NEW SUNCITY EXT-P1

by CITIZEN HOUSING AND DEVELOPING COOPERATIVE SOCIETY

Prayagraj, Uttar Pradesh · UPRERAPRJ544441/09/2024

Registered

Overview

Registration Date2024-09-05
RERA NumberUPRERAPRJ544441/09/2024
Promoter IDUPRERAPRM9349
Proposed Start2024-01-10
Proposed Completion2029-01-01

Location

DistrictPrayagraj
TehsilPhulpur
VillageJHUNSI
AddressMAUJA ANDAWA & BANDAWA TAHIRPUR
StateUttar Pradesh
Map unavailable — no coordinates on file.

Land Details

Project TypeNew
Plots40

Khasra records (10)

Show all 10 khasra rows
  • 957· Khasra· 2855
  • 958Mi· Khasra· 624
  • 1052· Khasra· 313
  • 1053· Khasra· 313
  • 1054· Khasra· 732
  • 1055Mi· Khasra· 697
  • 1056· Khasra· 741
  • 1057· Khasra· 855
  • 1059· Khasra· 200
  • 1060· Khasra· 210

Inventory

Plots

TypeSize rangeCount
PlotUPTO 100 sqm31
Plot100 to 150 sqm6
Plot150 to 200 sqm2
Plot250 to 500 sqm1

Permits & Approvals

Permit No02/O.C.(T.C.)/ZONE-5/INTEGRATED/DEV.AUTH./2023-24/DATED 10/01/2024
Permit Date2024-01-10
Valid Until2029-01-09
Extendable Until2029-01-09

Documents

Filing documents

  • Other Plan(If Any)
  • Details of Encumbrances#New(2024-07-16)
    View
  • Commencement Certificate#New(2024-07-16)
    View
  • Other Plan(If Any)#New(2024-08-08)
    View
  • Proforma of Application Form#New(2024-07-16)
    View
  • Proforma of Allotment Letter#New(2024-08-08)
    View
  • Proforma of Conveyance Deed#New(2024-07-16)
    View
  • Waste Disposal Plan#New(2024-07-17)
    View
  • Water Supply Plan#New(2024-07-17)
    View
  • Electricity Supply Plan#New(2024-07-17)
    View
  • Development Work Plan#New(2024-07-17)
    View
  • Affidavit (Form-B)#New(2024-07-17)
    View
  • CA CERTIFICATE#New(2024-07-16)
    View
  • ARCHITECT CERTIFICATE#New(2024-07-16)
    View
  • ENGINEERS CERTIFICATE#New(2024-07-16)
    View
  • Other#New(2024-08-08)
    View
  • Proforma of Agreement for Sale#New(2024-07-17)
    View

Land documents

  • Registry Document#3953(2015-05-20)
    11619108160.pdf
    View
  • Registry Document#2994(2020-06-01)
    11619104033.pdf
    View
  • Registry Document#5068(2019-06-03)
    11619102163.pdf
    View
  • Registry Document#9230(2020-11-20)
    11619105084.pdf
    View
  • Registry Document#11693(2021-12-03)
    11619105902.pdf
    View
  • Registry Document#11694(2021-12-03)
    11619106545.pdf
    View
  • Registry Document#11698(2021-12-03)
    11619105587.pdf
    View
  • Registry Document#11697(2021-12-03)
    11619109181.pdf
    View
  • Registry Document#4602(2022-05-06)
    11619102050.pdf
    View
  • Registry Document#413(2022-01-15)
    11619102840.pdf
    View
  • Registry Document#6918(2021-07-01)
    11619107563.pdf
    View
  • Registry Document#9305(2022-08-24)
    11619107174.pdf
    View
  • Registry Document#9300(2022-08-24)
    11619103055.pdf
    View
  • Registry Document#9304(2022-08-24)
    11619104040.pdf
    View
  • Registry Document#9712(2022-09-01)
    11619104919.pdf
    View
  • Registry Document#10618(2022-09-23)
    11619104175.pdf
    View
  • Registry Document#10619(2022-09-23)
    11619104630.pdf
    View
  • Registry Document#10629(2022-09-23)
    11619106439.pdf
    View
  • Registry Document#11228(2022-10-07)
    11619104176.pdf
    View
  • Registry Document#11358(2022-10-11)
    11619104709.pdf
    View
  • Registry Document#11617(2022-10-17)
    11619103064.pdf
    View
  • Registry Document#11630(2022-10-17)
    11619104647.pdf
    View
  • Registry Document#11631(2022-10-17)
    11619103512.pdf
    View
  • Registry Document#3539(2023-04-18)
    11619105635.pdf
    View
  • Registry Document#3538(2023-04-18)
    11619109278.pdf
    View
  • Registry Document#6445(2023-06-26)
    11619106063.pdf
    View
  • Registry Document#BAHI_4/JILD_601/PAGE229_258/SR102(2024-03-12)
    11619101968.pdf
    View

