2 | — |
| NARAYANA ESTATE | 1 | 2 BHK | 1 | 88.14 | 2 | — |
| NARAYANA ESTATE | 1 | 2 BHK | 1 | 61.58 | 1 | — |
| NARAYANA ESTATE | 2 | 4 BHK | 1 | 169.76 | 4 | — |
| NARAYANA ESTATE | 2 | 2 BHK | 1 | 71.53 | 1 | — |
| NARAYANA ESTATE | 2 | 2 BHK | 1 | 71.5 | 1 | — |
| NARAYANA ESTATE | 2 | 2 BHK | 1 | 75.45 | 2 | — |
| NARAYANA ESTATE | 2 | 2 BHK | 1 | 78.06 | 2 | — |
| NARAYANA ESTATE | 2 | 2 BHK | 1 | 73.33 | 2 | — |
| NARAYANA ESTATE | 2 | 2 BHK | 1 | 70.27 | 2 | — |
| NARAYANA ESTATE | 2 | 2 BHK | 1 | 59.91 | 2 | — |
| NARAYANA ESTATE | 2 | 2 BHK | 1 | 88.14 | 2 | — |
| NARAYANA ESTATE | 2 | 2 BHK | 1 | 61.758 | 3 | — |
| NARAYANA ESTATE | 3 | 4 BHK | 1 | 169.76 | 4 | — |
| NARAYANA ESTATE | 3 | 2 BHK | 1 | 78.06 | 2 | — |
| NARAYANA ESTATE | 3 | 2 BHK | 1 | 73.33 | 2 | — |
| NARAYANA ESTATE | 3 | 2 BHK | 1 | 70.27 | 2 | — |
| NARAYANA ESTATE | 3 | 2 BHK | 1 | 59.91 | 2 | — |
| NARAYANA ESTATE | 3 | 2 BHK | 1 | 88.14 | 2 | — |
| NARAYANA ESTATE | 3 | 2 BHK | 1 | 61.58 | 3 | — |
| NARAYANA ESTATE | 3 | 2 BHK | 1 | 71.53 | 1 | — |
| NARAYANA ESTATE | 3 | 2 BHK | 1 | 71.5 | 1 | — |
| NARAYANA ESTATE | 3 | 2 BHK | 1 | 75.45 | 2 | — |
| NARAYANA ESTATE | 4 | 4 BHK | 1 | 169.73 | 4 | — |
| NARAYANA ESTATE | 4 | 2 BHK | 1 | 75.45 | 2 | — |
| NARAYANA ESTATE | 4 | 2 BHK | 1 | 78.06 | 2 | — |
| NARAYANA ESTATE | 4 | 2 BHK | 1 | 73.33 | 2 | — |
| NARAYANA ESTATE | 4 | 2 BHK | 1 | 70.27 | 2 | — |
| NARAYANA ESTATE | 4 | 2 BHK | 1 | 59.91 | 2 | — |
| NARAYANA ESTATE | 4 | 2 BHK | 1 | 88.14 | 2 | — |
| NARAYANA ESTATE | 4 | 2 BHK | 1 | 61.58 | 3 | — |
| NARAYANA ESTATE | 4 | 2 BHK | 1 | 71.58 | 1 | — |
| NARAYANA ESTATE | 4 | 2 BHK | 1 | 71.05 | 1 | — |
| NARAYANA ESTATE | 5 | 4 BHK | 1 | 169.73 | 4 | — |
| NARAYANA ESTATE | 5 | 4 BHK | 1 | 131.26 | 4 | — |
| NARAYANA ESTATE | 5 | 4 BHK | 1 | 144.73 | 2 | — |
| NARAYANA ESTATE | 5 | 2 BHK | 1 | 75.45 | 2 | — |
| NARAYANA ESTATE | 5 | 2 BHK | 1 | 78.06 | 2 | — |
| NARAYANA ESTATE | 5 | 2 BHK | 1 | 73.33 | 2 | — |
| NARAYANA ESTATE | 5 | 2 BHK | 1 | 88.14 | 2 | — |
| NARAYANA ESTATE | 5 | 2 BHK | 1 | 56.45 | 3 | — |
| NARAYANA ESTATE | 6 | 4 BHK | 1 | 170.02 | 4 | — |
| NARAYANA ESTATE | 6 | 4 BHK | 1 | 144.72 | 2 | — |
| NARAYANA ESTATE | 6 | 4 BHK | 1 | 152.8 | 4 | — |
| NARAYANA ESTATE | 6 | 4 BHK | 1 | 131.26 | 4 | — |
| NARAYANA ESTATE | 6 | 2 BHK | 1 | 75.45 | 2 | — |
| NARAYANA ESTATE | 6 | 2 BHK | 1 | 88.14 | 2 | — |
| NARAYANA ESTATE | 6 | 2 BHK | 1 | 52.94 | 3 | — |
Permits & Approvals
Permit NoGROUP HOUSING/12296/LDA/BP/21-22/0997/05062024
Permit Date2024-07-26
Valid Until2029-07-25
Extendable Until2031-07-24
Documents
Filing documents
- Proforma of Completion Certificate(Occupancy)
- Other
- Details of Encumbrances#New(2025-12-09)View
