NEELAYA CAPITAL
by SHIV BADAN INFRACON PRIVATE LIMITED
Lucknow, Uttar Pradesh · UPRERAPRJ753803/10/2024
Total units
85
Overview
Registration Date2024-10-10
RERA NumberUPRERAPRJ753803/10/2024
Promoter IDUPRERAPRM288567
Proposed Start2024-04-01
Proposed Completion2028-06-15
Location
DistrictLucknow
TehsilLucknow
VillageVillage Ardonamau
LocalityLucknow
AddressKhasra No. 154/3,4 and 151,149 ka min. 150 Ka Min.
StateUttar Pradesh
Map unavailable — no coordinates on file.
Land Details
Project TypeNew
Total Units85
Unit Types3
Blocks1
Floors17
Khasra records (1)
- 154/3,4 and 149, 150, 151 ka Minjumla· Khasra· 413524 m²
Inventory
Apartments (77 rows)
| Block | Floor | Type | Count | Carpet (m²) | Balcony | Garage |
|---|---|---|---|---|---|---|
| Block-1 | BSMNT | OTHER | 0 | 0 | 0 | — |
| Block-1 | GF | OTHER | 0 | 0 | 0 | — |
| Block-1 | 1 | 2 BHK | 1 | 74.88 | 3 | — |
| Block-1 | 1 | 2 BHK | 1 | 75.94 | 3 | — |
| Block-1 | 1 | 3 BHK | 1 | 117.56 | 4 | — |
| Block-1 | 1 | 3 BHK | 1 | 118.92 | 5 | — |
| Block-1 | 1 | 3 BHK | 1 | 117.51 | 4 | — |
| Block-1 | 1 | 3 BHK | 2 | 109.12 | 4 | — |
| Block-1 | 2 | 2 BHK | 1 | 74.88 | 3 | — |
| Block-1 | 2 | 2 BHK | 1 | 75.94 | 3 | — |
| Block-1 | 2 | 3 BHK | 1 | 117.56 | 4 | — |
| Block-1 | 2 | 3 BHK | 1 | 118.92 | 5 | — |
| Block-1 | 2 | 3 BHK | 1 | 117.51 | 4 | — |
| Block-1 | 2 | 3 BHK | 2 | 109.12 | 4 | — |
| Block-1 | 3 | 2 BHK | 1 | 74.88 | 3 | — |
| Block-1 | 3 | 2 BHK | 1 | 75.94 | 3 | — |
| Block-1 | 3 | 3 BHK | 1 | 117.56 | 4 | — |
| Block-1 | 3 | 3 BHK | 1 | 118.92 | 5 | — |
| Block-1 | 3 | 3 BHK | 1 | 117.51 | 4 | — |
| Block-1 | 3 | 3 BHK | 2 | 109.12 | 4 | — |
| Block-1 | 4 | 2 BHK | 1 | 74.88 | 3 | — |
| Block-1 | 4 | 2 BHK | 1 | 75.94 | 3 | — |
| Block-1 | 4 | 3 BHK | 1 | 117.56 | 4 | — |
| Block-1 | 4 | 3 BHK | 1 | 118.92 | 5 | — |
| Block-1 | 4 | 3 BHK | 1 | 117.51 | 4 | — |
| Block-1 | 4 | 3 BHK | 2 | 109.12 | 4 | — |
| Block-1 | 5 | 2 BHK | 1 | 74.88 | 3 | — |
| Block-1 | 5 | 2 BHK | 1 | 75.94 | 3 | — |
| Block-1 | 5 | 3 BHK | 1 | 117.56 | 4 | — |
| Block-1 | 5 | 3 BHK | 1 | 118.92 | 5 | — |
| Block-1 | 5 | 3 BHK | 1 | 117.51 | 4 | — |
| Block-1 | 5 | 3 BHK | 2 | 109.12 | 4 | — |
| Block-1 | 6 | 2 BHK | 1 | 74.88 | 3 | — |
| Block-1 | 6 | 2 BHK | 1 | 75.94 | 3 | — |
| Block-1 | 6 | 3 BHK | 1 | 117.56 | 4 | — |
| Block-1 | 6 | 3 BHK | 1 | 118.92 | 5 | — |
| Block-1 | 6 | 3 BHK | 1 | 117.15 | 4 | — |
| Block-1 | 6 | 3 BHK | 2 | 109.12 | 4 | — |
| Block-1 | 7 | 2 BHK | 1 | 74.88 | 3 | — |
| Block-1 | 7 | 2 BHK | 1 | 75.94 | 3 | — |
| Block-1 | 7 | 3 BHK | 1 | 117.56 | 4 | — |
| Block-1 | 7 | 3 BHK | 1 | 118.92 | 5 | — |
| Block-1 | 7 | 3 BHK | 1 | 117.51 | 4 | — |
| Block-1 | 7 | 3 BHK | 2 | 109.12 | 4 | — |
| Block-1 | 8 | 2 BHK | 1 | 74.88 | 3 | — |
| Block-1 | 8 | 2 BHK | 1 | 75.94 | 3 | — |
| Block-1 | 8 | 3 BHK | 1 | 117.56 | 4 | — |
| Block-1 | 8 | 3 BHK | 1 | 118.92 | 5 | — |
| Block-1 | 8 | 3 BHK | 1 | 117.51 | 4 | — |
| Block-1 | 8 | 3 BHK | 2 | 109.12 | 4 | — |
| Block-1 | 9 | 2 BHK | 1 | 74.88 | 3 | — |
| Block-1 | 9 | 2 BHK | 1 | 75.94 | 3 | — |
| Block-1 | 9 | 3 BHK | 1 | 117.56 | 4 | — |
| Block-1 | 9 | 3 BHK | 1 | 118.92 | 5 | — |
| Block-1 | 9 | 3 BHK | 1 | 117.51 | 4 | — |
| Block-1 | 9 | 3 BHK | 2 | 109.12 | 4 | — |
| Block-1 | 10 | 2 BHK | 1 | 74.88 | 3 | — |
| Block-1 | 10 | 2 BHK | 1 | 75.94 | 3 | — |
| Block-1 | 10 | 3 BHK | 1 | 117.56 | 4 | — |
| Block-1 | 10 | 3 BHK | 1 | 118.92 | 5 | — |
| Block-1 | 10 | 3 BHK | 1 | 117.51 | 4 | — |
| Block-1 | 10 | 3 BHK | 2 | 109.12 | 4 | — |
| Block-1 | 11 | 2 BHK | 1 | 75.02 | 3 | — |
| Block-1 | 11 | 2 BHK | 1 | 75.04 | 3 | — |
| Block-1 | 11 | 3 BHK | 1 | 118.93 | 5 | — |
| Block-1 | 12 | 2 BHK | 1 | 74.91 | 3 | — |
| Block-1 | 12 | 2 BHK | 1 | 75.09 | 3 | — |