Project Team

Architect Address139, ALLENGANJ, PRAYAGRAJ, UTTAR PRADESH
Engineer Address139, ALLENGANJ, PRAYAGRAJ, UTTAR PRADESH

Developer & Contact

Developer

Promoter NameCITIZEN HOUSING AND DEVELOPING COOPERATIVE SOCIETY
Promoter AddressSAHYOG BHAWAN, 1 MG MARG, CIVIL LINES, ALLAHABAD
Company TypeSocieties
Mobile9335155202
Emailnishithverma.ald@gmail.com
Registered AddressSAHYOG BHAWAN, 1 MG MARG, CIVIL LINES, ALLAHABAD
Contractor Address14, IBRAHIMPUR, TRIVENIPURAM, JHUNSI, PRAYAGRAJ-211019

Bank Accounts

Account Typecollection
Account Number7698357036
Account NameCITIZEN HOUSING DEV COSO COLLECTION AC FOR NEWSUNCITY EXT-P1
Bank NameINDIAN BANK
BranchHINDI SAHITYA SAMMELAN BRANCH
Branch Address12 KP KAKKAR ROAD ALLAHABAD 211003
Branch DistrictPrayagraj
Branch StateUttar Pradesh
IFSCIDIB000A580
Branch Emaila580@indianbank.co.in
Account Typeseparate
Account Number7698360694
Account NameCITIZEN HOUSING DEV COSO-SEPARATE AC FOR NEW SUNCITY EXT-P1
Bank NameINDIAN BANK
BranchHINDI SAHITYA SAMMELAN BRANCH
Branch Address12 KP KAKKAR ROAD PRAYAGRAJ 211003
Branch DistrictPrayagraj
Branch StateUttar Pradesh
IFSCIDIB000A580
Account Typetransaction
Account Number7698357671
Account NameCITIZEN HOUSING DEV COSO TRANSACTION AC FOR NEWSUNCITY EXT-P1
Bank NameINDIAN BANK
BranchHINDI SAHITYA SAMMELAN BRANCH
Branch Address12 KP KAKKAR RAOD PRAYAGRAJ 211003
Branch DistrictPrayagraj
Branch StateUttar Pradesh
IFSCIDIB000A580