- Commencement Certificate#New(2025-12-09)View
- Other Plan(If Any)#New(2025-12-09)View
- Proforma of Application Form#New(2025-12-09)View
- Proforma of Allotment Letter#New(2025-12-09)View
- Proforma of Conveyance Deed#New(2025-12-09)View
- Waste Disposal Plan#New(2025-12-09)View
- Water Supply Plan#New(2025-12-09)View
- Electricity Supply Plan#New(2025-12-09)View
- Development Work Plan#New(2025-12-09)View
- Affidavit (Form-B)#New(2025-12-09)View
- CA CERTIFICATE#New(2026-01-07)View
- ARCHITECT CERTIFICATE#New(2025-12-09)View
- ENGINEERS CERTIFICATE#New(2026-01-01)View
- Proforma of Agreement for Sale#New(2026-01-07)View
Project Team
Architect Address5/962, GOMTI NAGAR EXT, LUCKNOW
Engineer Address8/14, INDIRA NAGAR, LUCKNOW
Developer & Contact
Developer
Promoter NameSANJEEVA CONSTRUCTIONS
Promoter AddressFlat No. 101-A 1 Wala Qadar Road, Qaiserbagh Lucknow
Company TypeProprietorship Firm
Mobile9935393447
Emailsupport@sanjeevaconstructions.in
Registered AddressFlat No. 101-A 1 Wala Qadar Road, Qaiserbagh Lucknow
Contractor Address312, 3RD FLOOR, SKYLINE PLAZA 1- SHUSHANT GOLF CITY, LUCKNOW
Bank Accounts
Account Typecollection
Account Number6671002900000089
Account NameSANJEEVA CONSTRUCTIONS COLLECTION ACCOUNT FOR NARAYANA ESTATE
Bank NamePUNJAB NATIONAL BANK
Branch94, M.G , BRANCH
Branch AddressPWD LUCKNOW, 94 M.G.MARG, LUCKNOW, UP
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCPUNB0667100
Branch Emailbo6671@pnb.co.in
Account Typeseparate
Account Number6671002900000098
Account NameSANJEEVA CONSTRUCTIONS SEPARATE ACCOUNT FOR NARAYANA ESTATE
Bank NamePUNJAB NATIONAL BANK
Branch94, M.G.MARG, BRANCH
Branch AddressPWD LUCKNOW 94 M.G.MARG, LUCKNOW, UP
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCPUNB0667100
Account Typetransaction
Account Number6671002100004423
Account NameSANJEEVA CONSTRUCTIONS TRANSACTION ACCOUNT FOR NARAYANA ESTATE
Bank NamePUNJAB NATIONAL BANK
Branch94, M.G.MARG, BRANCH
Branch AddressPWD LUKCNOW, 94 M.G.MARG, LUCKNOW
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCPUNB0667100
Development & Facilities
Development works
Demarcation Of PlotsTHE PROJECT LAND WILL BE DEMARCATED BY ITS BOUNDARY WALL TO THE EXACT SHAPE, SIZE AND ORIENTATION AS PER SANCTIONED MAP BY LDA.
Boundary WallA 2.4M HIGH BOUNDARY WALL OF BRICK AND PLASTIC WILL BE CONSTRUCTED WITH DEEP FOUNDATION TO BE EARTHQUAKE RESISTANT. THE WALL WILL THEN BE PLASTERED AND PAINTED AS PER ESTHETICS.
Road WorkA PAVEMENT QUALITY CONCRETE WILL BE LAID IN THICKNESS 200MM ON TOP OF COMPACTED DRY LEAN CONCRETE/COARSE GRAINED SUB BASE.
FootpathsAN M-15 GRADE OF PAVERS BLOCK/INTERLOCKING TILE WILL BE LAID IN THE PROJECT FOR WALKING AREAS. TILES WILL BE 3 TO 4 INCH THICK AND THE COLOR PATTERS WILL BE LASTING AND VISIBLE AT ALL HOURS.