| Block-1 | 12 | 3 BHK | 1 | 119.02 | 5 | — |
| Block-1 | 13 | 2 BHK | 1 | 74.91 | 3 | — |
| Block-1 | 13 | 2 BHK | 1 | 75.09 | 3 | — |
| Block-1 | 13 | 3 BHK | 1 | 119.02 | 5 | — |
| Block-1 | 14 | 2 BHK | 1 | 74.91 | 3 | — |
| Block-1 | 14 | 2 BHK | 1 | 75.09 | 3 | — |
| Block-1 | 14 | 3 BHK | 1 | 119.02 | 5 | — |
| Block-1 | 15 | 2 BHK | 1 | 74.91 | 3 | — |
| Block-1 | 15 | 2 BHK | 1 | 75.09 | 3 | — |
| Block-1 | 15 | 3 BHK | 1 | 119.02 | 5 | — |
Permits & Approvals
Permit NoGroupHousing/06834/LDA/BP/21-22/2089/16122022
Permit Date2023-06-16
Valid Until2028-06-15
Extendable Until2031-06-15
Documents
Filing documents
- Details of Encumbrances
- Other Plan(If Any)
- Proforma of Application Form
- Proforma of Allotment Letter
- Proforma of Conveyance Deed
- Proforma of Completion Certificate(Occupancy)
- CA CERTIFICATE
- Other
- Proforma of Agreement for Sale
- Details of Encumbrances#New(2024-09-24)View
- Commencement Certificate#New(2024-07-25)View
- Other Plan(If Any)#New(2024-09-24)View
- Proforma of Application Form#New(2024-09-24)View
- Proforma of Allotment Letter#New(2024-09-24)View
- Proforma of Conveyance Deed#New(2024-09-24)View
- Proforma of Completion Certificate(Occupancy)#New(2024-09-24)View
- Waste Disposal Plan#New(2024-07-25)View
- Water Supply Plan#New(2024-07-25)View
- Electricity Supply Plan#New(2024-07-25)View
- Development Work Plan#New(2024-07-25)View
- Affidavit (Form-B)#New(2024-09-26)View
- CA CERTIFICATE#New(2024-09-24)View
- ARCHITECT CERTIFICATE#New(2024-07-25)View
- ENGINEERS CERTIFICATE#New(2024-07-25)View
- Proforma of Agreement for Sale#New(2024-10-05)View
Land documents
- Sale Deed#37633(2022-10-11)View10476269484.pdf
- Registry Document#2653(2020-02-25)View10476264022.pdf
- Registry Document#20665(2014-12-05)View10476269566.pdf
- Registry Document#16277(2020-09-01)View10476262648.pdf
- Registry Document#14799(2017-12-17)View10476263278.pdf
- Registry Document#00000(2024-10-03)View10476264176.pdf
Project Team
Architect AddressM/s V-Trim Designs, Vijayee tower UGF-1, Vibhuti Khand Lucknow-226010
Engineer AddressD2/26, Vibhuti Khand, Gomti Nagar Lucknow pin-226010
Developer & Contact
Developer
Promoter NameSHIV BADAN INFRACON PRIVATE LIMITED
Promoter AddressKHASRA NO-154/3,4 AND 151,149 KA MIN.,150 KA MIN. VILL-ARDONAMAU ,LUCKNOW
Company TypeCompany
Mobile9839988115
Emailshivbadaninfracon01@gmail.com
Registered AddressKHASRA NO-154/3,4 AND 151,149 KA MIN.,150 KA MIN. VILL-ARDONAMAU ,LUCKNOW
Contractor Address431-6 , OPP J BLOCK PARK ROAD , LUCKNOW
Bank Accounts
Account Typecollection
Account Number43012282368
Account NameShiv Badan Infracon Pvt Ltd – Coll A/c Proj - Neelaya Capital
Bank NameState Bank of India
BranchCommercial Branch Lucknow
Branch Address6A,way Road, Gokhle Marg Lucknow, UP ,Pin-226001
Branch DistrictLucknow
Branch StateSelect
IFSCSBIN0004166
Branch Emailsbi.04166@sbi.co.in
Account Typeseparate
Account Number43012281035
Account NameShiv Badan Infracon Pvt Ltd – Sep A/c Proj - Neelaya Capital
Bank NameState Bank of India
BranchCommercial Branch Lucknow
Branch Address6A,way Road, Gokhle Marg Lucknow, UP ,Pin-226001
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCSBIN0004166
Account Typetransaction
Account Number43012282992
Account NameShiv Badan Infracon Pvt Ltd – Tran A/c Proj - Neelaya Capital
Bank NameState Bank of India
BranchCommercial Branch Lucknow
Branch Address6A,way Road, Gokhle Marg Lucknow, UP ,Pin-226001
Branch DistrictLucknow
Branch StateUttar Pradesh
IFSCSBIN0004166
Development & Facilities
Development works
Demarcation Of PlotsPlot is already demarcated all the development and construction work will be done under the demarcated plot.