Development & Facilities

Development works

Demarcation Of PlotsAS PER APPROVED MAP A TOTAL OF 40 PLOTS ARE BEING DEVELOPED OUT OF WHICH 31 ARE OF 100 SQ. YARD WHILE REST ARE OF VARIOUS SIZES. DEMARCATION OF PLOT WILL BE DONE WITH 5FT (4 INCH) BRICK WALL.
Boundary WallTHE EXTENSION -P1 IS CONJUNCTION WITH THE LARGER INTEGRATED TOWNSHIP WHICH IS DEVELOPED WITH SINGLE ENTRY AND EXIT. THE TOWNSHIP IS BOUNDED BY COMPOUND WALL BUILT ACROSS THE TOWNSHIP. THE SAID BOUNDARY WALL IS CONSTRUCTED WITH 9 INCH BRICK WORK AND 6 FT IN HEIGHT. THE CONSTRUCTION IS DONE WITH FLY-ASH/RED BRICK USING CEMENT MORTAR 1-6 RATIO.
Road WorkAS PER THE DPR OF THE PROJECT ROAD NETWORK IS DEVELOPED ACROSS THE PROJECT IN HIERARCHY FROM 15 MTR., 12 MTR AND 9 MTR. ROAD CONSTRUCTION IS CARRIED OUT WITH BASIC EARTH WORK FOLLOWED BY WBM, GSB AND STONE DUST FOLLOWED WITH EXTENSIVE COMPACTION THEREAFTER GANGA SAND 2 INCH THICK BED IS LAID AND THEREAFTER FINISHED WITH INTERLOCKING PAVERS.
FootpathsTHE FOOTPATHS HAVE BEEN DESIGNED TO CARRY SEVER (6INCH HUME PIPE), WATER LINE (2INCH UPVC) STORM WATER (6INCH PVC PIPE) DRAIN PIPES. ALL THESE SERVICES ARE UNDERGROUND. THE FOOTPATH IS CONSTRUCTED USING CHEQUERD TILES (1FTX1FT) WITH KERB STONE (12 INCH WIDE). AVENUE TREES AND ELECTRICAL POLES ARE INSTALLED ADJACENT TO THESE FOOTPATHS.
Water Supply Including Drinking Water FacilitiesELEVATED WATER TANK OF 125000 LTR CAPACITY FED BY 6 HP BORE-WELL PUMPS IN REDUNDANCY. ARRANGEMENT IS ALSO MADE FOR CHLORINE DOZING. TO DISTRIBUTE POTABLE WATER TO HOUSEHOLDS, A NETWORK OF 2 INCH UPVC PIPES ARE LAID UNDER GROUND FOR WATER SUPPLY WITHIN THE TOWNSHIP
Sewer SystemA NETWORK OF UNDERGROUND 6 INCH HUME PIPES HAVE BEEN LAID TO CARRY SEWERAGE FROM HOUSEHOLD TO STPs PLACED WITHIN THE TOWNSHIP. THE TOWNSHIP IS PLANNED AS A ZERO DISCHARGE DEVELOPMENT. DECENTRALIZED PACKAGED STP OF 40 KLD EACH AS PER SECTOR AREAS DETAILED IN PROJECT DPR ARE BEING COMMISSIONED. THESE PACKAGED STPs ARE BASED ON ANAEROBIC PROCESS TO BREAK DOWN SLUDGE AND SEWER WASTE.
DrainROOF TOP RUN OFF AND KITCHEN WASTE WATER IS DRAINED FROM ROAD AREAS AND HOUSEHOLDS THROUGH 6 INCH PVC PIPES WHICH ARE LAID UNDERGROUND. DEPENDING UPON THE CLASSIFICATION OF WASTE WATER, IT IS EVENTUALLY DRAINED INTO RAIN WATER HARVESTING PITS (4 NOS.), SCREENING FILTERS OR ARTIFICIAL POND (1720 SQ MTR) DEVELOPED WITHIN THE TOWNSHIP.
ParksPARKS AND GREEN AREAS HAVE BEEN DEVELOPED WITHIN THE TOWNSHIP AS PER THE APPROVED MAP. THE TOWNSHIP HAS A PARKS EARMARKED FOR SENIOR CITIZENS WITH SPACE FOR YOGA AND SEATING ARRANGEMENT AND FLOWERING PLANTS AND SHRUBS. SIMILARLY A CHILDREN PARK WITH PLAY STATION AND WALK-THROUGH FOUNTAIN HAS BEEN DEVELOPED. A SPORT CENTER AS PER THE DENSITY NORMS OF THE TOWNSHIP HAS BEEN DEVELOPED WITH CRICKET GROUND, FOOTBALL FIELD, BASKETBALL, VOLLEYBALL, BADMINTON COURT AND SWIMMING POOL. THIS SPORT CENTER IS DEVELOPED OVER 2.5 ACRE OF LAND. AN OPEN AREA GYM IS MADE OVER 250 SQ MTR. OF LAND.
Tree PlantingMORE THAN 700 TREES HAVE BEEN PLANTED WITHIN THE TOWNSHIP. AVENUE TREE SUCH AS GULMOHAR, CHITWAN AND AMALTAS ETC. AND BUSHES, SHRUBS AND HEDGES HAVE BEEN PLANTED IN HIERARCHICAL ORDER. FLOWERING PLANTS AND EVERGREEN PLANTS HAVE BEEN PLANTED IN OPEN AREAS, PARKS AND OTHER INSTALLATION.