Water Supply Including Drinking Water FacilitiesWE WILL FILL THE 2 UNDERGROUND DOMESTIC WATER TANK EACH CAPACITY OF 100KL THROUGH THE BOREWELL , AND FROM THERE THE 2 OVERHEAD WATER TANKS ON TERRACE HAVING CAPACITY OF 100KL EACH WILL BE FILLED USING PUMPS. WATER SUPPLY TO THE FLATS WILL BE PROVIDED THROUGH TESE TANKS. SEPARATE SUPPLY INES WILL BE LAID FOR THE TOP 2 FLOORS, ANOTHER DEDICATED LINE FOR OTHER FLOORS, AND SEPARATE LINE FOR THE REMAINING FLOORS. THE ARRANGEMENT WILL ENSURE THAT NO ONT E FACES ANY WATER PRESSURE ISSUED. WE ALSO HAVE 2 FIRE UNDERGROUND TANKS EACH WITH CAPACITY OF 100KL.
Sewer SystemSINCE THIS IS AN LDA LAND AND FALLS UNDER THE MUNICIPAL CORPORATION, THESE FACILITIES HAVE BEEN PROVIDED BY MUNICIPAL CORPORATION. WE WILL CONNECT OUR SEWER LINE MEASURING 250MM DIAMETER TOT EH MUNICIPAL CORPORATION MAIN SEWER LINE .
DrainA WELL DESINED SYSTEM OF COVERED AND UNDERGROUND DRAIN MEASURING 200MM DIAMENTER SHALL BE IN PLACE, STORM WATER AND ROOF RAINWATER WILL BE DIVERTED TO RAINWATER HARVESTING ARRANGEMENTAS PER NORMS.
ParksAS PER THE SANCTIONED PLAN, THE BUILDING LAYOUT INCLUDES DESIGNATED GRENAREAS ON THREESIDES. WE WILL DEVELOP THE SITE EXACTLY AS PER SANCTIONED LAYOUT ENSURING ALL GREEN ZONES. THER EIS 1 GREEN PARK.
Tree Planting2-3 METER HIGHT TREE WILL BE PLANTED ALONG THE BOUNDARY WALL AND FRONT SIDE GREEN BELT PROVIDED BY LDA WILL ALSO BE.
Design For Electric Supply Including Street LightingWE WILL DESIGN AND IMPLEMENT THE SYSTEM AS PER LOCAL ELECTRICITY BOARD AND WILL CONSIDERSENTRALIZED TRANSFORMER, HT PANEL, LT PANEL, FEEDER PILLERAND DG BACK FOR COMMON SERVICE LIKE EXTERNAL LLIGHTING, PUMP ROOM ETC AND LIGHT BACKUP TO FLATS.
Community BuildingsNA
Treatment And Disposal System Of Sewage And Sullage WaterMODULAR SEWERAGE SYSTEM SHALL BE PROVIDED . ALL SEWERAGE WATER SHALL GO THE STP AND OVERFLOW FROM THE STP SHALL BE CONNECTED TO THE MUNICIPAL SEWERAGE SYSTEM.
Solid Waste Management And Disposal SystemTHE COLLECTION AND DISPOSAL OF SOLID WASTE WILL BE MANAGED IN COORDINATION WITH LOCAL MUNICIPAL CORPORATION TO ENSURE PROPER HANDLING AS PER MUNICIPAL NORMS. ALL WASTE MANAGEMENT ACTIVITIES WILL FOLLOW THE PROCEDURES AND SCHEDULES PRESCRIBED BY THE LOCAL AUTHORITY.
Water Conservation SystemRECHARGEBLE WELLS AND PITS WILL BE PROVIDED TO FACILITIES EFFICIENT GROUNDWATER RECHARGE AND STORMWATER MANAGEMENT. THESE STRUCTURES WILL BE DEVELOPEDAS PER THE APPROVED DESIGN TO ENSURE SUSTAINABLE AND COMPLIANT WATER RECHARGE PRACTICES.
Energy Management System Including Use Of Renewable EnergyWE SHALL BE PROVIDING SOLAR PANELS FOT THE STREET LIGHTINGAND WATER HEATERS.
Fire Protection And Fire Safety SystemA COMPLETE FIRE SAFETY SYSTEM WITH A -GRADE MATERIALS WILL BE INSTALLED AS SPECIFIED IN THE UPFES GYUIDELINES. SPRINKLERS WILL BE INSTALLED IN THE FLATS AS WELL AS IN THE COMMON AREAS, FIRE EXTINGUISHERS, THE FIRE SHAFT (WHICH INCLUDES VALVES FOR HOSEREEL TO SPRINKLE WATER AT THETIME OF EMERGENCY ) , THE FIRE ALARM SYSTEM WILL ALSO BE INSTALLED IN ALL COMMON AREAS.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNA
Emergency Evacuation ServicesALL EMERGENCY EVACUATION SERVICES HAVE BEENARRANGED AS PER THE REQUIRED NORMS, FIRE STAIRS CASES PROVIDED AS PER GUDELINES OF (UPFES) AND ALL GUIDELINESWILL BE STRICTLY FOLLOWED.
Other Miscellaneous WorkNA
Financials
Registration Fee (₹)19500
Project Duration (months)42