Boundary WallBrick work boundary wall at the height of 6ft. combination of RCC is proposed around the project as per sanctioned plan.
Road Work6.00 mt. wide black top road, aggregate of size 0–10 mm mixed with bitumen forms the base, which is coarse and 150 mm thick. Bitumen, such as cutback bitumen, emulsion, and asphalt, finds application in bitumen mix, tack coat,is proposed around the building as per sanctioned plan.
FootpathsFootpath shall be with concrete paving and width roper stand and practice in as city.
Water Supply Including Drinking Water Facilitieso Main Supply Line: Secure main water supply with adequate pressure. o Distribution: Plan vertical risers and horizontal distribution for all floors. o Sewage and Vent: -Outline systems for proper drainage The water line is connected to the water source, which will be a municipal water treatment plant, a well, or another water supply source. Pipelines, pumping stations, and control valves are installed to convey water from the main pup station to various parts of the building and site . The distribution network is designed to optimise flow rates, pressure levels, and water quality and builthroughout the system.
Sewer SystemA centralised sewer system will be provided, a 300 mm to 600 mm diameter R.C.C. sewer line will be provided. The manhole size will be 900 mm dia (main), and the sub-branch line will be 600 mm dia of the manhole provided as per design of MEP system.
DrainStorm water system will be provided which will be connected to the Municipal drain line as per specified plan.
ParksNot Applicable
Tree PlantingMany types of bushes and tree will be planted. Planted trees and bushes is the part of green area as per sanctioned plan.
Design For Electric Supply Including Street LightingA Centralized transformer, HT panel, LT panel, Feeder Pillar, and DG backup for common services like external lighting. is proposed as per sanctioned plan. L.T./L.V. line, 430 V Fidder piller, Ip-43, Street lights, will be provided. A 600x600 mm manhole will be provided for the L.T., L.V., and H.T. lines
Community BuildingsThere is no community building proposed in our project.
Treatment And Disposal System Of Sewage And Sullage WaterThe S.T.P. treats wastewater from the site to remove contaminants and pollutants before discharge into the environment. Treatment processes may include screening, sedimentation, biological treatment (such as activated sludge or bio filtration), and disinfection to meet regulatory standards and protect public health and the environment.
Solid Waste Management And Disposal SystemFor Waste management and garbage collection chambers are proposed as per layout. After completing the project, it will be handed over to the local municipal corporation.
Water Conservation SystemA well-designed rainwater harvesting system shall be provided.
Energy Management System Including Use Of Renewable EnergyWe will use LED lights as well as solar lights in external areas for energy management system.
Fire Protection And Fire Safety Systemo Fire norms shall be followed as per NBC and approval of the fire department. Include smoke detectors, heat detectors, and manual pull stations throughout the building. Centralized monitoring with integration for emergency response. Design: Specify a comprehensive sprinkler system (wet, dry, or pre-action). o Hydraulic Calculations: Conduct calculations for water supply and pressure requirements.
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot applicable
Emergency Evacuation ServicesThe staircase will provided with emergency exit doors in each floor as per fire department specs
Other Miscellaneous WorkGrand entrance lobby shall be provided.
Financials
Registration Fee (₹)26000
Project Duration (months)51