Design For Electric Supply Including Street LightingELECTRIC POLES WITH LED STREET LIGHTS ARE PLACED AT 60 FT TO 80 FT INTERVAL. EACH STREET LIGHT INSTALLED WITH WATTAGE OF 100 WATT OR 200 WATT AS PER REQUIREMENT. A TOTAL OF OVER 250 SUCH STREET LIGHT HAVE BEEN INSTALLED WITHIN THE TOWNSHIP.
Community BuildingsCONSTRUCTION OF COMMUNITY HALL/FUNCTION HALL, MULTI PURPOSE HALL WITH KITCHEN HAS BEEN CONSTRUCTED OVER A PLOT SIZE OF 600 SQ MTR( INCLUDING PARKING). THE BUILDING ALSO HOUSES A MODERN GYM AND INDOOR GAMES ROOM.
Treatment And Disposal System Of Sewage And Sullage WaterDECENTRALIZED PACKAGED STPs OF 40 KLD EACH IS BEING INSTALLED AS PER DPR IN VARIOUS SECTORS OF THE TOWNSHIP. SEWAGE AND SULLAGE WATER WILL BE CARRIED FROM HOUSEHOLDS THROUGH UNDER GROUND SERVICES PIPES TO THE STPs. TREATED WATER FROM THE STPs WILL BE USED FOR IRRIGATION OR SENT TO ARTIFICIAL POND (1720 SQ MTR.) DEVELOPED WITHIN THE TOWNSHIP.
Solid Waste Management And Disposal SystemDECENTRALIZED PACKAGED STPs OF 40 KLD EACH IS BEING INSTALLED AS PER DPR IN VARIOUS SECTORS OF THE TOWNSHIP. THESE STPs WORK ON ANAEROBIC PROCESS TO BREAK-DOWN SOLID WASTE AND FILTERED WATER IS RECEIVED FROM THE INCOMING GRAY WATER. THIS FILTERED WATER IS USED FOR IRRIGATION AND WASHING ROADS(POLLUTION CONTROL).
Water Conservation SystemRAIN WATER HARVESTING SYSTEM HAS BEEN DEVELOPED AT FOUR LOCATION WITHIN THE TOWNSHIP AND THE STIPULATED NOC FROM GROUND WATER DEPARTMENT HAS BEEN RECEIVED. RWH PITS OF 50 CuMT. 35 CuMT, 65CuMT, 40 CuMT. ALONG WITH FILTERS HAVE BEEN DEVELOPED FOR THE TOWNSHIP.
Energy Management System Including Use Of Renewable EnergyTHE TOWNSHIP HAS A SANCTIONED LOAD OF 1558 KW FROM PuVVNL, PRAYAGRAJ. INDIVIDUAL HOUSEHOLD ARE SUPPLIED WITH ELECTRIC CONNECTION FROM THE DEPARTMENT. FIVE SOCIETY CONNECTION RANGING FROM 5 KW TO 10 KW HAVE BEEN TAKEN FOR DIFFERENT PURPOSES WITHIN THE TOWNSHIP SUCH AS STREET LIGHTING ,PUMP ROOMS ,FOUNTAINS, TEMPLE, AND OTHER COMMON AREA DEVELOPMENT.
Fire Protection And Fire Safety SystemREQUISITE FIRE PROTECTIONS SYSTEM HAS BEEN DEVELOPERS AS PER REQUIREMENT. BEING A PLOTTED DEVELOPMENT PROJECT. THE REQUIREMENT FOR FIRE PROTECTION IS LIMITED. HOWEVER 10 NUMBERS FIRE HYDRANT AND SAND BUCKETS HAVE BEEN PLACED VARIOUS EASILY ACCESSIBLE AREAS. EVACUATION AREAS HAVE BEEN EARMARKED AT FIVE PLACES WITHIN THE TOWNSHIP.
Social Infrastructure And Other Public Amenities Including Public Health ServicesAS STIPULATED IN THE INTEGRATED TOWNSHIP POLICY, LAND HAS BEEN EARMARKED AND PROVISION HAS BEEN MADE FOR NURSING HOME, SCHOOL ETC WITHIN THE TOWNSHIP WHERE RESIDENTS CAN AVAIL SERVICES ON PAYMENT BASIS.
Emergency Evacuation ServicesFIVE NUMBER OF EMERGENCY EVACUATION AREAS HAVE BEEN EARMARKED IN OPEN SPACE SUCH AS PARK AND TOT-LOTS. WITH A CAPACITY TO HOLD MINIMUM 100 PERSONS AT A TIME IN CASE OF REQUIREMENT. BEING A PLOTTED DEVELOPMENT PROJECT THE NEED FOR SUCH SERVICES IS MINIMAL.
Other Miscellaneous WorkUNDER INTEGRATED TOWNSHIP POLICY OF THE UP GOVERNMENT. DETAILED PROJECT REPORT HAS BEEN APPROVED BY PDA AND DEVELOPMENT AGREEMENT HAS BEEN SIGNED WITH PDA. ALL DEVELOPMENT NORMS, RULES, AND COMMITMENT MADE IN THE DEVELOPMENT AGREEMENT ARE BEING ADHERE TO.

Financials

Registration Fee (₹)43000
Project Duration (months)60